# Cost, trade-offs and resources: why the best design is rarely the strongest

A design is judged by what it costs over its whole life, what it gives up and what it uses up. This module covers discounting and levelised cost, learning curves, scale and standards, material choice under cost, weight and carbon, Pareto trade-offs, recycling, and frugal design in India, with eleven worked estimates.

Source page: https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/

[All courses](https://www.materialinsights.org/learn/) / [Understanding Engineering](https://www.materialinsights.org/learn/engineering/) / Module 13

## Cost, trade-offs and resources: why the best design is rarely the strongest

A design is judged by what it costs over its whole life, what it gives up and what it uses up. This module covers discounting and levelised cost, learning curves, scale and standards, material choice under cost, weight and carbon, Pareto trade-offs, recycling, and frugal design in India, with eleven worked estimates.
 5 parts · 16 sections · about 50 minutes · 0 of 5 parts read

### By the end you will be able to

- Compare two designs by life-cycle cost and present value instead of purchase price.
- Compute a levelised cost of energy from capital cost, upkeep, output and a discount rate, and show how sensitive it is to the rate.
- Use a learning rate and the six-tenths rule to estimate how a price may fall with output and size.
- Rank steel, aluminium and a composite by mass, cost and embodied carbon for the same job.
- Find an optimum and a Pareto front, and explain why the first is flat and the second is a matter of values.
- Describe how resource limits, recycling and local constraints shape a design, using Indian examples.

### Contents

1. [Part 1 Whole-life cost and the price of money](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p1/)

A price tag is one number on one day, but a machine is paid for over years. Engineers therefore compare designs by what they cost to own, not by what they cost to buy. This part builds three tools for that, life-cycle cost, discounting and levelised cost, each worked in rupees.

  - The cheapest thing to buy is often the dearest thing to own
  - Discounting turns rupees at different dates into one comparable number
  - Levelised cost divides a plant's whole-life cost by all the energy it will ever deliver

2. [Part 2 Why things get cheaper: learning, scale and standards](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p2/)

Solar modules, batteries and shipping containers have all become far cheaper per unit, but for different reasons. Some fell because makers learned by doing, some because plants grew larger, and some because everyone agreed to make the same thing. Telling the three apart is the key to guessing what will get cheaper next.

  - A learning curve cuts the price by a fixed share each time total output doubles
  - Bigger plants cost less per unit because cost follows surface and output follows volume
  - Standards spread one design's cost across many users and let parts from different makers fit

3. [Part 3 Choosing a material under cost, weight and carbon](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p3/)

Steel, aluminium and carbon-fibre composite each win on a different count. To choose between them an engineer first fixes the job, then compares the materials on that job, and only then adds price and carbon. The same panel is used throughout this part so that every number can be checked against the last.

  - A fair comparison fixes the job first, and for a stiff panel the lightest material is not the strongest
  - Embodied carbon adds a third axis, and the answer depends on how the metal was made
  - A lighter part pays back its extra carbon only if the product travels far enough

4. [Part 4 Optimising, Pareto fronts and the price of margin](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p4/)

Optimising is the habit of looking for the best compromise when two costs pull in opposite directions. With one goal there is often a single answer. With several, such as cost, weight and carbon, there is a set of answers none of which beats another everywhere. This part shows both and how to tell a robust choice from a fragile one.

  - A single optimum exists where one cost falls as another rises, and it is usually flat
  - With several goals there is no single best, only a front of options that nobody beats on every count
  - A safety margin is a purchase, and the right amount depends on what failure would cost

5. [Part 5 Resources, recycling and designing for the conditions you have](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p5/)

Every design is made from what is available: materials, energy, skills and money. When one of these is short, the design bends around it. This last part looks at where resource limits really bite, how far recycling can ease them, and how designers in India have turned scarcity into products that cost a fraction of the usual price. It ends by drawing the course together.

  - Resource limits appear as concentration, price spikes and delay long before anything runs out
  - Recycling saves most where making the metal from ore takes the most energy, and it is capped by what has been collected
  - Frugal design begins from the user's constraints, so cost falls by a factor and not by a percentage
  - The course ends on one question: what is the bargain, and what does it assume?

6. [Wrap-up Key terms, try it in the table, final quiz, sources](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/review/)

[Start: Part 1, Whole-life cost and the price of money →](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p1/)

## Other sections

- [Whole-life cost and the price of money](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p1/index.md)
- [Why things get cheaper: learning, scale and standards](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p2/index.md)
- [Choosing a material under cost, weight and carbon](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p3/index.md)
- [Optimising, Pareto fronts and the price of margin](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p4/index.md)
- [Resources, recycling and designing for the conditions you have](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/p5/index.md)
- [Key terms, quiz and sources](https://www.materialinsights.org/learn/engineering/cost-tradeoffs-resources/review/index.md)