Data centres and Energy-intensive industry
Their prices have moved together.
Data centres (energy) and Energy-intensive industry (energy): 1 relationship.
How they are linked
1. Price link: same utility prices
Cost and price · Strong · Both ways
Commercial and industrial tariffs are set by the same utilities from the same generation costs. Monthly moves correlate at 0.83, the strongest link here, showing a shared fuel and network cost base rather than any trade between the two users.
- 0.83 monthly change correlation
- 0.63 12-month change correlation
- 1.18 fitted elasticity
Built from the site data on production routes, energy flows, industry value chains, input-output tables and prices.