# Data-centre server: Evolution

Source page: https://www.materialinsights.org/products/p_data_centre_server/prod-evolution/

#### Timeline

The milestones of the product, each with a source

| Year | Event |
|---|---|
| 1989 | Compaq releases the SystemPro in November, perhaps the first server built around the industry-standard x86 PC architecture ^[40]^[29]. |
| 2011 | Facebook launches the Open Compute Project and shares its first data centre designs ^[30]. |
| 2016 | NVIDIA announces the DGX-1, an eight-GPU system for deep learning at USD 129,000 ^[31]. |
| 2020 | EU Ecodesign rules for servers start applying on 1 March 2020: power supply efficiency, idle power, data deletion ^[21]. |
| 2022 | Servers shipped in the United States surpass 6.5 million a year, up from 2.8 to 3.4 million a year from the mid-2000s to 2016 ^[11]. |
| 2023 | NVIDIA sells its DGX H100 at around USD 270,000, and the EU's stricter power supply limits apply from 1 January 2023 ^[32]^[21]. |
| 2025 | World server revenue reaches USD 444.1 billion, up 80.4% on 2024 ^[13]. |

as of 2026-11-16

#### Lineage

The products and technologies it evolved from and into
 Evolved from

- [Personal computer](https://www.materialinsights.org/products/p_personal_computer/) The SystemPro was built on the x86 PC architecture, which servers then took further ^[29].
 Evolved into

- [Cld Cloud computing](https://www.materialinsights.org/technologies/cloud_computing/) 74% of United States servers sat in hyperscale and colocation sites in 2023, where servers became rentable cloud capacity ^[11].

as of 2026-11-16

#### Recipe changes

How what it is made of changed over time, and what drove each change

| Change | From | To | Driver | Source |
|---|---|---|---|---|
| Storage | Four hard disk drives (1.748 kg) in the JRC example rack server of 2015 ^[3] | Two 1.92 TB solid-state drives in the Dell R760 market configuration of 2025 ^[1] | Not stated in the sources opened | ^[3]^[1] |
| Optical drive | An optical disc drive of 0.189 kg (calculated sum of its parts) in the JRC example server ^[3] | None in the Lenovo SR650 parts list ^[4] | Not stated in the sources opened | ^[3]^[4] |
| Power supply efficiency at 50% load | 94% required for single-output supplies from 1 March 2020 ^[21] | 96% required from 1 January 2023 ^[21] | EU Ecodesign Regulation 2019/424 | ^[21] |

as of 2026-11-16

#### What could improve it next

Directions for improvement, today's value and the limit

| Direction | Metric | Today | Limit | Unit | Source |
|---|---|---|---|---|---|
| Less embodied carbon per unit of AI compute | Embodied carbon per exaflop (FP16), HGX baseboard | 0.50 (B200); 0.66 (H100) | Not stated | g CO2e per exaflop | ^[10] |
| More efficient power supplies | Power supply efficiency at 50% load | 96.23 | 100 (physical ceiling) | % | ^[6] |
| Lower idle power | Idle power of a high-end two-socket server | 326.5 | Not stated | W | ^[7] |
| Longer service life through reuse | Economic life of a server | 3 (first user); 9.2 (with a second user) | Not stated | years | ^[28] |

as of 2026-11-16

#### Sources

1. [Life Cycle Assessment of Dell Server PowerEdge R760 (report produced September 2025)](https://www.delltechnologies.com/asset/en-us/products/servers/briefs-summaries/poweredge-r760-life-cycle-assessment.pdf) Dell Technologies, 2025
2. [Analysis of material efficiency requirements of enterprise servers (EUR 27467 EN), Talens Peiró and Ardente, September 2015](https://publications.jrc.ec.europa.eu/repository/bitstream/JRC96944/lb-na-27467-en-n%20.pdf) European Commission Joint Research Centre, 2015
3. [Lenovo Server Product Recyclability Assessment (file dated December 2019; the document shows no date)](https://static.lenovo.com/ww/docs/sustainability/server-recyclability-assessment-dec-2019.pdf) Lenovo
4. [Lenovo ErP Lot9 Information Sheet, Servers & Storage Products: ThinkSystem SR630 V3 (Annex B2, issued 10 January 2023, updated 1 October 2023)](https://cloud.ibm.com/media/docs/downloads/environment-info-datasheets/eco-thinksystem-sr630-v3.pdf) Lenovo, hosted by IBM Cloud, 2023
5. [Technical Documentation for EU Regulation 2019/424 laying down ecodesign requirements for servers and data storage product: ThinkSystem SR650 V3](https://cloud.ibm.com/media/docs/downloads/environment-info-datasheets/SR650v3-Lot9.pdf) IBM Corporation, hosted by IBM Cloud, 2023
6. [NVIDIA HGX B200 Reduces Embodied Carbon Emissions Intensity (19 September 2025)](https://developer.nvidia.com/blog/nvidia-hgx-b200-reduces-embodied-carbon-emissions-intensity) NVIDIA Technical Blog, 2025
7. [2024 United States Data Center Energy Usage Report (LBNL-2001637)](https://eta-publications.lbl.gov/sites/default/files/2024-12/us_data_center_energy_usage_report_lbnl-2001637.pdf) Lawrence Berkeley National Laboratory, 2024
8. [Worldwide Server Market finished 2025 with an all-time record of 444 billion dollars revenue, according to IDC (12 March 2026)](https://www.idc.com/resource-center/press-releases/4q25servertracker/) IDC, 2026
9. [Commission Regulation (EU) 2019/424 of 15 March 2019 laying down ecodesign requirements for servers and data storage products (copy of the Official Journal text on legislation.gov.uk; EUR-Lex did not return the text)](https://www.legislation.gov.uk/eur/2019/424/data.html) legislation.gov.uk, from the EU Official Journal, 2019
10. [Data Center Impact Report: The Financial & Sustainability Case for Circularity (Fenn and Fesch; the document shows no date)](https://opencompute.org/documents/itrenew-the-case-for-circularity-data-center-impact-report-ocp-v11-pdf) ITRenew, hosted by the Open Compute Project
11. [All SystemPro Go: x86 PC Architecture](https://www.hewlettpackardhistory.com/item/all-systempro-go/) Hewlett-Packard History
12. [How the Open Compute Project revolutionized the open hardware community (9 November 2021)](https://tech.facebook.com/engineering/2021/11/open-compute-project/) Meta Engineering, 2021
13. [Nvidia announces a supercomputer aimed at deep learning and AI](https://techcrunch.com/2016/04/05/nvidia-announces-a-supercomputer-aimed-at-deep-learning-and-ai) TechCrunch, 2016
14. [AI Server Cost Analysis – Memory Is The Biggest Loser (Patel and Wong, 29 May 2023)](https://newsletter.semianalysis.com/p/ai-server-cost-analysis-memory-is) SemiAnalysis, 2023
15. [Compaq SystemPro](https://en.wikipedia.org/wiki/Compaq_SystemPro) Wikipedia

## Other sections

- [Summary](https://www.materialinsights.org/products/p_data_centre_server/index.md)
- [Working](https://www.materialinsights.org/products/p_data_centre_server/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_data_centre_server/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_data_centre_server/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_data_centre_server/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_data_centre_server/prod-footprint/index.md)
- [Interventions](https://www.materialinsights.org/products/p_data_centre_server/prod-interventions/index.md)