# Data-centre server: Use case

Source page: https://www.materialinsights.org/products/p_data_centre_server/prod-use/

#### Use cases

Each use, its share of demand and volume, how critical the product is to it and why, and the price paid

| Use case | Share of demand | Volume | Unit | Criticality | Reason | Price | Price unit | Year | Source |
|---|---|---|---|---|---|---|---|---|---|
| Cloud, web and enterprise computing in hyperscale and colocation data centres | 74% | – | – | Essential | Cloud services run on servers, and firms cannot rent computing without a provider's servers somewhere. | – | – | 2023 | LBNL estimates that 74% of United States servers were in hyperscale and colocation data centres in 2023 ^[11] |
| Servers in firms' and governments' own computer rooms and small data centres | 26% | – | – | Important | Much of this work could move to rented cloud capacity, at a cost in control, latency or data rules. | – | – | 2023 | Calculated as 100% minus the 74% in hyperscale and colocation centres ^[11] |
| AI training and inference (GPU servers; overlaps the rows above) | 17% | 24.7 | billion USD of AI-optimised servers sold by Dell in its fiscal 2026; share is of 2026 forecast server shipments (units) | Essential | Large AI models need many GPUs working together, which general-purpose servers cannot supply at useful speed. | 270,000 | USD per DGX H100, 2023 | 2026 | ^[14]^[19]^[32] |

as of 2026-11-16

#### Industries that buy it

The industries and kinds of firm that buy it, for which use case, and how critical it is to them
 Used by

- [Hyperscale cloud providers](https://www.materialinsights.org/industries/data_centres/) Cloud, web and AI services · criticality essential With colocation operators, they hold 74% of United States servers (2023) ^[11]; no source splits the two.
- [Colocation and wholesale data-centre operators](https://www.materialinsights.org/industries/data_centres/) Servers placed by tenants in rented space · criticality essential Included in the 74% above ^[11].
- [Foundation model developers](https://www.materialinsights.org/industries/ai_platforms/) Training and running AI models · criticality essential GPU servers are the main hardware for training; the share of AI servers they buy was not found.

as of 2026-11-16

#### What it competes with

The products and technologies that compete with it in each use case
 Competes with

- [Cld Cloud computing](https://www.materialinsights.org/technologies/cloud_computing/) Firms' and governments' own computer rooms Renting capacity from a provider replaces owned servers; the provider then buys the servers instead, so demand moves rather than disappears (74% of United States servers were in hyperscale and colocation sites in 2023) ^[11]. No cost comparison was found.

as of 2026-11-16

#### How it is used

Lifetime, use per year and utilisation, by variant

| Measure | Value | Unit | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|
| Product lifetime assumed in the life cycle assessment of a Dell PowerEdge R760 | 4 | years | General-purpose | World | 2025 | ^[1] |
| Server lifetime assumed in LBNL's model of the United States installed base, 2023 (4.4 years for 2000 to 2019) | 5.7 | years | General-purpose | United States of America | 2023 | LBNL modelling assumption for United States servers ^[11] |
| Years of use in a hyperscale data centre before a downstream user, as assumed in ITRenew's model | 3 | years | General-purpose | World | 2020 | ^[28] |
| Expected economic useful life of compute servers in ITRenew's model, including a downstream user | 9.2 | years | General-purpose | World | 2020 | ^[28] |
| Typical energy use of a Dell PowerEdge R740 (typical energy consumption) | 1760.3 | kWh per year | General-purpose | World | 2019 | ^[2] |
| Operational power of a dual-processor server set in LBNL's model for 2023 | 600 | W | General-purpose | United States of America | 2023 | LBNL model value ^[11] |
| Measured average power of an 8-H100 node during training (78% of rated power) | 7.9 | kW | AI accelerator | World | 2024 | ^[11] |

as of 2026-11-16

#### Prices

Unit prices by market or use, with year and source

| Market | Value | Unit | Year | Source |
|---|---|---|---|---|
| NVIDIA DGX H100 (eight GPUs), selling price | 270,000 | USD per system | 2023 | SemiAnalysis estimate ^[32] |
| NVIDIA DGX H100 cost of components, before vendor margin | 45,000 | USD per system | 2023 | Calculated sum of four cost lines, 26.6 + 8 + 4 + 6.4 thousand USD ^[33] |
| NVIDIA DGX-1 (eight Tesla P100 GPUs) at launch | 129,000 | USD per system | 2016 | ^[31] |

as of 2026-11-16

#### Sources

1. [Life Cycle Assessment of Dell Server PowerEdge R760 (report produced September 2025)](https://www.delltechnologies.com/asset/en-us/products/servers/briefs-summaries/poweredge-r760-life-cycle-assessment.pdf) Dell Technologies, 2025
2. [PowerEdge R740 product carbon footprint (report produced January 2019)](https://i.dell.com/sites/csdocuments/corpcomm_docs/en/carbon-footprint-poweredge-r740.pdf) Dell Technologies, 2019
3. [2024 United States Data Center Energy Usage Report (LBNL-2001637)](https://eta-publications.lbl.gov/sites/default/files/2024-12/us_data_center_energy_usage_report_lbnl-2001637.pdf) Lawrence Berkeley National Laboratory, 2024
4. [Strong Demand from CSPs and Sovereign Cloud to Drive Over 20% Growth in AI Server Shipments by 2026, Says TrendForce (30 October 2025)](https://www.trendforce.com/presscenter/news/20251030-12762.html) TrendForce, 2025
5. [Dell Technologies Delivers Fourth Quarter and Full-Year Fiscal 2026 Results](https://www.businesswire.com/news/home/20260226276981/en/Dell-Technologies-Delivers-Fourth-Quarter-and-Full-Year-Fiscal-2026-Results) Dell Technologies via Business Wire, 2026
6. [Data Center Impact Report: The Financial & Sustainability Case for Circularity (Fenn and Fesch; the document shows no date)](https://opencompute.org/documents/itrenew-the-case-for-circularity-data-center-impact-report-ocp-v11-pdf) ITRenew, hosted by the Open Compute Project
7. [Nvidia announces a supercomputer aimed at deep learning and AI](https://techcrunch.com/2016/04/05/nvidia-announces-a-supercomputer-aimed-at-deep-learning-and-ai) TechCrunch, 2016
8. [AI Server Cost Analysis – Memory Is The Biggest Loser (Patel and Wong, 29 May 2023)](https://newsletter.semianalysis.com/p/ai-server-cost-analysis-memory-is) SemiAnalysis, 2023
9. [AI Server System BOM & Rack Cost: Historical Data & Chart (newest print March 2026)](https://siliconanalysts.com/market-data/ai-server-system-bom) Silicon Analysts, 2026

## Other sections

- [Summary](https://www.materialinsights.org/products/p_data_centre_server/index.md)
- [Working](https://www.materialinsights.org/products/p_data_centre_server/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_data_centre_server/prod-bom/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_data_centre_server/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_data_centre_server/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_data_centre_server/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_data_centre_server/prod-interventions/index.md)