# Electrolyser: Footprint

Source page: https://www.materialinsights.org/products/p_electrolyser/prod-footprint/

#### Raw materials in one unit

Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions

| Variant | Material | Amount (kg) | Through | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|---|
| Alkaline | Steel | 10,200.5 | Transformer and power converter | 1.92 | 19,585 |
| Alkaline | Nickel | 2170.6 | – | – | – |
| Alkaline | Aluminium | 932.8 | Transformer and power converter | 14.8 | 13,805.4 |
| Alkaline | EPDM | 632.8 | – | – | – |
| Alkaline | Copper | 403 | – | 3.965 | 1597.9 |
| Alkaline | Polyethylene (LDPE, LLDPE) | 162.6 | – | – | – |
| Alkaline | Zirconium | 78.8 | – | – | – |
| Alkaline | Fluoropolymers (PTFE, PVDF) | 16.6 | – | – | – |
| PEM | Steel | 6800 | – | 1.92 | 13,056 |
| PEM | Titanium | 528 | – | – | – |
| PEM | Polypropylene | 300 | – | 1.548 | 464.4 |
| PEM | Aluminium | 127 | – | 14.8 | 1879.6 |
| PEM | Copper | 104.5 | – | 3.965 | 414.3 |
| PEM | Fluoropolymers (PTFE, PVDF) | 13.2 | – | – | – |
| PEM | Platinum | 0.075 | – | – | – |

Worked out from data

#### The site's estimate

Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors

| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| Alkaline | Making | World | 34,988 | 79% |
| Alkaline | Use | World | – | – |
| Alkaline | Making | India | 34,988 | 79% |
| Alkaline | Use | India | – | – |
| PEM | Making | World | 15,814 | 93% |
| PEM | Use | World | – | – |
| PEM | Making | India | 15,814 | 93% |
| PEM | Use | India | – | – |

Worked out from data

#### Emissions by stage

Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant

| Stage | Value | Unit | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|
| Making | 42,885 | kg CO2e per MW | PEM | Germany | 2025 | ^[12] Incomplete making stage: materials of one set of 150 stacks (4,075.5 t, assembly excluded) and 50 skids (213.0 t) for a 100 MW PEM project, divided by 100 (calculated); balance of plant, casing, assembly and replacement stacks are excluded, so no stage shares are given |

as of 2026-11-13

#### End of life

What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place

| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Recyclable or reusable material, share of the 5 MW alkaline system (study estimate, not a measured rate) | 77 | World (model plant) | 2025 | ^[8] |
| Stainless steel recycling rate used in the study | 88 | World (model plant) | 2025 | ^[8] |

as of 2026-11-13

#### Recovered as

The commodities and chemicals recovered at end of life, with recovery rates
 Recovered as

- [St Steel](https://www.materialinsights.org/commodities/steel/) 88% recovered · Recycling Stainless steel recycling rate (88%) assumed for the alkaline plant ^[8].
- [Ni Nickel](https://www.materialinsights.org/commodities/nickel/) Recycling No recovery rate is given; the study assumes 92% for nickel and finds that recycled and reused materials cut the plant's CO2e by about 50% against primary materials ^[8].
- [Pt Platinum](https://www.materialinsights.org/commodities/platinum/) Recycling JRC, citing a World Bank study of 2022, says recycling and re-use could meet around 40% of demand from 2030 onwards, in its discussion of iridium ^[11]; that is a share of demand, not a recovery rate.

as of 2026-11-13

#### End of life in India

Collection and recycling in India, including the informal sector

No source opened gives end-of-life data for electrolysers in India. For the 5 MW alkaline reference, 77% of the system's materials can be recycled or reused, and using recycled material cuts the plant's CO2e by about 50% against primary material ^[8]. Stacks are replaced after about 10 years in a 100 MW PEM project ^[12], so replaced stacks are an early source of scrap. JRC warns that iridium can become a critical material for electrolyser deployment in the EU ^[11].

as of 2026-11-13

#### Sources

1. [Reducing Environmental Impacts of Water Electrolysis Systems by Reuse and Recycling: Life Cycle Assessment of a 5 MW Alkaline Water Electrolysis Plant](https://mdpi.com/1996-1073/18/4/796) Energies 18(4), 796, MDPI (Annika C. Hoppe and Christine Minke), 2025, Table 2
2. [Supply chain analysis and material demand forecast in strategic technologies and sectors in the EU: A foresight study (JRC132889, EUR 31437 EN)](https://www.mineralinfo.fr/sites/default/files/documents/2024-10/JRC132889_01.pdf) Joint Research Centre, European Commission, 2023, Section 2.3 (electrolysers); copy hosted by mineralinfo.fr
3. [Deliverable 9.4, GHG emissions avoidance analysis report (pre-construction)](https://2.refhyne.eu/wp-content/uploads/2025/11/REFHYNE-2-D9.4-pre-construction-GHG-avoidance-report-final2.pdf) TECNALIA for the REFHYNE 2 project, 2025, Sections 5.1 to 5.3; dated March 2025

## Other sections

- [Summary](https://www.materialinsights.org/products/p_electrolyser/index.md)
- [Working](https://www.materialinsights.org/products/p_electrolyser/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_electrolyser/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_electrolyser/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_electrolyser/prod-supply/index.md)
- [Evolution](https://www.materialinsights.org/products/p_electrolyser/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_electrolyser/prod-interventions/index.md)