# EV charger: Interventions

Source page: https://www.materialinsights.org/products/p_ev_charger/prod-interventions/

#### Interventions

Changes that would cut emissions or material use, by lever and life stage, with effect per unit, readiness, adoption, evidence and who acts

| Lever | Life stage | Change | Effect per unit | Readiness | Adoption | Who acts | Source |
|---|---|---|---|---|---|---|---|
| Efficiency | Use | Use a silicon carbide MOSFET power stage rather than silicon or IGBT stages | Greatest efficiency across the load range; the paper gives no percentage ^[20]. The maker's guide claims peak efficiency of 96% or more ^[4]. | deployed | Share of chargers not found | Charger makers | ^[20]^[4] |
| Efficiency | Use | Cut standby power draw | Standby is 26% of the C6EU's declared 20-year emissions (calculated) and 28% of the C7's ^[2]^[3] | deployed (design choice) | Standby 289.08 kWh per year in the C6EU; the C7 draws 97 W by day and 150 W at night ^[2]^[3] | Charger makers | ^[2]^[3] |
| Business model | Use | Use each charger more, so its making emissions are spread over more kWh | No figure found; making is 69% of the C6EU's declared total (calculated) ^[2] | deployed | UK ultra-rapid chargers in use 12.8% of the time in Q4 2025 ^[10] | Charge point operators and cities | ^[2]^[10] |
| Design | Components design | Make chargers with easily separable, reusable parts | Keeps the 73.87 kg of copper and 12.91 kg of aluminium in a 120 kW unit recoverable; no saving in CO2e found ^[2]^[17] | proposed in an Indian circularity article | Not found | Charger makers | ^[17]^[2] |
| Circularity | End of life | Extend producer responsibility rules to charging infrastructure and recover copper, aluminium and rare earths | No figure found | proposed; India has no charger-specific rules ^[17] | None found | Government, producers and recyclers | ^[17] |

as of 2026-11-17

#### Sources

1. [Environmental Product Declaration: C6EU Charging Station (MR-EPDITALY0066, Beijing XCHARGE Technology Co.)](https://www.epditaly.it/wp-content/uploads/2016/12/EPDItaly-Beijing-XCHARGE-Technology-Co.pdf) EPDItaly, 2023
2. [Environmental Product Declaration: Smart DC Charger C7 (MR-EPDITALY0079, Beijing XCHARGE Technology Co.)](https://epditaly.it/wp-content/uploads/2024/01/MR-EPDITALY0079.pdf) EPDItaly, 2023
3. [Technical guide to 60kW DC fast chargers: engineering, grid integration, and TCO](https://www.midapower.com/news/technical-guide-to-60kw-dc-fast-chargers-engineering-grid-integration-and-tco/) Mida Power (charger maker), 2026
4. [Zapmap and Green Finance Institute report shows resilient demand as UK charging network matures](https://www.zapmap.com/news/gfi-utilisation-report-2026) Zapmap, 2026
5. [Closing the loop: EV charging infrastructure circularity in India](https://humansofev.info/?p=11460) Humans of EV (Pranay Theerdhala), 2025
6. [Cost and efficiency of Level-3 DC fast-charging power modules: a benchmark comparison](https://www.vincotech.com/fileadmin/user_upload/content_media/documents/pdf/support-documents/technical-papers/Vincotech_TP_2018-05_001_Cost-and-Efficiency-of-Level-3-DC-Fast-Charging-Power-Modules.pdf) Vincotech (Baran Ozbakir)

## Other sections

- [Summary](https://www.materialinsights.org/products/p_ev_charger/index.md)
- [Working](https://www.materialinsights.org/products/p_ev_charger/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_ev_charger/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_ev_charger/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_ev_charger/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_ev_charger/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_ev_charger/prod-evolution/index.md)
