# Insulated power cable: Interventions

Source page: https://www.materialinsights.org/products/p_insulated_power_cable/prod-interventions/

[Try this in What if](https://www.materialinsights.org/analyse/what-if/?p=p_insulated_power_cable) Switch on levers and see what changes in India by 2036.

#### Interventions

Changes that would cut emissions or material use, by lever and life stage, with effect per unit, readiness, adoption, evidence and who acts

| Lever | Life stage | Change | Effect per unit | Readiness | Adoption | Who acts | Source |
|---|---|---|---|---|---|---|---|
| Circularity | End of life | Recover conductor metal and polymers from retired cable | The APAR declaration credits 3.92 kg CO2e per m of cable for recycling, against 6.02 kg for making it, so about 65% of making emissions (calculated) | Deployed for metals; the credit is a declared scenario | India meets 38% of copper demand from secondary copper | Cable makers, scrap dealers, recyclers | ^[5]^[9] |
| Design | Components design | Raise conductor temperature and voltage so one cable carries more power | A 525 kV bipole carries up to 2.5 GW; NKT has qualified 90 C continuous conductor temperature, which raises capacity (the size of the gain is not given) | Qualified (2026) | Used in projects such as SuedLink, SuedOstLink and Viking Link | Cable makers, grid operators | ^[3]^[17] |
| Substitute | Components design | Choose an aluminium conductor in place of copper where cross-section can grow | No like-for-like figure: the aluminium reference (8.7/15 kV, about 4.7 t per km) and the copper reference (0.6/1 kV, about 6.4 t per km) differ in voltage | Deployed; copper holds 54% of the global power cable market | Aluminium and copper both used in 525 kV cables ^[3] | Designers, cable makers | ^[8]^[2]^[1]^[3] |
| Business model | Supply chain | Secure cable factory capacity early to shorten the wait | Procuring cables takes two to three years, and DC cables over five; the saving per km is not quantified | Deployed in the market | NKT's high-voltage backlog was EUR 10.2 billion at end 2025 | Grid operators, cable makers | ^[6]^[15] |

as of 2026-11-13

#### Sources

1. [Environmental product declaration: NYCWY 4x120 SM/70 (NEPD-4568-3821-EN)](https://epd-global.com/getfile.php/1340666-1686743576/EPDer/Byggevarer/NEPD-4568-3821_NYCWY-4x120-SM-70.pdf) NKT A/S (made by NKT s.r.o., Kladno), registered with The Norwegian EPD Foundation, 2023, material composition and GWP-total tables; issued 14 June 2023
2. [Power Cable 72282140 - RHZ1-OL 8.7/15 3X1X240KAL+H25 (EPDITALY1100)](https://www.epditaly.it/en/wp-content/uploads/2016/12/EPDItaly1100_Energy-cable-72282140-22-07-2025.pdf) Cabelte - Cabos Eléctricos, S.A., registered with EPDItaly, 2025, composition and climate change tables; declared unit one km of cable with a load of 1 A; issued 22 July 2025
3. [525 kV HVDC](https://www.prysmian.com/staticres/525-kV-HVDC/) Prysmian, indicative weights and cross-sections; the page shows no date
4. [Aerial Bunched Cable (3*70+1*54.6 SQMM), EPD (HUB-5185)](https://stepstage.apar.com/wp-content/uploads/2026/02/EPD_Cable_Aerial-Bunched-Cable-37054.6-SQMM.pdf) APAR Industries Limited, registered with EPD Hub, 2026, GWP-total table; published 29 January 2026
5. [Building the Future Transmission Grid: executive summary](https://www.iea.org/reports/building-the-future-transmission-grid/executive-summary) IEA, 2025
6. [Copper power cable underpins the energy transition](https://internationalcopper.org/wp-content/uploads/2022/03/Copper-power-cable-underpins-the-energy-transition.pdf) International Copper Association (research by SAI Industrial LLC), press release; no date shown on the page
7. [Copper's Key Role in Cables](https://copperindia.org/wp-content/uploads/2025/08/Coppers-Key-Role-in-Cables.pdf) International Copper Association India, 2025, August 2025, pages 49 to 52
8. [NKT A/S Annual Report 2025: 6% organic growth and record-high operational EBITDA](https://investors.nkt.com/financial-reports/nkt-as-annual-report-2025-6-organic-growth-and-record-high-operational-ebitda/) NKT, 2026, dated 25 February 2026
9. [NKT qualifies 525 kV HVDC subsea power cable system for operation at 90 °C](https://cyprusshippingnews.com/2026/09/09/nkt-qualifies-525-kv-hvdc-subsea-power-cable-system-for-operation-at-90-c/) Cyprus Shipping News, 2026

## Other sections

- [Summary](https://www.materialinsights.org/products/p_insulated_power_cable/index.md)
- [Working](https://www.materialinsights.org/products/p_insulated_power_cable/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_insulated_power_cable/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_insulated_power_cable/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_insulated_power_cable/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_insulated_power_cable/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_insulated_power_cable/prod-evolution/index.md)