#### Interventions

Changes that would cut emissions or material use, by lever and life stage, with effect per unit, readiness, adoption, evidence and who acts

| Lever | Life stage | Change | Effect per unit | Readiness | Adoption | Who acts | Source |
|---|---|---|---|---|---|---|---|
| Circularity | End of life | Recycle magnet scrap into new magnets | Magnets from anticipated large-scale recycling have over 80% lower impacts than primary ones in most impact categories ^[7] | Research and pilot: recycling of rare earth elements is below 1% today ^[21] | Below 1% | Recyclers, magnet makers, wind and car makers | ^[7]^[21] |
| Substitute | Components design | Use ferrite instead of NdFeB where the weaker field is acceptable | No rare earths, but ferrite has about a tenth of the energy product (38 against 410 kJ per m3), so more mass is needed for the same field; no per-kg emissions comparison was found in a source that opened ^[9] | Deployed in many small motors; a 100 kW ferrite motor prototype exists ^[9] | Widely used in small motors; no dated share found | Motor and device designers | ^[9] |
| Change route | Making | Make magnets on a cleaner grid | Electricity generation is 42.9% of the 23.5 kg CO2e per kg in the VALOMAG baseline, so a cleaner grid cuts the largest single contributor ^[6] | Deployed in principle; depends on the grid | Not found | Magnet makers, governments | ^[6] |
| Design | Components design | Use hybrid or geared generators in wind turbines to cut neodymium per MW | Neodymium falls from 180 kg per MW (direct drive) to 51 kg (hybrid) and 12 kg (geared, doubly fed) ^[4] | Deployed | A Vestas V236-15 MW offshore turbine still holds about 909 kg of magnets (calculated) ^[26] | Turbine makers | ^[4]^[26] |
| Business model | Supply chain | Build magnet capacity outside China | No emissions saving; cuts the supply risk of the 94% Chinese share ^[2]. India plans 6,000 t a year ^[18] | Announced: projects outside China add up to about 18 kt of rare earth content as of early 2026 ^[2] | Announced projects outside China are small against China's output | Governments, magnet makers | ^[2]^[18] |

as of 2026-11-13

#### Sources

1. [Rare Earth Elements: executive summary](https://iea.org/reports/rare-earth-elements/executive-summary) International Energy Agency, 2026
2. [Raw materials demand for wind and solar PV technologies in the transition towards a decarbonised energy system (Carrara et al., EUR 30095 EN), Table 4](https://opac.geologie.ac.at/ais312/dokumente/rms_for_wind_and_solar_published_v2.pdf) European Commission Joint Research Centre, 2020
3. [Upscale of Permanent Magnet Dismantling and Recycling, VALOMAG (19049): Life cycle assessment baseline, version 1 (Li and Sprecher, 17 March 2022)](https://valomag.tudelft.nl/wp-content/uploads/2022/06/LCA-baseline.pdf) Leiden University, 2022
4. [Ex-ante LCA of magnet recycling: progressing towards sustainable industrial-scale technology (van Nielen et al.)](https://scholarlypublications.universiteitleiden.nl/access/item%3A3762449/view) Journal of Cleaner Production, 2024
5. [Powering the green economy: the quest for magnets without rare earths (James McKenzie)](https://physicsworld.com/a/powering-the-green-economy-the-quest-for-magnets-without-rare-earths/) Physics World, 2023
6. [Cabinet approves Rs 7280 crore Rare Earth Permanent Magnets scheme to enhance self-reliance, promote REPM ecosystem](https://www.tribuneindia.com/news/business/cabinet-approves-rs-7280-crore-rare-earth-permanent-magnets-scheme-to-enhance-self-reliance-promote-repm-ecosystem) The Tribune, 2025
7. [Neodymium for the energy transition: Outlook to 2030 and key challenges (Materials Factsheet)](https://www.energy-transitions.org/wp-content/uploads/2023/07/ETC_Materials_Factsheet_Neodymium.pdf) Energy Transitions Commission
8. [Life Cycle Assessment of Electricity Production from an offshore V236-15 MW Wind Plant (April 2024)](https://vestas.com/content/dam/vestas-com/global/en/sustainability/environment/LCA%20of%20Electricity%20Production%20from%20an%20offshore%20V236-15MW.pdf) Vestas Wind Systems A/S, 2024

## Other sections

- [Summary](https://www.materialinsights.org/products/p_permanent_magnet/index.md)
- [Working](https://www.materialinsights.org/products/p_permanent_magnet/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_permanent_magnet/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_permanent_magnet/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_permanent_magnet/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_permanent_magnet/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_permanent_magnet/prod-evolution/index.md)