#### About these figures

Which unit, study and year the composition figures describe, and how they vary

Amounts per m3 are the US and Canada industry-average bill per tonne of structural precast (2016 to 2018 data) ^[1], multiplied by 2.4 tonnes per m3 (calculated). The listed inputs add to about 1,028 kg per tonne, so mass shares are of that total. Block shares follow a US 2022 EPD ^[4] and the prestressed row two single-plant sources. Fly ash, silica fume, slag and lightweight aggregates are not linked.

as of 2026-11-16

#### Components

The products inside one unit, with quantity, mass share and cost share
 Variant **Reinforced element**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [Steel reinforcing bar](https://www.materialinsights.org/products/p_steel_reinforcing_bar/) | Component | 0.045 | **1.8%** |
| Rebar is 18.7 kg per tonne in the US and Canada industry average, so about 0.045 tonne (45 kg) per m3 at 2.4 tonnes per m3 (calculated) ^[1]. Welded wire, anchors and strand are counted as steel in the materials, not here. Mass share is of the 1,028 kg of listed inputs per tonne (calculated). |  |  |  |

as of 2026-11-16

#### Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
 Variant 1 **Reinforced element**

| Material | Role | Amount in one unit | Share of the unit's mass | Share of cost |
|---|---|---|---|---|
| [Agg Sand & gravel](https://www.materialinsights.org/commodities/sand_gravel/) | Structural | 1091.8 kg | **44.2%** | 9% |
| Natural sand 298.3 kg and natural gravel 156.6 kg per tonne, times 2.4 (calculated) ^[1]. Cost share is the midpoint of 8 to 10% of operating cost for all aggregates and sand in India ^[22]. |  |  |  |  |
| [Stn Crushed stone](https://www.materialinsights.org/commodities/crushed_stone/) | Structural | 702.5 kg | **28.5%** | – |
| Crushed coarse aggregate 233.3 kg plus manufactured (crushed) sand 59.4 kg per tonne, times 2.4 (calculated) ^[1]. |  |  |  |  |
| [Cem Cement](https://www.materialinsights.org/commodities/cement/) | Structural | 382.1 kg | **15.5%** | 24% |
| Portland cement 152.2 kg plus Portland limestone cement 7.0 kg per tonne, times 2.4 (calculated) ^[1]. Fly ash, silica fume and slag cement add 19.0 kg per tonne (45.6 kg per m3), not linked as no node exists. Cost share is the 22 to 26% midpoint of operating cost for cement and binders in India ^[22]. |  |  |  |  |
| [H₂O Water](https://www.materialinsights.org/commodities/water/) | Functional | 142.6 kg | **5.8%** | – |
| Total batch water of 59.4 litres per tonne, taken as 1 kg a litre, times 2.4 (calculated) ^[1]. |  |  |  |  |
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | 58.1 kg | **2.4%** | 24% |
| Welded wire 5.7 kg, anchors 4.7 kg and strand 13.8 kg per tonne, times 2.4 (calculated) ^[1]; rebar is counted in the component above. Cost share covers all reinforcement steel and strand, 22 to 26% of operating cost in India ^[22]. The steel cost share therefore also covers the rebar component. |  |  |  |  |
| [Con Construction chemicals](https://www.materialinsights.org/chemicals/construction_chemicals/) | Functional | 5.4 litre | – | 5% |
| Admixtures and form-release agent total 2.23 litres per tonne (calculated sum of seven items), 5.4 litres per m3 (calculated) ^[1]. Cost share is the midpoint of 4 to 6% for admixtures and inserts in India ^[22]. |  |  |  |  |

 Variant 2 **Unreinforced block or paver**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [Cem Cement](https://www.materialinsights.org/commodities/cement/) | Structural | Not given | **7.8%** |
| Cement is 7.8% of the mass of a normal-weight US block (NW1) and 10.3% at the NW3 end ^[4]. A Tasmanian paver has 5 to 10% cement and 2 to 3% milled slag ^[5]. |  |  |  |
| [Stn Crushed stone](https://www.materialinsights.org/commodities/crushed_stone/) | Structural | Not given | **91.9%** |
| Crushed or natural aggregate is 91.9% of the mass of an NW1 block ^[4]; the source does not split crushed from natural. A paver uses over 50% quartz sand and 30 to 40% glass sand ^[5]. |  |  |  |

 Variant 3 **Prestressed element**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | 10 kgrange 9.21 to 10 kg | **0.4%** |
| Tendon of 10 kg per m3 in a Finnish hollow-core slab ^[9]; 9.21 kg per m3 of prestressing steel in a Polish prestressed element, which also holds 91.7 kg of structural steel and 78 kg of reinforcing steel ^[7]. Mass share calculated on 2.4 tonnes. |  |  |  |

as of 2026-11-16

#### Cost breakdown

The share of the unit's cost in each component or stage

| Part | Share of cost | Variant | Year | Source |
|---|---|---|---|---|
| Cement and binders (share of operating cost; 22 to 26%, midpoint) | 24% | – | 2026 | ^[22] |
| Reinforcement steel and strands (22 to 26%, midpoint) | 24% | – | 2026 | ^[22] |
| Aggregates and sand (8 to 10%, midpoint) | 9% | – | 2026 | ^[22] |
| Admixtures and inserts (4 to 6%, midpoint) | 5% | – | 2026 | ^[22] |
| Utilities: power, fuel and water (10 to 15%, midpoint) | 12.5% | – | 2026 | ^[22] |
| Labour (8 to 12%, midpoint) | 10% | – | 2026 | ^[22] |
| Transport and erection support (5 to 8%, midpoint) | 6.5% | – | 2026 | ^[22] |
| Concrete itself in a hollow-core slab (share of direct production cost; 40 to 50%, midpoint) | 45% | Prestressed element | – | ^[11] |

as of 2026-11-16. Operating-cost shares for an Indian plant from a market-research firm's cost model; midpoints calculated from its ranges, and they do not sum to exactly 100% [22]. Release agents (2 to 3%), moulds (2 to 4%) and overheads (2 to 4%) are left out.

#### How it is put together

The main steps from parts and materials to the finished unit

| Step | What happens | Technology | Source |
|---|---|---|---|
| Batch the concrete | Cement, sand, stone, water and admixtures are weighed and mixed at the plant | – | ^[1] |
| Prepare moulds and reinforcement | Steel moulds or casting beds are cleaned, oiled with release agent and fitted with bar, mesh or strand | Reinforced concrete | ^[1] |
| Stress the strand | For prestressed parts the strand is stretched tight across the bed before the concrete is poured | Prestressed concrete | ^[9] |
| Cast and compact | Concrete is poured, compacted and levelled; hollow-core machines extrude slabs with voids that save concrete | – | ^[10] |
| Cure | The part hardens in about 5 to 20 hours, depending on the mix and curing method | – | ^[11] |
| Strip, finish and store | The strand is released, the part is lifted from the mould, finished and stored | – | ^[25] |
| Deliver and erect | Trucks carry the part, about 95 km on average in the UK; cranes set it in place and the joints are made | – | ^[30] |

as of 2026-11-16

#### Technologies used to make it

The technologies used to make it, at which step
 Made with

- [PSC Prestressed concrete](https://www.materialinsights.org/technologies/prestressed_concrete/) Pre-tensioning strand on a casting bed before the pour Used for hollow-core slabs, girders and sleepers; the strand is 13.8 kg per tonne in the US and Canada average ^[1].
- [RCo Reinforced concrete](https://www.materialinsights.org/technologies/reinforced_concrete/) Placing bar or welded mesh in the mould Rebar and welded wire are 24.4 kg per tonne of the US and Canada average (calculated) ^[1].
- [PC Portland cement](https://www.materialinsights.org/technologies/portland_cement/) Binding the mix with Portland and Portland limestone cement Cement is 159.2 kg per tonne in the US and Canada average (calculated) ^[1].

as of 2026-11-16

#### Technologies inside it

The technologies inside the product, with how much of each per unit
 Embodies

- [RCo Reinforced concrete](https://www.materialinsights.org/technologies/reinforced_concrete/) Beams, panels, pipes and slabs are reinforced concrete cast in a factory ^[1].
- [PSC Prestressed concrete](https://www.materialinsights.org/technologies/prestressed_concrete/) Hollow-core slabs and similar parts carry pre-tensioned strand ^[9].

as of 2026-11-16

#### Sources

1. [Environmental Product Declaration: Structural Precast Concrete, industry-wide (ASTM declaration EPD-117)](https://www.astm.org/v3/assets/blt5eb0a2cb04534832/blta671a3467de55af5/697b2372d69bf2389a8a4a48/463.EPD_for_Structural_Precast_Concrete_Industry_Wide_EPD.pdf) ASTM International EPD programme, 2019
2. [Environmental Product Declaration for Concrete Masonry Units as manufactured by members of the Concrete Masonry & Hardscapes Association (ASTM declaration EPD-766)](https://www.astm.org/v3/assets/blt5eb0a2cb04534832/blt4559e6cca3c9394c/697b1fbe843e683ab92eaefb/1209.EPD_CMHA_v5.pdf) ASTM International EPD programme, 2024
3. [EPD: Sustainable Bricks, Blocks, Pavers & Freestone ECO Retaining Walls (Island Block & Paving, Tasmania)](https://globalgreentag.com/certificate/2812/240709_Island+Block+Paving_EPD_v8.pdf) Global GreenTag, 2024
4. [EPD-IES-0025691: Prefabricated reinforced concrete prestressed elements (GOLDBECK Prefab Elements, Poland)](https://www.environdec.com/library/epd25691) EPD International (Environdec library), 2025
5. [Average quantities of reinforcement in concrete](https://help.oneclicklca.com/en/articles/275888) One Click LCA, 2025
6. [Reducing concrete production's carbon footprint with precast solutions, towards net zero](https://www.elematic.com/concrete-issues/reducing-concrete-productions-carbon-footprint-with-precast-solutions-towards-net-zero/) Elematic, 2025
7. [The ABCs of concrete production](https://www.elematic.com/concrete-issues/the-abcs-of-concrete-production/) Elematic, 2025
8. [Precast concrete manufacturing plant setup in India](https://www.imarcgroup.com/insight/precast-concrete-manufacturing-plant-setup-cost-india) IMARC Group, 2026
9. [IS 15916:2010 Building design and erection using prefabricated concrete, code of practice](https://law.resource.org/pub/in/bis/S03/is.15916.2011.pdf) Bureau of Indian Standards (copy on law.resource.org), 2011
10. [Concrete embodied carbon footprint calculator](https://circularecology.com/?p=1933) Circular Ecology

## Other sections

- [Summary](https://www.materialinsights.org/products/p_precast_concrete_products/index.md)
- [Working](https://www.materialinsights.org/products/p_precast_concrete_products/prod-working/index.md)
- [Use case](https://www.materialinsights.org/products/p_precast_concrete_products/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_precast_concrete_products/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_precast_concrete_products/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_precast_concrete_products/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_precast_concrete_products/prod-interventions/index.md)