# Railway locomotive and coach: Bill of materials

Source page: https://www.materialinsights.org/products/p_railway_rolling_stock/prod-bom/

#### About these figures

Which unit, study and year the composition figures describe, and how they vary

The bill is for an Indian WAP-7 of 123 t ^[1], with equipment masses from RDSO's 2007 drive electrics specification ^[3]. Alstom's Prima II (88 t) gives broad shares: metals 88.24%, polymers and elastomers 4.60%, fluids 2.78%, battery 1.42% and electrical and electronic equipment 1.91% ^[12]. No steel, copper or aluminium split was found in the Alstom, Siemens or Bombardier declarations opened. Bogies and wheelsets, pantographs and coach bodies are not yet nodes.

as of 2026-11-16

#### Components

The products inside one unit, with quantity, mass share and cost share
 Variant **Electric locomotive**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [Electric motor](https://www.materialinsights.org/products/p_electric_motor/) | Component | 6 | **10.2%** |
| Six 3-phase traction motors of 2,100 kg each, 12,600 kg ^[1]^[3]; share calculated against the WAP-7's 123 t. |  |  |  |
| [Transformer and power converter](https://www.materialinsights.org/products/p_transformer_and_power_converter/) | Component | 1 | **13.2%** |
| Main transformer 9,626 kg and two traction converters of 3,330 kg each, 16,286 kg, share calculated against 123 t; the three auxiliary converters add 1,420 kg ^[3]. The weights are those given in RDSO's 2007 specification for WAG9 and WAP7 drive electrics. |  |  |  |

as of 2026-11-16

#### Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
 Variant 1 **Electric locomotive**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | Not given | – |
| Body shell, fabricated bogies, wheels and axles are steel ^[1]. Alstom's Prima II declaration gives metals as 88.24% of its 88 t, about 77.7 t (calculated), without splitting steel, copper and aluminium ^[12]; the motor, transformer and converter nodes hold part of that mass. |  |  |  |
| [Cu Copper](https://www.materialinsights.org/commodities/copper/) | Functional | Not given | – |
| Windings and cables sit mostly inside the motor and transformer nodes; no opened source gives the copper outside them. |  |  |  |

 Variant 2 **Passenger coach**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | Not given | – |
| LHB coaches are made of stainless steel and their interiors of aluminium ^[7]; no mass split found. |  |  |  |

as of 2026-11-16

#### Cost breakdown

The share of the unit's cost in each component or stage

| Part | Share of cost | Variant | Year | Source |
|---|---|---|---|---|
| Materials (WAP-7 built at Patiala) | 92.2% | Electric locomotive | 2023 | ^[27] |
| Labour | 3.4% | Electric locomotive | 2023 | ^[27] |
| Overheads (factory, administrative and other) | 4.4% | Electric locomotive | 2023 | ^[27] |

as of 2026-11-16. Calculated from Indian Railways' 2022-23 unit cost of a WAP-7 at Patiala Locomotive Works: INR 1,086.64 lakh materials, 39.53 lakh labour and 52.34 lakh overheads, of 1,178.51 lakh before proforma charges [27]. Materials include bought-in equipment such as converters and motors; no split by part was found.

#### How it is put together

The main steps from parts and materials to the finished unit

| Step | What happens | Technology | Source |
|---|---|---|---|
| Fabricate the bogies | Three-axle bogies are welded up as fabricated frames of the Flexicoil Mark IV type ^[1]. | – | ^[1] |
| Build the body shell | A steel body shell is welded and painted to carry the roof equipment and cabs. | – | – |
| Fit the drive electrics | The main transformer, two traction converters, auxiliary converters and six traction motors are installed ^[3]. | Transformers and power electronics | ^[3] |
| Fit the brakes | Air brakes are fitted, with motor braking provided by the drive electrics ^[1]. | Railway air brake | ^[1] |
| Test and deliver | The finished locomotive is tested, then delivered to the railway. | – | – |

as of 2026-11-16

#### Technologies inside it

The technologies inside the product, with how much of each per unit
 Embodies 4

- [Mot Electric motors and drives](https://www.materialinsights.org/technologies/e_motors/) 6 traction motors per WAP-7 Three-phase squirrel-cage induction motors ^[1].
- [PE Transformers and power electronics](https://www.materialinsights.org/technologies/e_power_electronics/) Main transformer and IGBT traction converters ^[3].
- [AB Railway air brake](https://www.materialinsights.org/technologies/railway_air_brake/) The WAP-7 has air brakes for locomotive and train ^[1]; LHB coaches have pneumatic disc brakes ^[7].
- [Rgn Regenerative braking and motion recovery](https://www.materialinsights.org/technologies/e_regen_braking/) The locomotive brake is air and regenerative ^[1].

as of 2026-11-16

#### Sources

1. [Indian locomotive class WAP-7](https://en.wikipedia.org/wiki/Indian_locomotive_class_WAP-7) Wikipedia, 2026
2. [IGBT based 3-phase drive electrics for WAG9 and WAP7 locomotives (technical specification, Rev. 0, January 2007)](https://rdso.indianrailways.gov.in/uploads/files/48.pdf) Research, Designs & Standards Organisation (Indian Railways), 2007
3. [LHB coach](https://en.wikipedia.org/wiki/LHB_coach) Wikipedia, 2026
4. [Environmental Product Declaration: Prima II](https://www.alstom.com/sites/alstom.com/files/2018/07/12/prima_ii_-_environmental_product_declaration.pdf) Alstom
5. [Compendium of unit cost of various products manufactured in production units 2022-2023](https://indianrailways.gov.in/railwayboard/uploads/directorate/finance/2023/Compendium%20of%20Unit%20Cost%20of%20Rolling%20Stock%20for%20%2022-23%20for%20ZRs.pdf) Railway Board, Cost Accounts Branch, Finance Commercial Directorate (Indian Railways), 2023

## Other sections

- [Summary](https://www.materialinsights.org/products/p_railway_rolling_stock/index.md)
- [Working](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-working/index.md)
- [Use case](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_railway_rolling_stock/prod-interventions/index.md)
