# Smart electricity meter: Evolution

Source page: https://www.materialinsights.org/products/p_smart_electricity_meter/prod-evolution/

#### Timeline

The milestones of the product, each with a source

| Year | Event |
|---|---|
| 2001 | Enel starts what Eurelectric calls the world's largest smart meter deployment, in Italy ^[29]. |
| 2006 | The Telegestore meters, installed from 2001 for more than 32 million customers, are in place by 2006 ^[30]. |
| 2015 | IS 16444 (Part 1):2015 becomes India's specification for class 1 and 2 direct-connected smart meters ^[6]^[34]. |
| 2020 | Electricity (Rights of Consumers) Rules, 2020: new connections only with smart prepayment or prepayment meters ^[9]. |
| 2021 | The Ministry of Power launches RDSS in July, with a target of 250 million prepaid smart consumer meters by March 2026 ^[10]. |
| 2022 | The Power Secretary says a world chip shortage has slowed the smart metering rollout ^[14]. |
| 2023 | About 6 million smart meters are installed by March 2023 ^[7]; DPIIT notifies the Smart Meters (Quality Control) Order on 14 July ^[33]. |
| 2026 | India has 7.24 crore smart meters of all kinds installed by 30 June 2026 ^[8]. |

as of 2026-11-17

#### Recipe changes

How what it is made of changed over time, and what drove each change

| Change | From | To | Driver | Source |
|---|---|---|---|---|
| Plastic and metal per meter | Earlier Landis+Gyr E360 single-phase design | Plastic cut by 21% and metal by 10% by weight in the redesigned 1-phase E360 ^[19] | Plastic is a significant contributor to product-level Scope 3 emissions ^[18] | ^[19]^[18] |
| Case plastic | Virgin polycarbonate | Recycled polycarbonate: 26.5% of the packed weight of the Gemis 2 and 55.0% of the Gesis 1.5 ^[1]^[2] | Not stated in the declarations | ^[1]^[2] |
| Type of meter | Plain electronic single-phase meter, Rs 602 ^[12] | Smart meter, Rs 3,252 ^[12] | Remote reading and the rule for smart prepayment meters on new connections ^[9] | ^[12]^[9] |

as of 2026-11-17

#### What could improve it next

Directions for improvement, today's value and the limit

| Direction | Metric | Today | Limit | Unit | Source |
|---|---|---|---|---|---|
| Lower own power draw | Typical power of an LTE single-phase meter while communicating (the most efficient technology could cut system-wide use to one third, 2013) | 1.7 | – | W | ^[35]^[4] |
| Less plastic per meter | Plastic share of a meter's mass (around half) | 50 | – | per cent | ^[18] |
| More recycled polycarbonate | Recycled polycarbonate, share of packed weight (Gemis 2 today; the Gesis 1.5 already reaches 55.0) | 26.5 | 55 | per cent | ^[1]^[2] |
| Longer meter life | Useful life: Indian tender against the declarations' reference life | 10 | 20 | years | ^[5]^[1] |

as of 2026-11-17

#### Sources

1. [Environmental Product Declaration: Gemis 2 (mono-phase smart meter)](https://epditaly.it/wp-content/uploads/2016/12/2024_12_11_EPD_REPORT_GEMIS2.pdf) EPDItaly (EPD owner Bitron Electronic China Company Ltd; meter made by Bitron Electronics for Gridspertise), 2024
2. [Environmental Product Declaration: Smart Meter multi-phase Gesis 1.5](https://epditaly.it/wp-content/uploads/2016/12/2024_06_28-EPDItaly_EPD_REPORT_GESIS-v2.pdf) EPDItaly (EPD owner Bitron Poland; made for Gridspertise), 2024
3. [Is smart efficient? Assessing energy consumption of network products with the example of smart meters (workshop slides, A. Diaz)](https://iea.blob.core.windows.net/assets/imports/events/258/20AdrianaDiazIEAWS_Smart_Metering_Consumption_A_Diaz_05_03_2013.pdf) IEA Networked Standby Policy Framework Workshop (ECODESIGN company), 2013
4. [Phase 5-30A meter GTP for TP Odisha Discoms (single-phase smart meter specification)](https://www.tpcentralodisha.com/Editor_UploadedDocuments/Content/Single_phase_SMART_Meters.pdf) TP Central Odisha Distribution Ltd
5. [STI for implementation of IS 16444 (Part 1):2015 (scheme of testing and inspection)](https://services.bis.gov.in/tmp/IS_16444_24012018.pdf) Bureau of Indian Standards, 2018
6. [Smart Metering Progress: Growing role in managing the complex electricity system (Atul Bali)](https://powerline.net.in/2026/07/10/smart-metering-progress-growing-role-in-managing-the-complex-electricity-system/) Power Line magazine, 2026
7. [Rajya Sabha Unstarred Question No. 943: Delay in smart meter installation (answer by Ministry of Power, 27 July 2026)](https://www.powermin.gov.in/static/uploads/2026/07/f59419a881df9acc24bed8753f6d9fda.pdf) Ministry of Power, Government of India, 2026
8. [Lok Sabha replies of 2 April 2026 (starred question 541, unstarred question 6243)](https://powermin.gov.in/sites/default/files/uploads/LS02042026_Eng.pdf) Ministry of Power, India, 2026
9. [Smart Metering in India: A work in progress (S. Kulkarni, A. Apte, K. Sehgal)](https://energy.prayaspune.org/images/pdf/Smart_Metering_in_India-A_work_in_progress.pdf) Prayas (Energy Group), 2025
10. [Average Cost of Different Types of Meters (table excluding GST; file name dated Feb 20)](https://tatapower-ddl.com/Editor_UploadedDocuments/Content/Average_Cost_of_Different_Types_of_Meters_Feb_20.pdf) Tata Power Delhi Distribution
11. [Electronic chip supply crunch affecting govt's smart metering programme: Power Secretary](https://psuwatch.com/electronic-chip-supply-crunch-affecting-government-smart-metering-programme-power-secretary) PSU Watch, 2022
12. [Planet (sustainability pages)](https://www.landisgyr.com/us/en/home/about-landis-gyr/sustainability/sustainable-climate-and-environment) Landis+Gyr
13. [Smarter design saves tons of materials](https://eu.landisgyr.com/blog/smarter-design-saves-tons-of-materials) Landis+Gyr
14. [Smart Meter vision](https://cdn.eurelectric.org/stories/electrification/smart-meter-vision) Eurelectric
15. [Enel: Open Meter Reality](https://climateaction.org/news/enel-open-meter-reality) ClimateAction.org
16. [DPIIT notifies Quality Control Orders for 'Smart Meters' and 'Welding Rods and Electrodes'](https://pib.gov.in/PressReleasePage.aspx?PRID=1944809) Press Information Bureau, Ministry of Commerce and Industry, 2023
17. [IS 16444 (Part 1):2015 a.c. Static Direct Connected Watthour Smart Meter Class 1 and 2: Specification (full text)](https://archive.org/stream/gov.in.is.16444.1.2015/IS16444:Part1:2015_djvu.txt) Bureau of Indian Standards (copy on the Internet Archive), 2015
18. [E360 Series 1 LTE 1-phase: Technical data (D000065103 b)](https://taranelektronik.com/wp-content/uploads/2024/01/E360-LTE-1-phase-Technical-data.pdf) Landis+Gyr (copy hosted by Taran Elektronik), 2019

## Other sections

- [Summary](https://www.materialinsights.org/products/p_smart_electricity_meter/index.md)
- [Working](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-footprint/index.md)
- [Interventions](https://www.materialinsights.org/products/p_smart_electricity_meter/prod-interventions/index.md)
