# Wind turbine blade: Bill of materials

Source page: https://www.materialinsights.org/products/p_wind_turbine_blade/prod-bom/

#### About these figures

Which unit, study and year the composition figures describe, and how they vary

Per blade. The Glass fibre and Carbon spar cap variants are reference blades of a 2024 Sandia and NREL recycling study (Table 2) ^[5]; the Offshore variant is the 117 m baseline of an ORE Catapult design study (Table 4.6) ^[4]. Glass fibre (new product p_glass_fibre) is the largest material: 58.7%, 46.9% and about 43.6% of mass. The Offshore foam core (11.0%) and root connection (6.4%) are not linked. Totals are indicative.

as of 2026-11-15

#### Components

The products inside one unit, with quantity, mass share and cost share
 Variant 1 **Carbon spar cap (62.2 m, 13.3 t reference)**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [Carbon fibre and composite parts](https://www.materialinsights.org/products/p_carbon_fibre_and_composite_parts/) | Component | 1198 kg | **9%** |
| Carbon fibre in the spar caps of the reference blade, 1,198 kg ^[5]; fibre only, since the spar cap resin is counted in the epoxy row. Share calculated against 13,273 kg. |  |  |  |

 Variant 2 **Offshore (117 m IEA 15 MW baseline)**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [Carbon fibre and composite parts](https://www.materialinsights.org/products/p_carbon_fibre_and_composite_parts/) | Component | 7814.3 kg | **11.2%** |
| Carbon fibre in the unidirectional spar caps of the 117 m baseline, 7,814.3 kg (the fibre column of the Carbon UD row of Table 4.6) ^[4]; fibre only, as for the Carbon spar cap variant, since the spar cap resin (2,890.2 kg) is counted in the epoxy row. Share calculated against 69,541.8 kg. |  |  |  |

as of 2026-11-15

#### Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
 Variant 1 **Glass fibre (48.7 m, 9.0 t reference)**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [EPX Epoxy resins](https://www.materialinsights.org/chemicals/epoxy/) | Structural | 2401 kg | **26.7%** |
| Thermoset epoxy of the glass reference blade ^[5]; share calculated. |  |  |  |
| [Adh Adhesives and sealants](https://www.materialinsights.org/chemicals/adhesives/) | Functional | 450 kg | **5%** |
| Structural adhesive that bonds the shells ^[5]; share calculated. |  |  |  |
| [Tm Timber](https://www.materialinsights.org/commodities/lumber/) | Structural | 416 kg | **4.6%** |
| Balsa core ^[5]; share calculated. Balsa is a wood, entered as timber. |  |  |  |
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | 270 kg | **3%** |
| Steel in the blade; the study does not say what it is used for (root fittings are the usual use) ^[5]; share calculated. |  |  |  |
| [Pnt Paints and coatings](https://www.materialinsights.org/chemicals/paints_coatings/) | Functional | 180 kg | **2%** |
| Gelcoat, the outer surface coat ^[5]; share calculated. |  |  |  |

 Variant 2 **Carbon spar cap (62.2 m, 13.3 t reference)**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [EPX Epoxy resins](https://www.materialinsights.org/chemicals/epoxy/) | Structural | 3685 kg | **27.8%** |
| Thermoset epoxy of the carbon spar cap reference blade, including the spar cap resin ^[5]; share calculated. |  |  |  |
| [Tm Timber](https://www.materialinsights.org/commodities/lumber/) | Structural | 839 kg | **6.3%** |
| Balsa core ^[5]; share calculated. |  |  |  |
| [Adh Adhesives and sealants](https://www.materialinsights.org/chemicals/adhesives/) | Functional | 664 kg | **5%** |
| Structural adhesive ^[5]; share calculated. |  |  |  |
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | 398 kg | **3%** |
| Steel; use not stated ^[5]; share calculated. |  |  |  |
| [Pnt Paints and coatings](https://www.materialinsights.org/chemicals/paints_coatings/) | Functional | 265 kg | **2%** |
| Gelcoat ^[5]; share calculated. |  |  |  |

 Variant 3 **Offshore (117 m IEA 15 MW baseline)**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [EPX Epoxy resins](https://www.materialinsights.org/chemicals/epoxy/) | Structural | 15,264 kg | **21.9%** |
| Resin of the 117 m baseline, calculated as the resin column of the five glass rows and the carbon spar cap row of Table 4.6 (12,373.8 kg plus 2,890.2 kg) ^[4]. The table's resin total of 19,353.4 kg also includes the adhesive and gelcoat, which have their own rows here. The table does not name the resin; epoxy, the resin Vestas uses ^[1], is assumed. |  |  |  |
| [Adh Adhesives and sealants](https://www.materialinsights.org/chemicals/adhesives/) | Functional | 3311.5 kg | **4.8%** |
| Structural adhesive, Table 4.6 ^[4]; share calculated. |  |  |  |
| [Pnt Paints and coatings](https://www.materialinsights.org/chemicals/paints_coatings/) | Functional | 777.9 kg | **1.1%** |
| Gelcoat of the shell, Table 4.6 ^[4]; share calculated. |  |  |  |

Indicative · as of 2026-11-15. Glass fibre, the largest material of every variant, is not yet a node, so it has no row: 5,283 kg or 58.7% (Glass fibre), 6,224 kg or 46.9% (Carbon spar cap) [5] and about 30,295 kg or 43.6% (Offshore, calculated from the fibre column of the five glass rows of Table 4.6) [4]. The Offshore blade also holds 7,646.7 kg (11.0%) of medium density foam core, type not stated, and a 4,432.6 kg (6.4%) root connection whose material is not stated [4]; neither is linked. Shares are calculated.

#### Cost breakdown

The share of the unit's cost in each component or stage

| Part | Share of cost | Year | Source |
|---|---|---|---|
| Blades as a share of a wind turbine's cost (range 15 to 26%, a set of three blades) | 20% | 2014 | ^[19] |
| Materials as a share of the cost of a US-made blade | 44% | 2014 | ^[19] |
| Labour and burden as a share of the cost of a US-made blade | 27% | 2014 | ^[19] |

as of 2026-11-15. IRENA's 2016 brief puts blades and tower together at nearly half of a turbine's cost [37].

#### How it is put together

The main steps from parts and materials to the finished unit

| Step | What happens | Technology | Source |
|---|---|---|---|
| Lay up fibre and cores | Dry glass (and carbon) fabric and balsa or foam cores are placed in the two shell moulds | – | ^[4] |
| Infuse resin | The mould is sealed and epoxy is drawn in under vacuum (vacuum assisted resin transfer moulding, the most common method) | – | ^[4] |
| Cure | The resin is cured with heat in the mould until it hardens; Siemens made its 75 m blade in one piece in a closed mould | – | ^[28] |
| Make spar caps and webs | Unidirectional strips of glass or carbon carry the bending load; webs join the two shells | Carbon fibre composites | ^[4] |
| Bond | Adhesive is applied to the lower shell, the webs are fitted and the upper shell is lowered on; Vestas uses polyurethane glue | – | ^[4]^[1] |
| Finish | The bonded blade is ground and polished to the right finish | – | ^[1] |

as of 2026-11-15

#### Technologies used to make it

The technologies used to make it, at which step
 Made with

- [CFR Carbon fibre composites](https://www.materialinsights.org/technologies/carbon_fibre_composites/) Laying up and curing carbon fibre spar caps Carbon fibre is used in the spar caps of large blades by Vestas and Siemens Gamesa ^[4]; no share of blades is given.

as of 2026-11-15

#### Technologies inside it

The technologies inside the product, with how much of each per unit
 Embodies

- [CFR Carbon fibre composites](https://www.materialinsights.org/technologies/carbon_fibre_composites/) 1198 kg Carbon spar cap (62.2 m, 13.3 t reference) Carbon fibre in the spar caps of the reference blade ^[5].

as of 2026-11-15

#### Sources

1. [Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025)](https://vestas.com/content/dam/vestas-com/global/en/sustainability/environment/Life%20Cycle%20Assessment%20of%20electricity%20production%20from%20an%20onshore%20V163-4.5MW%20wind%20plant.pdf.coredownload.inline.pdf) Vestas Wind Systems A/S, 2025
2. [WP4 D1.1 Wind Turbine Blades Design and Manufacturing: Current State-of-the-Art Literature Review (CFAR-OC-020-31032022)](https://cms.ore.catapult.org.uk/wp-content/uploads/2023/01/CFAR-OC-020-31032022-Wind-Turbine-Blades-Design-and-Manufacturing-Literature-ReviewFinal.pdf) Offshore Renewable Energy Catapult (Cornwall Flow Accelerator), 2022
3. [Environmental and Economic Assessment of Wind Turbine Blade Recycling Approaches](https://pmc.ncbi.nlm.nih.gov/articles/PMC11770760/) ACS Sustainable Resource Management (Sandia National Laboratories and NREL authors), via PubMed Central, 2024
4. [U.S. Wind Energy Manufacturing and Supply Chain: A Competitiveness Analysis](https://www.energy.gov/eere/wind/articles/us-wind-energy-manufacturing-supply-chain-competitiveness-analysis) U.S. Department of Energy, 2014
5. [Feature on the Siemens B75 Quantum 75 m blade, July/August 2012 issue (page shows no title)](https://www.reinforcedplastics.com/content/features/siemens-unveils-75-m-wind-turbine-blade) Reinforced Plastics, 2012

## Other sections

- [Summary](https://www.materialinsights.org/products/p_wind_turbine_blade/index.md)
- [Working](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-working/index.md)
- [Use case](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_wind_turbine_blade/prod-interventions/index.md)