# Wind turbine generating set: Evolution

Source page: https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-evolution/

#### Timeline

The milestones of the product, each with a source

| Year | Event |
|---|---|
| 1904 | Danish rural power stations start to use la Cour wind turbines: 32 of the 95 set up in 1904 to 1908 have one ^[33]. |
| 1920 | American farmers begin a 15-year wind charger boom: between 1920 and 1935 they buy a million small wind generators ^[32]. |
| 1979 | Vestas sells and installs its first turbine, 30 kW with a 10 metre rotor ^[11]. |
| 1995 | Tunoe Knob in Denmark, one of the first offshore wind farms ever built, is equipped with 500 kW turbines ^[12]. |
| 1997 | The 1.65 MW Vestas V66 is the world's largest commercial wind turbine, 55 times the first Vestas turbine ^[12]. |
| 2021 | Siemens Gamesa launches a fully recyclable blade in September, with first use planned at the Kaskasi offshore wind farm ^[23]. |
| 2024 | New turbines average almost 5.5 MW, onshore above 5 MW and offshore 9.8 MW ^[7]. |
| 2025 | A 26 MW offshore turbine with a 310 m rotor is installed in China, a maker's claim; the first of 64 Vestas V236-15 MW turbines goes up at He Dreiht ^[13]. |
| 2025 | India's ALMM (Wind) takes effect on 31 July, requiring approved domestic components ^[19]. |

as of 2026-11-13

#### Lineage

The products and technologies it evolved from and into
 Evolved from

- [WSm Small, airborne and traditional wind](https://www.materialinsights.org/technologies/e_small_wind/) Vestas's first turbine of 1979 was 30 kW with a 10 metre rotor ^[11].

as of 2026-11-13

#### Recipe changes

How what it is made of changed over time, and what drove each change

| Change | From | To | Driver | Source |
|---|---|---|---|---|
| Rated power of the leading Vestas model | 30 kW (1979) | 1.65 MW (V66, 1997); 4.5 MW onshore (V163, 2025); 15 MW offshore (V236) | More energy per site; not explained in the sources | ^[11]^[12]^[1]^[2] |
| Steel and iron share of turbine mass | 86% (V90-2.0 MW, 2018 brochure) | 84.3% (V163-4.5 MW, 2025); 82.9% (V236-15 MW, 2024) | Not stated; larger rotors carry more composite: 6.6% (V90), 7.0% (V163) and 8.9% (V236, ceramic and glass in Table 6, calculated) | ^[3]^[1]^[2] |
| Neodymium in the generator | 180 kg per MW (direct-drive permanent magnet) | 51 kg per MW (hybrid permanent magnet) and 12 kg per MW (geared, doubly fed); no magnets in the V163-4.5 MW | Cuts magnet use; the JRC does not give the reason | ^[4]^[1] |
| Blade end of life | Landfill, 95% of blades assumed in the SG 14-222 EPD | Recyclable resin blade (2021) that dissolves in a mild acid bath | Landfill bans and industry pledge to recycle 100% of blades | ^[15]^[23]^[21] |

as of 2026-11-13

#### What could improve it next

Directions for improvement, today's value and the limit

| Direction | Metric | Today | Limit | Unit | Source |
|---|---|---|---|---|---|
| Larger single units | Largest turbine installed | 26 (offshore, a maker's claim); 15 is the mainstream offshore model | Not found in sources | MW | ^[13] |
| Higher capacity factor offshore | Global weighted-average capacity factor of offshore wind | 42 | Not found in sources; Betz caps the rotor at 59.26% of the wind's power | % | ^[9]^[26] |
| More of the turbine recycled | Recyclability of the designed turbine (V163-4.5 MW) | 98.5 as built; 85.3 to 94.6 after treatment | 100 | % of mass | ^[1] |
| Less rare earth per MW | Neodymium in the generator | 180 (direct drive) to 12 (geared, doubly fed); none in the V163-4.5 MW | 0 | kg per MW | ^[4]^[1] |

as of 2026-11-13

#### Sources

1. [Life Cycle Assessment of electricity production from an onshore V163-4.5 MW wind plant (version 1.2, 15 January 2025)](https://vestas.com/content/dam/vestas-com/global/en/sustainability/environment/Life%20Cycle%20Assessment%20of%20electricity%20production%20from%20an%20onshore%20V163-4.5MW%20wind%20plant.pdf.coredownload.inline.pdf) Vestas Wind Systems A/S, 2025
2. [Life Cycle Assessment of Electricity Production from an offshore V236-15 MW Wind Plant (April 2024)](https://vestas.com/content/dam/vestas-com/global/en/sustainability/environment/LCA%20of%20Electricity%20Production%20from%20an%20offshore%20V236-15MW.pdf) Vestas Wind Systems A/S, 2024
3. [Material Use: Turbines (Vestas brochure, 02/2018)](https://ie.rwe.com/-/media/RWE/RWE-Ireland/downloads/fahy-beg/useful-documents/vestas-material-use-brochure.pdf) Vestas Wind Systems A/S (copy hosted by RWE Ireland), 2018
4. [Raw materials demand for wind and solar PV technologies in the transition towards a decarbonised energy system (Carrara et al., EUR 30095 EN), Table 4](https://opac.geologie.ac.at/ais312/dokumente/rms_for_wind_and_solar_published_v2.pdf) European Commission Joint Research Centre, 2020
5. [Wind Turbine Suppliers deliver new record volume](https://www.gwec.net/news/wind-turbine-suppliers-deliver-new-record-volume-despite-difficult-year-full-of-diverse-challenges) Global Wind Energy Council, 2025
6. [Renewable Power Generation Costs in 2024: Summary](https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf) IRENA, 2025
7. [From 1971-1986 (Vestas history)](https://vestas.com/en/about/this-is-vestas/history/from-1971-1986) Vestas Wind Systems A/S, 2026
8. [From 1987-1998 (Vestas history)](https://www.vestas.com/en/about/this-is-vestas/history/from-1987-1998) Vestas Wind Systems A/S, 2026
9. [Offshore Wind Turbines in 2025: China Continues Leading in Single-Unit Capacity, Vestas's 15 MW Turbine Installed at Offshore Wind Farms](https://www.offshorewind.biz/2026/01/01/offshore-wind-turbines-in-2025-china-continues-leading-in-single-unit-capacity-vestass-15-mw-turbine-installed-at-offshore-wind-farms/) offshoreWIND.biz, 2026
10. [Electricity from a European offshore wind farm using SG 14-222 wind turbines (EPD S-P-09791)](https://api.environdec.com/api/v1/EPDLibrary/Files/c84b3d1c-6bc9-4e74-da39-08dbb377d685/Data) EPD International AB (declaration by Siemens Gamesa Renewable Energy), 2023
11. [Domestic push: India mandates local supply chains and data centres for wind turbines](https://www.downtoearth.org.in/renewable-energy/domestic-push-india-mandates-local-supply-chains-and-data-centres-for-wind-turbines) Down To Earth, 2025
12. [Wind industry calls for Europe-wide ban on landfilling turbine blades](https://windeurope.org/?p=29813) WindEurope, 2021
13. [Siemens Gamesa Launches World's First Fully Recyclable Wind Turbine Blade](https://www.powermag.com/siemens-gamesa-launches-worlds-first-fully-recyclable-wind-turbine-blade/) POWER Magazine, 2021
14. [Outer space: Blowin' in the wind (John D. Barrow)](https://plus.maths.org/content/outer-space-blowin-wind-0) Plus Maths, 2007
15. [Flashbacks: The First Wind-Power Boom](https://www.cooperative.com/remagazine/articles/Pages/Flashbacks-The-First-Wind-Power-Boom.aspx) NRECA, RE Magazine (cooperative.com), 2018
16. [Vindmøllens historie: Sådan tæmmede danskerne vindens energi (Kristian Hvidtfelt Nielsen)](https://videnskab.dk/teknologi-innovation/vindmoellens-historie-saadan-taemmede-danskerne-vindens-energi) Videnskab.dk, 2018

## Other sections

- [Summary](https://www.materialinsights.org/products/p_wind_turbine_generating_set/index.md)
- [Working](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-working/index.md)
- [Bill of materials](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-bom/index.md)
- [Use case](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-footprint/index.md)
- [Interventions](https://www.materialinsights.org/products/p_wind_turbine_generating_set/prod-interventions/index.md)