# Wind turbine tower: Bill of materials

Source page: https://www.materialinsights.org/products/p_wind_turbine_tower/prod-bom/

#### About these figures

Which unit, study and year the composition figures describe, and how they vary

Composition follows the section weights of the GE 158 tubular tower at 120.9 m hub height (2019), probably for a 5.3 MW turbine ^[4]; 4.2 MW towers from Vestas (112 m) and Enercon (130 m) give the low and high values ^[28]^[6]^[29]. Concrete hybrid and lattice variants have no published mass in the sources opened. Forged flanges, heavy steel plate and the foundation are not yet nodes: flanges and plate are listed as new products, and the foundation belongs to the wind farm.

as of 2026-11-17

#### Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content
 Variant 1 **Tubular steel**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | 351,000 kgrange 339,000 to 386,000 kg | – |
| Calculated: the six section weights of the GE 158 tower at 120.9 m hub height add up to about 351 tonnes, plus a base ring of about 15 tonnes ^[4]. Towers for 4.2 MW turbines bracket it: about 339 t at 112 m for the Vestas V136-4.2 (544 t turbine mass minus 205 t tower-top mass, calculated) ^[28]^[6] and 386 t of steel sections at 130 m for the Enercon E-138 EP3 ^[29]^[30]. Plate is S355 grade steel ^[5]. |  |  |  |
| [Pnt Paints and coatings](https://www.materialinsights.org/chemicals/paints_coatings/) | Functional | Not given | – |
| A coating system protects the shell from rust. No opened source gives its mass. |  |  |  |

 Variant 2 **Concrete hybrid**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | Not given | – |
| Steel is used in the top sections only. A hybrid tower at Nordex has two steel sections over a concrete part ^[12]. No source gives its steel mass. |  |  |  |
| [Cem Cement](https://www.materialinsights.org/commodities/cement/) | Structural | Not given | – |
| The lower part of a hybrid tower is concrete ^[12]. No opened source gives its volume or mass. |  |  |  |

 Variant 3 **Lattice steel**

| Material | Role | Amount in one unit | Share of the unit's mass |
|---|---|---|---|
| [St Steel](https://www.materialinsights.org/commodities/steel/) | Structural | Not given | – |
| Suzlon says its hybrid lattice and tubular design reduces the steel requirement but gives no figure ^[27]. |  |  |  |

Indicative · as of 2026-11-17. Amounts are for one tubular steel tower of about 120 m, from makers' weight tables. Concrete hybrid and lattice masses were not found.

#### How it is put together

The main steps from parts and materials to the finished unit

| Step | What happens | Technology | Source |
|---|---|---|---|
| Buy heavy steel plate | Plates, mainly S355 grade, in thicknesses from 12 mm up to 63 mm, are bought from steel mills ^[15] | Basic oxygen steelmaking | ^[15] |
| Cut and roll | Plates are cut and rolled into cylindrical or conical shells ^[13] | – | ^[13] |
| Weld sections | Rolled shells are welded together into tower sections, up to 28 m long in the GE 158 tower ^[13]^[4] | – | ^[13]^[4] |
| Attach flanges and internals | Forged flanges are fitted at each end of a section, with door frames, ladders and cable supports inside | – | – |
| Blast and coat | The steel is cleaned and coated against corrosion before it leaves the plant | – | – |
| Transport and erect | Sections up to 4.3 m wide go by road and are bolted together on the foundation ^[4]^[9] | – | ^[4]^[9] |

as of 2026-11-17

#### Technologies used to make it

The technologies used to make it, at which step
 Made with

- [BOS Basic oxygen steelmaking](https://www.materialinsights.org/technologies/basic_oxygen_steelmaking/) Making steel plate from iron ore (blast furnace and oxygen converter route) The global average for steel is 1.92 t CO2 per tonne; the blast furnace route emits 2.34 and scrap-based arc furnaces 0.69 ^[16]. Which route supplies plate for towers is not stated in the sources opened.
- [EAF Electric arc furnace](https://www.materialinsights.org/technologies/electric_arc_furnace/) Making steel plate from scrap (electric arc furnace route) Siemens Gamesa's GreenerTower plate comes from an electric arc furnace fed with green electricity ^[3]; scrap-based arc furnace steel averaged 0.69 t CO2 per tonne in 2024 ^[16].

as of 2026-11-17

#### Sources

1. [Siemens Gamesa introduces GreenerTower (15 June 2023)](https://windsystemsmag.com/siemens-gamesa-introduces-greenertower/) Wind Systems magazine, 2023
2. [Technical Documentation, Wind Turbine Generator Systems, GE 158 - 50/60 Hz: Weights and Dimensions (Rev. 03, 2019-05-02)](https://api.commissiemer.nl/projectdocumenten/013938_3516_B5.9_GE_Weight_and_Dimensions_avg_conform.pdf) General Electric (copy in Dutch EIA project documents), 2019
3. [Prüfbericht für eine Typenprüfung 2839951-13-d: Prüfung der Standsicherheit, Stahlrohrturm, Vestas V150-4.0/4.2MW MK3E, 123 m Nabenhöhe (6 March 2019)](https://www.landkreis-straubing-bogen.de/media/7809/0411_2839951-13-d_vestas_v150-mk3e_stahlturm_hh123m.pdf) TÜV SÜD Industrie Service GmbH, 2019
4. [Prüfbericht für eine Typenprüfung 2839951-17-d: Prüfung der Standsicherheit, Stahlrohrturm, Vestas V136-4.0/4.2MW-Mk3E, 112 m Nabenhöhe (18 December 2018)](https://www.uvp-verbund.de/documents-ige-ng/igc_nw/b41a21d3-113e-4357-b63b-485a59d107bf/Antragsunterlagen%2F03%20Typenpr%C3%BCfung%2F3.2.2%20Pr%C3%BCfbericht%20Standsicherheit%20Stahlrohrturm.pdf) TÜV SÜD Industrie Service GmbH, 2018
5. [Geometric optimisation analysis of Steel-Concrete hybrid wind turbine towers, Structures 35, 1125-1137](https://sas.rochester.edu/chm/courses/chm286_486/HomeWork2024/Project2/Huang-Wind-towers-Steel-Concrete_1-s2.0-S2352012421007487-main.pdf) Huang X, Li B, Zhou X, Wang Y, Zhu R (Elsevier; copy on a University of Rochester course page), 2022
6. [Technische Beschreibung: Anlagenklasse Nordex Delta4000 N149/4.0-4.5 (E0004051131, Revision 07, 15 April 2019)](https://www.uvp-verbund.de/documents-ige-ng/igc_nw/DCD9698C-AB38-44BB-8880-127866ACE898/07_Anlagenbeschreibung.pdf) Nordex Energy (permit documents, UVP-Verbund), 2019
7. [Utility Scale Wind Towers from China and Vietnam, Publication 4888 (April 2019)](https://usitc.gov/publications/701_731/pub4888.pdf) US International Trade Commission, 2019
8. [Re-Imagineering the Wind Energy Sector under the aegis of AM/NS India](https://nbmcw.com/product-technology/building-materials/re-imagineering-the-wind-energy-sector-under-the-aegis-of-am-ns-india.html) NBM&CW (NBM Media), 2023
9. [Sustainability Indicators Report 2025 (table of CO2 emissions and energy intensity 2022-2024, added February 2026)](https://worldsteel.org/zh-hans/wider-sustainability/sustainability-indicators/sustainability-indicators-report-2025/) worldsteel, 2026
10. [Suzlon bags the Golden Peacock Eco-Innovation Award for its S97 120 meter hybrid tower wind turbine (11 July 2016)](https://www.epcworld.in/suzlon-bags-the-golden-peacock-eco-innovation-award-for-its-s97-120-meter-hybrid-tower-wind-turbine/) EPC World, 2016
11. [Material use in Vestas turbines (brochure 04/2024-EN)](https://www.vestas.com:443/content/dam/vestas-com/global/en/sustainability/environment/2024_04_Material-Use-Brochure_Vestas.pdf.coredownload.inline.pdf) Vestas Wind Systems, 2024
12. [Technisches Datenblatt / Technical data sheet: Turm / Tower E-138 EP3, Hybrid-Stahlturm, hub height 130.07 m (D0905997-2)](https://uvp-verbund.de/documents-ige-ng/igc_rp/EBD6F947-5317-4927-A722-4A7C9783E046/11.3_Datenblatt_Gewichte%2CAbmessg_E-138_EP3_E2%20HST-131.pdf) Enercon (permit documents, UVP-Verbund)
13. [ENERCON E-138 EP3 product brochure (last updated 02/2020)](https://windeurope.org/ElectricCity2021/files/exhibition/exhibitor-highlight/enercon/Enercon-brochure-E-138-EP3-EN.pdf) Enercon (copy on the WindEurope Electric City 2021 site), 2020

## Other sections

- [Summary](https://www.materialinsights.org/products/p_wind_turbine_tower/index.md)
- [Working](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-working/index.md)
- [Use case](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-use/index.md)
- [Supply chain](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-supply/index.md)
- [Footprint](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-footprint/index.md)
- [Evolution](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-evolution/index.md)
- [Interventions](https://www.materialinsights.org/products/p_wind_turbine_tower/prod-interventions/index.md)
