# Cloud computing: Levers

Source page: https://www.materialinsights.org/technologies/cloud_computing/tech-levers/

Held back most by

Resources and rules

Cloud computing works and sells, but it is built in data centres that drew about 415 TWh, around 1.5% of world electricity, in 2024 ^[7]. India's capacity grew from about 375 MW in 2020 to around 1500 MW by 2025 ^[13], so land, grid connection and clean power decide how fast it can grow. This is a judgement about the next ten years.

#### The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A **hard limit** comes from mathematics or nature and can only be sidestepped; a **soft limit** moves with effort, scale, money or policy.

1.  1 Mathematics Hard limit

Mathematics came later

**What it gives.** Rules for splitting work across many machines and pooling users on shared hardware.

**The idea.** Role: later. Cloud services were built by trial and craft; theory explained their limits afterwards. Amdahl's law says the speed-up from adding machines is capped by the part of the job that cannot be split ^[9].

**The limit.** For a job of fixed size, however many machines are added, the serial part sets the best possible speed-up ^[9].

**What could unlock it.** Redesigning software so a smaller part of it runs in sequence moves the cap, and growing the job with the machines sidesteps the fixed-size assumption (judgement).

Show the maths speedup = 1 / ((1-P) + P/N)

**speedup**
: how many times faster the job runs than on one machine

**P**
: the share of the job that can be run in parallel, between 0 and 1

**N**
: the number of machines

**1-P**
: the share that must run one step after another

**In plain words.** Imagine a job in two parts. One part can be shared out among many workers. The other part must be done by one worker, one step after the other. Adding more workers speeds up the first part only. So the slow single-worker part sets a ceiling on the gain.

**Worked example.** If 95% of a job can run in parallel (P = 0.95, assumed) on N = 100 machines (assumed): 1 ÷ (0.05 + 0.95 ÷ 100) = 1 ÷ 0.0595 = about 16.8 times faster, not 100 (calculated) ^[9].

2.  2 Science Hard limit

**What it gives.** The physics of moving signals and shedding heat: both set where data centres can sit and how fast they can reply.

**The idea.** Light in glass fibre travels about 1.5 times slower than in a vacuum, so latency is 5 microseconds per kilometre ^[10]. A customer far from the data centre pays a time cost that no software can remove.

**The limit.** Delay equals distance divided by speed, and the speed of light in fibre is a fixed property of the glass ^[10].

**What could unlock it.** Placing data centres, and caches, closer to users cuts the distance (judgement).

Show the maths tLatency = Distance / Velocity

**tLatency**
: the delay for a signal to arrive, in seconds

**Distance**
: the length of the path, in metres

**Velocity**
: the speed of the signal along the path, in metres a second; in fibre about two thirds of the speed of light in a vacuum

**In plain words.** A signal takes time to travel. The farther it goes, the longer it takes. In glass fibre light is a little slower than in empty space. So a data centre far away always answers a little later than a near one.

**Worked example.** Over 1,000 km of fibre at 5 microseconds per km, the one-way delay is 1,000 × 5 = 5,000 microseconds = 5 ms (calculated) ^[10]. A round trip is twice that, 10 ms (calculated).

3.  3 Engineering Soft limit

**What it gives.** Racks of servers, networks and cooling that turn electricity into computing, with software to share each machine among customers.

**The idea.** A data centre's overhead is measured by power usage effectiveness, the total energy of the facility divided by the energy used by the IT equipment ^[11]. Worldwide, data centres used around 415 TWh in 2024, about 1.5% of global electricity ^[7].

**The limit.** All the electricity ends as heat that must be removed, so cooling and power supply set the density of equipment (judgement).

**What could unlock it.** Better cooling, higher-efficiency power supplies and better use of servers lower the overhead; PUE alone does not show whether the IT equipment is used well (judgement).

Show the maths PUE = Total facility energy / IT energy

**PUE**
: power usage effectiveness: a plain ratio, never below 1

**Total facility energy**
: all the energy the building uses in a year, in kWh

**IT energy**
: the energy used by servers, storage and network gear, in kWh

**In plain words.** A data centre uses electricity for computers and also for cooling, lights and power losses. PUE compares the two. If the building used exactly as much as the computers, PUE would be 1. The extra is overhead.

**Worked example.** If a building uses 1,200 kWh while its IT equipment uses 1,000 kWh (both assumed), PUE = 1,200 ÷ 1,000 = 1.2 (calculated) ^[11].

4.  4 Production Soft limit

**What it gives.** Standard servers and networking, built in quantity and installed in shells that can be repeated.

**The idea.** India's data centre capacity grew from about 375 MW in 2020 to around 1500 MW by 2025 ^[13], a fourfold rise (calculated: 1500 ÷ 375 = 4).

**The limit.** The build rate depends on chip supply, power equipment, cooling plant and construction labour (judgement).

**What could unlock it.** Repeatable designs and local assembly of servers shorten the build time (judgement).

5.  5 Economics Soft limit

**What it gives.** A price per hour of computing, rented, so customers avoid owning machines.

**The idea.** World cloud infrastructure service revenues (IaaS, PaaS and hosted private cloud) were 106.9 billion US dollars in the third quarter of 2025 ^[12]. Synergy reports that in public cloud the top three providers account for 67% of the market ^[12].

**The limit.** Building capacity needs large capital before customers arrive, and a few firms hold most of the public cloud market ^[12], so smaller providers face the cost of capital and scale (judgement).

**What could unlock it.** Local providers and public programmes can serve customers who need data kept in India (judgement).

6.  6 Resources and rules Soft limit Binds most today

**What it gives.** Land, grid connection, clean power and rules that let data centres be built at world scale.

**The idea.** Data centres used around 415 TWh in 2024, about 1.5% of global electricity ^[7]. India's capacity was around 1500 MW by 2025 ^[13]. MeitY proposed a draft Data Centre Policy in 2020, and the government says it is committed to making India a global data centre hub, with uninterrupted, clean and cost-effective electricity one of the most important considerations ^[14].

**The limit.** Clean, reliable power binds most ^[14]; grid connections, water and land also bind more than the servers themselves (judgement).

**What could unlock it.** A policy that gives data centres a clear route to power, land and approvals would speed building ^[14].

as of 2026-11-24

#### Sources

1. [Energy and AI: Energy demand from AI](https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai) International Energy Agency, 2025
2. [Parallel Performance Analysis: Amdahl's Law, CS 441 lecture](https://www.cs.uaf.edu/2010/fall/cs441/lecture/11_02_analysis.html) University of Alaska Fairbanks, Computer Science, 2010
3. [Latency in Optical Fiber Systems (WP-111432-EN, February 2017)](https://www.commscope.com/globalassets/digizuite/2799-latency-in-optical-fiber-systems-wp-111432-en.pdf?r=1) CommScope, 2017
4. [Data Center Metrics Task Force Recommendations V2 (17 May 2011)](https://www.energystar.gov/sites/default/files/Data_Center_Metrics_Task_Force_Recommendations_V2.pdf) ENERGY STAR, US Environmental Protection Agency, 2011
5. [Cloud Market Growth Rate Rises Again in Q3; Biggest Ever Sequential Increase](https://www.srgresearch.com/articles/cloud-market-growth-rate-rises-again-in-q3-biggest-ever-sequential-increase) Synergy Research Group, 2025
6. [Data centre capacity in the country has increased from about 375 MW in 2020 to around 1500 MW by 2025 (last updated 17 April 2026)](https://www.digitalindia.gov.in/press_release/data-centre-capacity-in-the-country-hasincreased-from-about-375-mw-in-2020-toaround-1500-mw-by-2025/) Digital India, Government of India, 2026
7. [India to be a Cloud Computing and Data Centre Hub (8 December 2022)](https://static.pib.gov.in/WriteReadData/specificdocs/documents/2022/dec/doc2022128141601.pdf) Press Information Bureau, Government of India, 2022

## Other sections

- [Summary](https://www.materialinsights.org/technologies/cloud_computing/index.md)
- [Overview](https://www.materialinsights.org/technologies/cloud_computing/tech-overview/index.md)
- [Science](https://www.materialinsights.org/technologies/cloud_computing/tech-science/index.md)
- [Evolution](https://www.materialinsights.org/technologies/cloud_computing/tech-evolution/index.md)
- [Energy footprint](https://www.materialinsights.org/technologies/cloud_computing/tech-energy-footprint/index.md)
- [Industries](https://www.materialinsights.org/technologies/cloud_computing/tech-industries/index.md)
