# Underground, submarine and superconducting cables: Levers

Source page: https://www.materialinsights.org/technologies/e_cables/tech-levers/

Held back most by

Economics

The physics and the equipment exist, but the Ministry of Power says cables are used case by case for short distances because of higher cost than overhead lines and the reactive compensation they need ^[14]. Cable costs have nearly doubled since 2019 in real terms ^[16], so a lower price, not a new physical idea, would widen use in India.

#### The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A **hard limit** comes from mathematics or nature and can only be sidestepped; a **soft limit** moves with effort, scale, money or policy.

1.  1 Mathematics Hard limit

Mathematics is the language of its physics

**What it gives.** Geometry gives a cable's capacitance: a cable core inside a screen is a cylindrical capacitor, and a closed formula gives its value from the two radii ^[20].

**The idea.** A physical law does the work and mathematics only describes it, so the role is language. A coaxial cable is two concentric conductors with insulation between them ^[20], so its capacitance grows with length and depends on the ratio of the radii only through a logarithm ^[20].

**The limit.** Every metre of AC cable adds the same capacitance, so a long cable is always a large capacitor; thinner insulation makes it larger ^[20].

**What could unlock it.** Direct current does not keep charging the cable, so long links switch to it ^[14].

[HVDC HVDC links](https://www.materialinsights.org/technologies/e_hvdc/)

Show the maths C = 2π × ε0 × l ÷ ln(R2 ÷ R1)

**C**
: the capacitance of the cable, in farads

**ε0**
: the permittivity of free space, 8.85 × 10^-12 farads a metre

**l**
: the length of the cable, in metres

**R1**
: the radius of the inner conductor, in metres

**R2**
: the inner radius of the outer screen, in metres

**ln**
: the natural logarithm

**In plain words.** A cable is a wire inside a metal tube with plastic in between. That shape stores electric charge, like a battery that fills and empties. The longer the cable, the more it stores. Pull the wire and tube closer and it stores more.

**Worked example.** The formula and ε0 are the source's ^[20]; it is for a vacuum gap. Assume R2 ÷ R1 = 2 and l = 1,000 m (assumed): C = 2π × 8.85 × 10^-12 × 1,000 ÷ ln 2 = 0.080 µF for each km (calculated). Plastic insulation raises this by its dielectric constant, taken as 2.3 (assumed), to about 0.18 µF for each km (calculated).

2.  2 Science Hard limit

**What it gives.** A cable is two conductors with insulation between them, so with alternating current it keeps charging and discharging like a capacitor ^[13].

**The idea.** A capacitor passes more current the larger it is ^[13], and a long cable is a large capacitor, so on AC it draws a charging current that grows with its length. This is why 220 kV to 400 kV cables in India are used only for short distances where overhead lines are hard to lay, because of the higher reactive compensation needed ^[14].

**The limit.** Cable capacitance: charging current rises with cable length until it fills the cable's rating, so long AC cables need compensation or a switch to direct current ^[13]^[14].

**What could unlock it.** Direct current has no repeated charging, so long subsea links use it; reactive compensation along an AC cable is the other route ^[14].

[HVDC HVDC links](https://www.materialinsights.org/technologies/e_hvdc/)

Show the maths XC = 1 ÷ (2π × f × C)

**XC**
: the capacitor's resistance to alternating current, in ohms

**f**
: the grid frequency, in hertz

**C**
: the capacitance of the cable, in farads

**In plain words.** On a 50 hertz grid the voltage swings back and forth 50 times a second. Each swing fills and empties the cable. A bigger cable lets more current flow just to do that. That current takes up room the useful power needs.

**Worked example.** The formula is the source's ^[13]. Take 50 km of the cable in the maths row, 0.18 µF for each km (calculated), so C = 9.2 µF (calculated), at 50 Hz (assumed): XC = 1 ÷ (2π × 50 × 9.2 × 10^-6) = 345 Ω (calculated). At 231 kV to earth (400 kV ÷ √3, assumed), the charging current is 231,000 ÷ 345 = 670 A (calculated), much of a cable's rating.

3.  3 Engineering Soft limit

**What it gives.** The 10 kV AmpaCity cable in Essen, Germany, is a working superconducting cable of 1 km that joins two substations in a city centre ^[15].

**The idea.** It carries five times the current of a conventional cable of the same outer size, with a capacity of 40 MVA, and liquid nitrogen cools it ^[15]. The project chose it as the preferred option on life-cycle cost for that site ^[15].

**The limit.** A superconducting cable needs liquid nitrogen cooling and terminations that bridge a temperature difference of about 200 K ^[15], so it suits short, crowded routes.

**What could unlock it.** Cheaper high-temperature superconductor tape and better cryogenic plant would widen its use ^[15].

4.  4 Production Soft limit

**What it gives.** Cable makers supply long continuous lengths, and the supply is stretched by grid building worldwide ^[16].

**The idea.** The IEA says procurement now takes two to three years for cables, and that in real terms cable costs have nearly doubled since 2019 ^[16]. Transformer prices are up by around 75% ^[16].

**The limit.** Factory capacity and order books of a few cable makers set how fast new links can start ^[16].

**What could unlock it.** Orders placed years ahead and local factories shorten the wait ^[16].

5.  5 Economics Soft limit Binds most today

**What it gives.** An underground cable costs more than an overhead line, and for that reason the Ministry of Power says cables are used case by case for short distances ^[14].

**The idea.** The reply names the higher cost compared with an overhead system, and the reactive compensation needed, as the reasons ^[14]. New transmission earns a regulated return on equity of 15.00% from April 2024 ^[18].

**The limit.** Cost of capital and cost against the overhead alternative: a buried line is paid for up front, so a higher interest rate raises its cost of each unit carried ^[17]^[14].

**What could unlock it.** Where land is dear or blocked, a cable avoids the cost of delay; mass orders and better insulation lower its price over time ^[14]^[16].

Show the maths CRF = i × (1 + i)^n ÷ ((1 + i)^n - 1)

**CRF**
: the capital recovery factor: the share of the up-front cost paid each year

**i**
: the yearly cost of capital, as a fraction

**n**
: the number of years the cable earns

**In plain words.** Money borrowed to lay a cable must be paid back with interest over its life. This number says what share of the original bill you pay every year. A higher interest rate makes the share bigger.

**Worked example.** The formula is the source's ^[17]. The regulations give a useful life of 35 years for transmission lines but no entry for cables in the part I read ^[18], so assume n = 35 and i = 10% or 12% (assumed). At 10%, CRF = 0.1037, or Rs 10.37 crore a year for each Rs 100 crore spent; at 12%, CRF = 0.1223, or Rs 12.23 crore, which is 18% more (calculated).

6.  6 Resources and rules Soft limit

**What it gives.** Permission and land decide where a cable beats a line: cables are used where overhead lines are difficult to lay ^[14].

**The idea.** Lok Sabha was told in 2020 of 54 listed underground systems, 28 commissioned and 26 under execution, almost all at 220 kV, with a few at 400 kV and one HVDC link at 320 kV ^[14]. Right of way is one of the most significant challenges for transmission in India ^[19].

**The limit.** Land acquisition and right of way: compensation disputes delay overhead lines, which is the reason for choosing cables, but cables need trenching permission and a long supply wait ^[19]^[16].

**What could unlock it.** The IEA says permitting remains the primary cause of delays in transmission projects, so faster permits help every route, buried or not ^[6].

[HVDC HVDC links](https://www.materialinsights.org/technologies/e_hvdc/)

as of 2026-11-23

#### Sources

1. [Building the Future Transmission Grid: executive summary](https://www.iea.org/reports/building-the-future-transmission-grid/executive-summary) IEA, 2025
2. [23.11 Reactance, Inductive and Capacitive (College Physics 2e)](https://openstax.org/books/college-physics-2e/pages/23-11-reactance-inductive-and-capacitive) OpenStax, Rice University
3. [Lok Sabha Unstarred Question 2377: underground cable systems of 220 kV and above (reply of the Minister of Power, 5 March 2020)](https://eparlib.nic.in/bitstream/123456789/970828/1/AU2377.pdf) Lok Sabha, Parliament of India, 2020
4. [The AmpaCity Project](https://www.tdworld.com/overhead-distribution/article/20964180/the-ampacity-project) T&D World, 2013
5. [Rising component prices and supply chain pressures are hindering the development of transmission grid infrastructure](https://www.iea.org/news/rising-component-prices-and-supply-chain-pressures-are-hindering-the-development-of-transmission-grid-infrastructure) IEA, 2025
6. [Simple levelized cost of energy (LCOE) calculator documentation](https://www.nlr.gov/analysis/tech-lcoe-documentation) National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026
7. [CERC (Terms and Conditions of Tariff) Regulations, 2024](https://www.cercind.gov.in/regulations/notification-2024.pdf) Central Electricity Regulatory Commission, 2024
8. [Modernising the Grid: Technology trends shaping the transmission segment](https://powerline.net.in/2025/12/09/modernising-the-grid-technology-trends-shaping-the-transmission-segment/) Power Line, 2025
9. [8.1 Capacitors and Capacitance (University Physics Volume 2)](https://openstax.org/books/university-physics-volume-2/pages/8-1-capacitors-and-capacitance) OpenStax, 2016

## Other sections

- [Summary](https://www.materialinsights.org/technologies/e_cables/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_cables/overview/index.md)
- [Correlation](https://www.materialinsights.org/technologies/e_cables/correlation/index.md)
- [How it works](https://www.materialinsights.org/technologies/e_cables/explain/index.md)
- [Efficiency and losses](https://www.materialinsights.org/technologies/e_cables/efficiency/index.md)
- [Technology advances](https://www.materialinsights.org/technologies/e_cables/advances/index.md)
- [Value chain](https://www.materialinsights.org/technologies/e_cables/valuechain/index.md)
- [Geopolitics and regulation](https://www.materialinsights.org/technologies/e_cables/geopolitics/index.md)
- [Unit economics](https://www.materialinsights.org/technologies/e_cables/economics/index.md)
- [Impact on the biosphere](https://www.materialinsights.org/technologies/e_cables/biosphere/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_cables/tech-overview/index.md)
- [Science](https://www.materialinsights.org/technologies/e_cables/tech-science/index.md)
- [Evolution](https://www.materialinsights.org/technologies/e_cables/tech-evolution/index.md)
- [Materials](https://www.materialinsights.org/technologies/e_cables/tech-materials/index.md)
- [Energy footprint](https://www.materialinsights.org/technologies/e_cables/tech-energy-footprint/index.md)
- [Industries](https://www.materialinsights.org/technologies/e_cables/tech-industries/index.md)
- [Relationships](https://www.materialinsights.org/technologies/e_cables/links/index.md)