# Data centres: Levers

Source page: https://www.materialinsights.org/technologies/e_data_centres/tech-levers/

Held back most by

Resources and rules

The physical limit is far: survey sites average a PUE of 1.54 against a floor of 1, and one operator's fleet is at 1.09 ^[3]^[4]. What binds in India is power and water at scale: capacity went from about 375 MW in 2020 to around 1500 MW in 2025 ^[14], a 1 MW facility may use up to 25.5 million litres of water a year, and 21 Indian cities could exhaust their groundwater by 2030 ^[15].

#### The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A **hard limit** comes from mathematics or nature and can only be sidestepped; a **soft limit** moves with effort, scale, money or policy.

1.  1 Mathematics Hard limit

Mathematics is the language of its physics

**What it gives.** The bookkeeping that shows how much of a site's energy reaches the computers.

**The idea.** A data centre runs on physics, electricity in and heat out, and mathematics keeps the books, so the role is language. The building is judged by one ratio: all the energy it takes divided by the energy that reaches the computers ^[11].

**The limit.** The total includes the computers' own energy, so the ratio can never be below 1 ^[11].

**What could unlock it.** Google's fleet average of 1.09 in 2025 means 9 units of overhead for each 100 units of computing energy (calculated) ^[4].

Show the maths PUE = Total Energy ÷ IT Energy

**PUE**
: power usage effectiveness: a ratio with no unit

**Total Energy**
: all the energy the data centre takes in, including cooling and power conversion, in the same unit as below

**IT Energy**
: the energy used by the servers, storage and network equipment alone

**In plain words.** A data centre does two jobs: it runs computers and it keeps them cool. PUE is the whole bill divided by the bill for the computers alone. If the cooling cost nothing, it would be exactly 1. The higher the number, the more is spent on things other than computing.

**Worked example.** The Uptime survey's weighted average PUE was 1.54 in 2025, so for each 1 kWh at the computers the site took 1.54 kWh, with 0.54 kWh of overhead (calculated) ^[3]. Google's 1.09 gives 0.09 kWh of overhead, and 1 - 0.09 ÷ 0.54 = 83% less overhead (calculated), the same as the page prints ^[4].

2.  2 Science Hard limit

**What it gives.** The second law, applied to information: forgetting a bit has a minimum cost in heat.

**The idea.** Erasing one bit of information must give off at least kT ln 2 of heat, called the Landauer bound, about 2.9 × 10^-21 J at room temperature ^[12]. The same review says modern computers give off energy for each logic operation that exceeds this bound by many orders of magnitude ^[12].

**The limit.** No computer can erase a bit and give off less than k times temperature times ln 2 as heat ^[12].

**What could unlock it.** No page opened here shows a way round the bound.

Show the maths Q ≥ kB T ln 2

**Q**
: the heat given off when one bit is erased, in joules

**kB**
: Boltzmann's constant, 1.38 × 10^-23 joules a kelvin

**T**
: the temperature of the surroundings, in kelvin

**ln 2**
: the natural log of 2, 0.693: one bit is a choice between two states

**In plain words.** A bit is a choice between two things, such as on and off. To wipe a bit clean, the machine must squeeze two possible states into one. Squeezing like that must push a little heat out into the room. The amount is tiny, but it is never zero.

**Worked example.** At T = 300 K (assumed) and kB = 1.38 × 10^-23 J/K (assumed): Q = 1.38 × 10^-23 × 300 × 0.693 = 2.87 × 10^-21 J (calculated), in line with the 2.9 × 10^-21 J the source gives ^[12]. Erasing 8 × 10^12 bits, a terabyte (assumed), would then give off at least 2.3 × 10^-8 J (calculated).

3.  3 Engineering Soft limit

**What it gives.** Chips, racks, cooling and power systems that run day and night without a break.

**The idea.** In 2025 the respondents to the Uptime Institute's survey, 835 end users who registered and answered at least one question, had a weighted average PUE of 1.54, and power was the top cause of impactful outages, 45% of incidents ^[3]. Google's global fleet averaged 1.09 in 2025 ^[4].

**The limit.** Any energy used beyond the computers' own, such as cooling, lifts the ratio above its floor of 1, which follows from the definition ^[11]; and every hour spent on repair is an hour offline ^[17].

Power usage effectiveness (PUE)

Today (2025): **1.54 ratio** · Floor: **1 ratio** · today is 1.5 times the floor

Today is the weighted average of the Uptime Institute survey respondents, 2025, not a random sample of all sites ^[3]; one operator's fleet reached 1.09 ^[4]. The floor of 1 follows from the definition ^[11].

**What could unlock it.** Operators that design for efficiency show it can be done: Google's fleet is at 1.09, against the survey's 1.54 ^[3]^[4].

Show the maths A = MTBF ÷ (MTBF + MTTR)

**A**
: the availability: the share of time the system is working, a fraction

**MTBF**
: the mean time between failures: the average time it runs before it fails, in hours

**MTTR**
: the mean time to repair: the average time it is down while being mended, in hours

**In plain words.** A machine works for a while, breaks, and is mended. Availability is the share of time it is working. Long runs between failures and quick repairs both push it up. A data centre wants it as close to 1 as it can get.

**Worked example.** A system that runs 10,000 hours between failures and takes 4 hours to repair (both assumed): A = 10,000 ÷ 10,004 = 0.9996, so it is down about 0.04% of the 8,760 hours in a year, about 3.5 hours (calculated) ^[17].

4.  4 Production Soft limit

**What it gives.** Halls, servers, power equipment and cooling plant built fast and in quantity.

**The idea.** India's data centre capacity rose from about 375 MW in 2020 to around 1500 MW in 2025, four times as much (calculated) ^[14]. The IEA's headwinds case has a tight supply chain that causes delays in capacity expansion ^[13].

**The limit.** Equipment and infrastructure can take longer to deliver than a data centre takes to build: the IEA says the broader energy system requires longer lead times to schedule and build infrastructure ^[13].

**What could unlock it.** India's own build-out quadrupled capacity in five years, which shows what orders at scale can do ^[14].

5.  5 Economics Soft limit

**What it gives.** A price for computing, and a return on halls, servers and power.

**The idea.** Takshashila puts the average cost of grid electricity in India at US$ 0.085/kWh and diesel generator power at US$ 0.28/kWh, about 3.3 times as much (calculated), and says that relying substantially on diesel generators is not cost-effective ^[15].

**The limit.** Operators pay for uptime: grid supply is not uninterrupted, and outages cause malfunctions, data loss and equipment failure ^[15].

**What could unlock it.** Dependable grid power at US$ 0.085/kWh against US$ 0.28/kWh for diesel is the cheaper route ^[15].

6.  6 Resources and rules Soft limit Binds most today

**What it gives.** Grid connections, land, water and permission to build at national scale.

**The idea.** The IEA estimates data centres used around 415 TWh in 2024 and projects around 945 TWh by 2030 in its Base Case ^[13]. A 1 MW facility may consume up to 25.5 million litres of water a year, about 70,000 litres a day (calculated), and 21 Indian cities could exhaust their groundwater by 2030 ^[15]. Transmission and distribution losses were 16.64 percent in FY2023-24 ^[15].

**The limit.** Data centres adding significant load to the main grid risk exacerbating existing pressures, and the Economic Survey calls them double-edged because they are very energy-intensive ^[15]^[16].

**What could unlock it.** No page opened here reports what has moved this limit.

as of 2026-11-23

#### Sources

1. [Uptime Institute Global Data Center Survey 2025](https://datacenter.uptimeinstitute.com/rs/711-RIA-145/images/2025.Annual.Survey.Report.pdf?version=0) Uptime Institute, 2025
2. [Data centers: efficiency (power usage effectiveness)](https://datacenters.google/efficiency) Google, 2026
3. [November 2014 ENERGY STAR Score for Data Centers in the United States, Technical Reference](https://www.energystar.gov/sites/default/files/tools/Data%20Centers.pdf) ENERGY STAR (US EPA), 2014
4. [Landauer Principle and Thermodynamics of Computation (Chattopadhyay, Misra, Pandit and Paul), arXiv 2506.10876v2, 5 August 2025](https://arxiv.org/pdf/2506.10876) arXiv, 2025
5. [Energy and AI: Energy demand from AI (the page shows no date)](https://iea.org/reports/energy-and-ai/energy-demand-from-ai) International Energy Agency
6. [Data centre capacity in the country has increased from about 375 MW in 2020 to around 1500 MW by 2025 (last updated 17 April 2026)](https://www.digitalindia.gov.in/press_release/data-centre-capacity-in-the-country-hasincreased-from-about-375-mw-in-2020-toaround-1500-mw-by-2025/) Digital India, Government of India, 2026
7. [Building India's Data Centres (Anwesha Sen, 29 October 2025)](https://takshashila.org.in/content/publications/20251029-Building-Indias-Data-Centres.html) Takshashila Institution, 2025
8. [Eco Survey flags strain on grids, groundwater due to AI data centres (news report of the Economic Survey, 29 January 2026)](https://www.business-standard.com/budget/news/eco-survey-flags-strain-on-grids-groundwater-due-to-ai-data-centres-126012901461_1.html) Business Standard, 2026
9. [Reliability / Availability (training slides, undated)](https://cache.industry.siemens.com/dl/files/490/16818490/att_838358/v1/16818490_reliability_en.pdf) Siemens, 2026

## Other sections

- [Summary](https://www.materialinsights.org/technologies/e_data_centres/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_data_centres/overview/index.md)
- [Correlation](https://www.materialinsights.org/technologies/e_data_centres/correlation/index.md)
- [Science and limits](https://www.materialinsights.org/technologies/e_data_centres/science/index.md)
- [Value chain](https://www.materialinsights.org/technologies/e_data_centres/valuechain/index.md)
- [Unit economics](https://www.materialinsights.org/technologies/e_data_centres/economics/index.md)
- [Engineering methods](https://www.materialinsights.org/technologies/e_data_centres/methods/index.md)
- [Equipment and suppliers](https://www.materialinsights.org/technologies/e_data_centres/equipment/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_data_centres/tech-overview/index.md)
- [Science](https://www.materialinsights.org/technologies/e_data_centres/tech-science/index.md)
- [Evolution](https://www.materialinsights.org/technologies/e_data_centres/tech-evolution/index.md)
- [Materials](https://www.materialinsights.org/technologies/e_data_centres/tech-materials/index.md)
- [Energy footprint](https://www.materialinsights.org/technologies/e_data_centres/tech-energy-footprint/index.md)
- [Industries](https://www.materialinsights.org/technologies/e_data_centres/tech-industries/index.md)
- [Relationships](https://www.materialinsights.org/technologies/e_data_centres/links/index.md)