# Gas turbines and combined cycle: Levers

Source page: https://www.materialinsights.org/technologies/e_gas_turbines/tech-levers/

Held back most by

Economics

The machine is not the problem: a J-class combined-cycle plant is above 64% efficient ^[4] and the world's makers are sold out, with a 116 GW backlog at one maker ^[18]. In India the price of fuel is: about 25 GW of gas plants stand installed ^[20], yet the fleet ran at 14.5% of its capacity in the year to March 2025, largely because high gas prices made plants uncompetitive ^[19].

#### The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A **hard limit** comes from mathematics or nature and can only be sidestepped; a **soft limit** moves with effort, scale, money or policy.

1.  1 Mathematics Hard limit

Mathematics is the language of its physics

**What it gives.** The pressure-ratio arithmetic that sizes a compressor and turbine before any metal is cut.

**The idea.** A physical law makes the machine work and mathematics sizes it: in the ideal Brayton cycle, efficiency is set by the temperature rise in the compressor, and that rise is fixed by the pressure ratio ^[12]. A pressure ratio of 20 gives 57.5% on paper, using assumed values (calculated).

**The limit.** This ideal cycle assumes perfect parts and cannot beat Carnot's limit between the same temperatures ^[11].

**What could unlock it.** The ideal figure rises as the pressure ratio rises ^[12]; real machines also depend on how hot the gas can be, which is the science and engineering layers.

Show the maths η = 1 - 1 ÷ PR^(γ-1)/γ

**η**
: the efficiency of the ideal cycle, a fraction

**PR**
: the pressure ratio: the pressure after the compressor divided by the pressure before it

**γ**
: the ratio of the gas's two specific heats, a fixed number for a gas; about 1.4 for air

**In plain words.** The compressor squeezes the air, which also heats it. In the ideal engine the share of fuel energy that becomes work depends only on how hot the squeeze makes the air compared with the air that went in. Squeeze harder and the share goes up.

**Worked example.** Assumptions: PR = 20 and γ = 1.4 (cold air). The exponent is 0.4 ÷ 1.4 = 0.286, 20^0.286 = 2.35, so η = 1 - 1 ÷ 2.35 = 0.575, or 57.5% (calculated) ^[12]. The page gives η = 1 - Tinlet ÷ Tcompressor exit and PR^(γ-1)/γ = TR; combining them is my step. Real machines reach less: the best simple cycle is 44.0% ^[4].

2.  2 Science Hard limit

**What it gives.** The second law again: a flame hotter than the surroundings can be turned into work, but only a part of it.

**The idea.** Carnot's limit says the share of heat that can become work depends on the hot and cold temperatures, in kelvin ^[11]. The J-class turbine takes in gas at 1,600 °C, 100 °C hotter than the G class ^[14], and its combined-cycle plant is above 64% on a lower heating value basis ^[4].

**The limit.** No engine can turn more than one minus the cold temperature divided by the hot temperature into work ^[11].

**What could unlock it.** The limit moves only with temperature. In the source's example the gas leaves the turbine at around 500 °C ^[13], so a steam cycle on the exhaust works as a second engine on the same fuel; Nishi-Nagoya Block 1, at 63.08% gross, was named officially the world's most efficient combined-cycle plant in 2018 ^[3].

[ST Steam turbines and thermal power plants](https://www.materialinsights.org/technologies/e_steam_turbines/)[CHP Combined heat and power](https://www.materialinsights.org/technologies/e_chp/)

Show the maths ηmax = 1 - Tc ÷ Th

**ηmax**
: the most work you can get from each unit of heat, a fraction

**Tc**
: the cold temperature, in kelvin (degrees Celsius plus 273.15)

**Th**
: the hot temperature, in kelvin (degrees Celsius plus 273.15)

**In plain words.** Heat does work only as it falls from hot to cold. The gas turbine's hot end is far hotter than a steam boiler's, so the possible share is large. The real machine falls well short, because the fuel is burnt over a range of temperatures, not all at the top one.

**Worked example.** Th = 1,600 °C = 1,873 K (the J-class inlet temperature ^[14]); Tc = 15 °C = 288 K (assumption: a standard ambient temperature). ηmax = 1 - 288 ÷ 1,873 = 0.846, or 85% (calculated) ^[11]. The best plants make above 64% ^[4] and the J-class turbine alone 44.0% ^[4], so the Carnot figure marks a far-off ceiling.

3.  3 Engineering Soft limit

**What it gives.** A compressor, combustor and turbine on one shaft, with a heat recovery boiler and a steam turbine behind it.

**The idea.** The large J-class machine (M501JAC) makes 453 MW and 44.0% on its own and above 64.0% in a one-on-one combined-cycle plant, on a lower heating value basis ^[4]. The US gas fleet's average heat rate in 2025 was 7,781 Btu/kWh ^[16], which is 43.9% efficiency (calculated) ^[15]; EIA does not state its heating value basis, so this is not like for like.

**The limit.** The metal: the 100 °C rise in inlet temperature from the G class needed high-performance cooling and a thermal barrier coating ^[14].

**What could unlock it.** Moving from the G class to the J class meant 100 °C more at the inlet ^[14], using a thermal barrier coating developed in Japanese national projects ^[14].

Show the maths ηcc = ηg + ε × (1 - ηg) × ηv

**ηcc**
: the efficiency of the whole combined-cycle plant, a fraction

**ηg**
: the efficiency of the gas turbine alone, a fraction

**ε**
: how much of the exhaust heat the heat recovery boiler passes on, a fraction

**ηv**
: the efficiency of the steam cycle, a fraction

**In plain words.** The gas turbine turns some of the fuel into power. What it did not use leaves as hot exhaust. The steam side catches most of that heat and turns a part of it into more power. Add the two.

**Worked example.** ηg = 0.44 (the J-class simple cycle ^[4]); ε = 0.83 (assumption: the value in the source's own example ^[13]); ηv = 0.35 (assumption). ηcc = 0.44 + 0.83 × 0.56 × 0.35 = 0.603, or 60% (calculated) ^[13]. The J-class plant is above 64% ^[4], so a real steam side does better than the assumed one.

4.  4 Production Soft limit

**What it gives.** Large turbines built in heavy factories, with forged rotors and internally cooled blades.

**The idea.** GE Vernova's gas equipment backlog and slot reservations reached 116 GW at the end of the second quarter of 2026, and it aims to deliver 20 GW of annual gas turbine output in the third quarter of 2026 ^[18].

**The limit.** Factory capacity for large turbines: orders are far ahead of output, and the maker is implementing actions to raise its output ^[18].

**What could unlock it.** More factory output is the unlock; GE Vernova targets 24 GW a year in 2028 and 30 GW in 2030 ^[18].

Show the maths T = B ÷ O

**T**
: the years to deliver the orders on the books

**B**
: the backlog and slot reservations, in gigawatts

**O**
: the output each year, in gigawatts

**In plain words.** Divide the work waiting by the work done each year. That tells you how long a new customer would queue if no one else joined the line.

**Worked example.** B = 116 GW and O = 20 GW a year, both for GE Vernova alone ^[18]: T = 116 ÷ 20 = 5.8 years (calculated). This ignores new orders and rising output, and reservations are not all firm orders, so it is only a rough guide.

5.  5 Economics Soft limit Binds most today

**What it gives.** Cheap capital, fast building and good efficiency, but a fuel bill that is paid for every unit.

**The idea.** The regulator allows a 15.50% return on equity for thermal stations ^[22] and one state-owned gas station's loans averaged 7.71% ^[21]. On the regulator's own figures, that station's fuel (energy) charge for 2024-29 is Rs 4.41 a kWh, at a gas price of Rs 15,132 a thousand standard cubic metres ^[21], against Rs 1.55 a kWh at NTPC's Singrauli coal station ^[23]; NTPC's Tanda Stage I coal unit was allowed Rs 5.14 for 2024-25 ^[24].

**The limit.** Fuel price: many gas plants are not running because of high gas prices ^[20], and domestic gas is short (see the world layer) ^[19].

**What could unlock it.** Uptake in the power sector is linked by the head of Petronet LNG to prices that stabilise and become more affordable ^[20]; this is a condition, not a forecast.

Show the maths F = P × 3.412 ÷ η

**F**
: the fuel cost in each megawatt-hour, in US dollars

**P**
: the fuel price, in US dollars a million Btu

**3.412**
: million Btu in one MWh of electricity (3,412 Btu a kWh)

**η**
: the plant's efficiency, a fraction

**In plain words.** A unit of electricity holds a fixed amount of energy. A less efficient plant has to burn more gas to make it. Multiply the gas needed by its price and you have the fuel bill for that unit.

**Worked example.** P = 28.595 dollars a million Btu, the Platts West India Marker LNG price for October cargoes, assessed on 15 September 2026 ^[20]: a one-day spot price, not a forecast. η = 0.60 (assumption: between the US fleet's 44% ^[15]^[16] and the best plants' 64% ^[4]). F = 28.595 × 3.412 ÷ 0.60 = 162.6 dollars a MWh of fuel alone (calculated) ^[17]. This shows only the scale of imported fuel at that day's price; it is not compared with the regulated rupee charges above, which rest on long-term prices.

6.  6 Resources and rules Soft limit

**What it gives.** A gas supply, from wells or LNG terminals through pipelines, and a place on the grid.

**The idea.** India has about 25 GW of gas-based plants, and power uses only about 12% of the country's gas ^[20]. In the year to March 2025 the fleet ran at 14.5% of capacity and about 5 GW was phased out as idle ^[19].

**The limit.** Gas supply: output from the KG D6 field peaked at 55.9 million cubic metres a day in the fiscal year 2011 and fell to 0.9 million in 2019, leaving plants without fuel ^[19].

**What could unlock it.** The plants already exist, so the gain from supply is in using them, not in building more ^[19]^[20].

Show the maths U = G × 8,760 × CF

**U**
: the electricity the fleet makes in a year, in MWh

**G**
: the fleet's size, in megawatts

**8,760**
: hours in a year

**CF**
: the share of the year the fleet runs at full power, as a fraction

**In plain words.** Take the size of the fleet and the hours in a year. That is the most it could make. Multiply by the share of the time it really runs, and you see how much is going to waste.

**Worked example.** G = 25,000 MW ^[20]; CF = 0.145 ^[19] (a utilisation figure for a fleet that was 25.2 GW before the clearing out). U = 25,000 × 8,760 × 0.145 = 31.8 million MWh, or 31.8 TWh (calculated). At CF = 0.50 (assumption) it would be 109.5 TWh.

as of 2026-11-23

#### Sources

1. [GE HA Turbine Snags Another World Record for CCGT Efficiency](https://www.powermag.com/ge-ha-turbine-snags-another-world-record-for-ccgt-efficiency) POWER Magazine, 2018
2. [M501J series gas turbine specifications](https://power.mhi.com/products/gasturbines/lineup/m501j) Mitsubishi Power, 2026
3. [Carnot's Perfect Heat Engine: The Second Law of Thermodynamics Restated (College Physics 2e, section 15.4)](https://openstax.org/books/college-physics-2e/pages/15-4-carnots-perfect-heat-engine-the-second-law-of-thermodynamics-restated) OpenStax, 2022
4. [Unified Engineering thermodynamics notes: the Brayton cycle](https://web.mit.edu/16.unified/www/FALL/thermodynamics/notes/node47.html) MIT Department of Aeronautics and Astronautics, 2005
5. [Combined cycle technologies (CC_Techno)](https://direns.minesparis.psl.eu/Sites/Thopt/en/res/CC_Techno.pdf) MINES Paris - PSL, Centre Efficacite energetique des systemes, 2015
6. [Cutting-Edge Elemental Technology Producing 1600°C Class J Gas Turbines](https://power.mhi.com/products/gasturbines/technology/steam-cooled-combustor) Mitsubishi Heavy Industries (Mitsubishi Power), 2026
7. [What is the efficiency of different types of power plants?](https://www.eia.gov/tools/faqs/faq.php?id=107&t=3) U.S. Energy Information Administration, 2025
8. [Electric Power Annual, Table 8.1: Average Operating Heat Rate for Selected Energy Sources, 2015 through 2025](https://www.eia.gov/electricity/annual/html/epa_08_01.html) US Energy Information Administration, 2026
9. [Equations and Variables in the ATB (2024)](https://atb.nrel.gov/electricity/2024/equations_&_variables) NREL, 2024
10. [GE Vernova gas turbine backlog hits 116 GW as power orders more than double](https://www.turbomachinerymag.com/view/ge-vernova-gas-turbine-backlog-hits-116-gw-as-power-orders-more-than-double) Turbomachinery International, 2026
11. [India shrinks its gas fleet as idle plants become unusable](https://www.deccanherald.com/amp/story/india%2Findia-shrinks-its-gas-fleet-as-idle-plants-become-unusable-3548996) Deccan Herald (Bloomberg), 2025
12. [Gastech 2026: India's power sector likely to absorb more LNG as prices stabilize](https://www.spglobal.com/energy/en/news-research/latest-news/lng/091526-gastech-2026-indias-power-sector-likely-to-absorb-more-lng-as-prices-stabilize) S&P Global Energy, 2026
13. [Order in Petition No. 39/GT/2025: Agartala Gas Based Power Station (NEEPCO), tariff 2024-29](https://cercind.gov.in/2026/orders/39.pdf) Central Electricity Regulatory Commission, 2026
14. [CERC (Terms and Conditions of Tariff) Regulations, 2024](https://www.cercind.gov.in/regulations/notification-2024.pdf) Central Electricity Regulatory Commission, 2024
15. [Order in Petition No. 647/GT/2025: Singrauli Super Thermal Power Station (NTPC), tariff 2024-29](https://cercind.gov.in/2026/Orders/647-GT-2025.pdf) Central Electricity Regulatory Commission, 2026
16. [Order in Petition No. 702/GT/2025: Tanda Thermal Power Station Stage-I (NTPC), tariff 2024-25](https://cercind.gov.in/2026/orders/702-GT-2025.pdf) Central Electricity Regulatory Commission, 2026

## Other sections

- [Summary](https://www.materialinsights.org/technologies/e_gas_turbines/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_gas_turbines/overview/index.md)
- [Correlation](https://www.materialinsights.org/technologies/e_gas_turbines/correlation/index.md)
- [Science and limits](https://www.materialinsights.org/technologies/e_gas_turbines/science/index.md)
- [Value chain](https://www.materialinsights.org/technologies/e_gas_turbines/valuechain/index.md)
- [Unit economics](https://www.materialinsights.org/technologies/e_gas_turbines/economics/index.md)
- [Engineering methods](https://www.materialinsights.org/technologies/e_gas_turbines/methods/index.md)
- [Equipment and suppliers](https://www.materialinsights.org/technologies/e_gas_turbines/equipment/index.md)
- [Overview](https://www.materialinsights.org/technologies/e_gas_turbines/tech-overview/index.md)
- [Science](https://www.materialinsights.org/technologies/e_gas_turbines/tech-science/index.md)
- [Evolution](https://www.materialinsights.org/technologies/e_gas_turbines/tech-evolution/index.md)
- [Materials](https://www.materialinsights.org/technologies/e_gas_turbines/tech-materials/index.md)
- [Energy footprint](https://www.materialinsights.org/technologies/e_gas_turbines/tech-energy-footprint/index.md)
- [Industries](https://www.materialinsights.org/technologies/e_gas_turbines/tech-industries/index.md)