Data centres: Equipment and suppliers
Inside a rack holding 72 GPUs and drawing 132 kW
What this tab covers For each method, the main pieces of equipment, who makes them (by region) and what they are made of (bill of materials).The critical equipment falls into power (UPS, power supplies), cooling (chillers, coolant distribution units) and IT (servers and accelerators).
Power path
UPS and power distribution615Keeps power clean and continuous; batteries bridge the gap until generators start
United States Vertiv, Eaton Europe Schneider Electric, LegrandBill of materials
- Rectifier and inverter: IGBT power modules, magnetics and capacitors
- Batteries: VRLA lead-acid or lithium-ion
- Enclosure: Steel cabinets, copper busbars
Converts AC to the DC used by the server
United States Bel FuseBill of materials
- Power stage: Silicon, silicon carbide or gallium nitride transistors
- Magnetics: Ferrite transformers and inductors, copper
Cooling
Coolant distribution unit (CDU), cold plates and heat rejection1215Pump coolant to chips, exchange heat with facility water and reject it outdoors
United States Vertiv Europe Schneider ElectricBill of materials
- Cold plates: Copper with micro-channels
- Pumps and plate heat exchanger: Stainless steel
- Fluid: Water, often with propylene glycol
IT equipment
AI accelerator rack (for example GB200 NVL72)91113Runs AI training and inference; 72 GPUs and 36 CPUs in one liquid-cooled rack
United States Nvidia, AMD, Dell Technologies, Supermicro China IEIT Systems, LenovoBill of materials
- GPU packages: Silicon logic dies plus stacked high-bandwidth memory on a silicon interposer
- Interconnect: Copper cable spine and switches
- Power shelf: Rack-level AC-DC supplies feeding a DC busbar
Run cloud, web and enterprise workloads
United States Dell Technologies, HPE, Supermicro China Lenovo, IEIT SystemsBill of materials
- Processors: CPUs with 150-350 W design power
- Memory and storage: DRAM and flash
- Board and chassis: Printed circuit board, steel chassis, fans
Sources
- Data Centers and Their Energy Consumption: Frequently Asked Questions (R48646) US Congressional Research Service, 2025
- 80 PLUS: why you need Titanium power supplies in your data center (white paper restating the 80 PLUS thresholds) Bel Fuse, 2023
- Liebert EXL S1 UPS (product page) Vertiv, 2025
- Worldwide server market revenue increased 61% during the third quarter of 2025 IDC, 2025
- NVIDIA GB200 NVL72 (specifications) Nvidia, 2025
- Vertiv and Nvidia collaborate on 7MW reference architecture for GB200 NVL72 DatacenterDynamics, 2024
- Gartner says worldwide semiconductor revenue grew 21% in 2025 Gartner, 2026
- Data center physical infrastructure grew 17 percent Y/Y in 1Q 2025 Dell'Oro Group, 2025