What this tab covers The natural resources (land, water, materials, fuel or feedstock) and the labour needed to capture this energy, per unit, with the reason each is needed.

The main inputs are drilling (steel casing, cement, diesel), a modest land area and cooling water. Labour peaks during drilling and construction.

Natural resources

ResourceHow muchWhy it is needed
WellsAbout 21 wells (15 production, 6 injection) for a 50 MW flash plant; 4 for a 10 MW binary plant8Each well delivers a limited flow of hot fluid; spent fluid must be reinjected to sustain pressure.
Steel and cement (surface pipelines)769 t steel and 769 t cement for 50 MW flash, about 15 t each per MW (calculated)8Insulated pipes carry fluid between wells and plant; wells are lined with steel casing cemented in place.
DieselAbout 145,000 gallons for pipeline construction, 50 MW flash8Drilling rigs and construction equipment.
LandAbout 404 m2 per GWh over 30 years, against 3,632 m2 for coal9Well pads, pipelines and plant; directional drilling shares pads.
Fresh waterAbout 5 gallons (19 litres) per MWh; air-cooled binary none. The Geysers: 1,400 gallons per MWh consumed89Evaporative cooling and reservoir top-up.

Labour

PhaseHow muchSkillsWhy it is needed
Exploration and drilling11-22 people exploring and 91-116 drilling for a 50 MW plant10Geologists, geophysicists, drilling engineers, rig hands, mud loggersFinding and proving the reservoir is the riskiest, most labour-heavy step.
Manufacturing3.3-3.9 person-years per MW10Turbine, heat-exchanger and pipe manufacturePlant equipment is custom-matched to the fluid.
Construction3.1-6.8 person-years per MW10Welders, steel erectors, concrete placers, project managersPlants, pipelines and pads are built on site.
Operation0.36-0.7 jobs per MW10Plant operators, technicians, reservoir engineersPlants run around the clock; wells need workovers.
All phases161,000 geothermal jobs worldwide in 202411Many transferable from oil and gasDirect employment in geothermal power only.

Sources

  1. Life-Cycle Analysis of Geothermal Technologies (Wang, Clark and Sullivan, Argonne National Laboratory, GTP peer review) US DOE, 2010
  2. A Guide to Geothermal Energy and the Environment Geothermal Energy Association, 2007
  3. GEOELEC Employment study, Deliverable 5.1 (Schütz et al.) GFZ Potsdam / APPA, 2013
  4. Renewable Energy and Jobs: Annual Review 2025, Table 1 IRENA and ILO, 2026