Watch terminal send-out, cold capture and liquid air's debut What this tab covers The attributes worth tracking regularly, with the latest value, the direction of travel and why each matters.

Track terminal send-out, the share of cold actually used, and LAES costs.

CategoryAttributeLatestTrendWhy it matters
OperationalCapacity factor and operating hoursDahej 22.5 Mtpa nameplate from 31 March 2026 (was 17.5); cold follows send-out6↕ volatile Cold supply rises and falls with LNG imports.
OperationalThermal efficiency or COP over time (cold capture share)Japan about 25% (2016 report); Senboku 1 reported 100%3→ stable Shows how much available cold is put to work.
CounterpartyHost counterparty credit and utilisation rateTerminal operators are mostly strong state-linked credits6→ stable Utilisation, not default, is the main risk.
Impactt CO2e avoided per dollar investedNo project-level figure sourced; India grid average 0.727 t CO2/MWh (FY2023-24) sets the value of electricity saved11↗ improving Higher on coal-heavy grids.
OperationalHeat exchanger fouling and cleaning frequencyLow on the LNG side; seawater side of open-rack vaporisers subject to marine fouling (not quantified in the sources)1→ stable Ice formation and marine fouling set maintenance.
PolicyLocal carbon pricing and penaltiesEU ETS EUR 82-88/t in October 2026 (82.40 on 5 Oct, 88.3 on 12 Oct); India's CCTS covers seven industrial sectors (about 490 entities) from FY2025-26, not LNG terminals91213↕ volatile Carbon cost feeds into power prices, which set the value of electricity saved by using cold.
Technology-specificLAES round-trip efficiencyStandalone about 50-60%; hybrid about 50-90% (2025 review)4↗ improving LNG integration is the main route to higher efficiency.
Technology-specificLAES first commercial plantCarrington 50 MW/300 MWh, due to commission in 2026 (first scheduled early 2026); no confirmation of commercial operation found by November 2026. Liquid air absent from Ofgem's June 2026 cap-and-floor shortlist5810↕ volatile First real cost and performance data.

Sources

  1. LNG cold energy utilization: Prospects and challenges (He, Chong, Zheng, Ju, Linga), Energy 170: 557-568 Elsevier (via RePEc IDEAS), 2019
  2. Cold energy extracts value from the LNG supply chain (trade report, 2016) Riviera Maritime Media, 2016
  3. Liquid air energy storage: A critical review (She et al.), Renewable and Sustainable Energy Reviews 208 Elsevier (via RePEc IDEAS), 2025
  4. Energy stored as liquefied air: GBP 300m investment triggers construction of UK's first commercial-scale plant The Chemical Engineer (IChemE), 2024
  5. Petronet LNG Limited Dahej Terminal Capacity Expands to 22.5 MMTPA Tank Terminals (relaying Petronet LNG announcement), 2026
  6. Energy storage innovation powers Highview scale-up UK Research and Innovation, 2025
  7. European carbon prices drop to 7-week low as market eyes upcoming policy agenda S&P Global Commodity Insights, 2026
  8. Ofgem boosts long duration storage to secure more homegrown energy for customers Ofgem, 2026
  9. CO2 Baseline Database for the Indian Power Sector, User Guide Version 20.0 Central Electricity Authority, 2024
  10. European carbon prices rose to EUR 88/t in October GMK Center (ICE data), 2026
  11. Compliance obligations under India's Carbon Credit Trading Scheme enter force for seven sectors ICAP, 2026