Cargo ship: Bill of materials

About these figures

Which unit, study and year the composition figures describe, and how they vary

Per cargo ship. The reference is a 73,000 dwt bulk carrier built in Korea in 1997, with 11,400 t of steel [5]. A 2025 study gives lightweights of 29,800 t (200,000 dwt bulker) and 35,300 t (20,000 TEU ship, about 0.5% aluminium) but its material tables could not be read, so no Capesize or container steel tonnage is given [4]. The main engine (369 t, 7S60 type [13]) and propeller are not yet nodes. No tanker composition source was found.

as of 2026-11-16

Direct materials

The commodities and chemicals in one unit as bought, with amount, mass share, cost share and recycled content

Variant Bulk carrier
MaterialRoleAmount in one unitShare of the unit's mass
St SteelStructural11.4 million kg–
The 73,000 dwt reference ship: the study sets construction steel equal to its light displacement of 11,400 t, allowing for about 10% steel lost in cutting [5]. In a 2025 study, hull structure steel is about 45% to 55% of a ship's adjusted lightweight, deck structures 15% to 20% and internal and outfitting steel with piping 20% to 25% [4].
Pnt Paints and coatingsFunctionalNot given –
Coatings, copper and brass, and machinery and outfitting together are the remaining 10% to 15% of lightweight; the paper does not split them [4]. Hull anti-fouling paint has been bound by the AFS convention since 2008 [31].

as of 2026-11-16

How it is put together

The main steps from parts and materials to the finished unit

StepWhat happensSource
Cut steelConstruction starts when a gas flame cuts the first steel plate.[34]
Assemble blocks and paintCut steel is assembled into large blocks; the painting team then coats the hull and internal tanks.[34]
Erect in dockThe first block is lowered into the dry dock (keel laying); more blocks are added, the main engine is installed and cables are laid.[34]
LaunchThe dry dock is flooded; the ship lifts off its supports and tugs move it to the outfitting quay.[34]
OutfitEquipment, accommodation and systems are fitted at the quay before delivery to the owner.[34]

as of 2026-11-16

Technologies used to make it

The technologies used to make it, at which step

Made with

as of 2026-11-16

Technologies inside it

The technologies inside the product, with how much of each per unit

Embodies

as of 2026-11-16

Sources

  1. Life Cycle Assessment of Shipbuilding Materials and Potential Exposure Under the EU CBAM: Scenario-Based Assessment and Strategic Responses Journal of Marine Science and Engineering (MDPI), 2025
  2. Greenhouse Gas Emissions of a Cargo Ship from a Life Cycle Perspective International Journal of Environmental Science and Development, 2020
  3. Marine engine programme 2019, 2nd edition MAN Energy Solutions (hosted by Korindo Energy), 2019
  4. Vessel review: Mount Lhotse, Capesize bulker for Pacific iron ore and coal trades Baird Maritime, 2026
  5. International Convention on the Control of Harmful Anti-fouling Systems on Ships (AFS) International Maritime Organization, 2023
  6. From steel to sea: a shipbuilding from A to Z (text by Maersk) Hellenic Shipping News, 2025