Clay bricks are building blocks of clay, sand and water that are shaped, dried and fired in a kiln at about 1000 to 1100 degrees Celsius [17], then laid in walls with mortar. This file covers fired building bricks of ceramic (HS 6904.10); roof tiles, refractory bricks and unfired mud brick are left out. The functional unit is 1,000 bricks. Per-1,000 figures assume 3 kg per brick, the typical solid brick of northern India [3]; figures per kg or per tonne are converted at that mass (calculated).

as of 2026-11-16

How it works

How it does its job, step by step in plain words

Clay is dug, weathered and mixed with water and sand, and sometimes with sawdust or husk that burns out and leaves pores [10]. The mix is moulded, or pressed through a die and cut by wire into bricks [17]. Green bricks dry for hours to days [16][17]. Firing then drives off the last water and fuses the clay grains into a hard, water-resistant ceramic. In an Indian fixed chimney kiln the fire creeps round a ring of stacked bricks at 6 to 10 metres a day [1]; in a tunnel kiln the bricks ride through a fixed hot zone on cars. Cooled bricks are sorted by strength class and laid so that the wall carries load by compression.

as of 2026-11-16

Key specifications

The numbers that describe it, each with unit, variant, year and source

SpecValueUnitVariantYearSource
Mass of one solid fired brick, northern India3kg– 2022[3]
Mass range of Wienerberger clay brick products (Finnish declaration; kiln type not stated)0.6 to 4.0kg per brickTunnel2025[9]
Standard modular size of common building brick (length x width x height)190 x 90 x 90mm– 1992[12]
Usual UK brick size since 1965 (length x width x height)215 x 102.5 x 65mm– 2026[25]
Minimum average compressive strength, classes in IS 10773.5 to 35N/mm2– 1992[12]
Maximum water absorption, classes up to 12.520% by weight– 1992[12]
Brick earth assumed per solid brick (BEE assumption)3kg– 2022[3]
Output of one large kiln4 to 8 millionbricks per yearFixed chimney2012[1]
Output of one kiln4 to 6 millionbricks per yearZigzag2012[1]
Mass of fired brick per m3 of wall1800kg– 2025[4]

as of 2026-11-16

Variants

The variants whose make-up or footprint differs a lot, what defines each and its share of units

VariantDefining specShareYearSource
Fixed chimneyFixed chimney Bull's Trench kiln, the common South Asian route: coal-fired, 27 to 30 m chimney, 0.5 to 1 million bricks in the circuit; about 1.2 to 1.3 MJ per kg of brick [1][3]. Fixed chimney kilns made 70% of India's bricks in the survey behind the World Bank study, 45 to 50% in the BEE mapping [2][3]702020[2][3][1]
ZigzagSame bricks fired in a zigzag kiln, where air is forced along a zigzag path through the stack; about 1.1 MJ per kg [1][3]. Zigzag, vertical shaft and Hoffmann kilns together were under 5% of Indian output [2]; required for new kilns in India since 2022 [13]– 2020[1][3][2][13]
TunnelExtruded brick fired on cars in a continuous tunnel kiln, mostly on natural gas, the usual industrial route in Europe and the US; about 1.4 to 1.9 MJ per kg in the figures found (calculated) [3][9][10]. The European declarations used here do not name the kiln type. Tunnel and hybrid Hoffmann kilns had under 1% share in India, Bangladesh and Nepal [2]; the tunnel kiln is the most common type in the US [16]– 2025[3][9][10][2][16]

as of 2026-11-16. Shares are of Indian output, not world units: no source gives world shares by kiln type. The survey figure of 70% [2] and the BEE figure of 45 to 50% [3] differ in method; the first is used.

Limits

The physical limits set by science and the engineering limits of today's design, with today's value

LimitKindLimitTodayUnitSource
Clay must be fired to vitrify; the vitrification stage runs well above 870 degrees CelsiusPhysical8711000degrees Celsius (vitrification stage 871 to 1316; Wienerberger fires at 1000 to 1100)[16][17]
Process (non-fuel) CO2 stays however clean the fuelPhysical2626% of total emissions from Dutch ceramic plants (average)[11]
Lowest measured energy to fire a kilogram of brickEngineering0.541.22MJ per kg (best VSBK, Vietnam) against 1.22 for a fixed chimney kiln[1]
Water absorption allowed by IS 1077 for classes up to 12.5 (15% for higher classes)Engineering20– % by weight[12]
Drying and firing share the heat billEngineering– 50% of thermal energy used for firing, roughly 50 to 50 with drying (Dutch plants)[11]

as of 2026-11-16

Science it relies on

The science principles it works by or is limited by

Relies on
  • Combustion chemistry Coal, gas or biomass is burnt in the kiln to heat the stack to about 1000 degrees Celsius [17].
Limited by

as of 2026-11-16

Sources

  1. Brick Kilns Performance Assessment: A Roadmap for Cleaner Brick Production in India Greentech Knowledge Solutions, Enzen Global Solutions, University of Illinois at Urbana-Champaign, Clean Air Task Force and Entec (copy hosted by Clean Air Task Force), 2012
  2. Dirty Stacks, High Stakes: An Overview of Brick Sector in South Asia World Bank (Eil, Li, Baral, Saikawa), 2020
  3. Energy and Resource Mapping of MSME Brick Sector: Brick Sector Report Bureau of Energy Efficiency, India (prepared by Enzen Global Solutions and Greentech Knowledge Solutions), 2022
  4. Greenhouse Gas Emissions and Decarbonization Potential of Global Fired Clay Brick Production Environmental Science & Technology 59, 1909-1920 (Olsson, Hafez, Miller, Scrivener), White Rose repository, 2025
  5. Climate Product Declaration: Wienerberger Clay bricks, Group A (Koria, Finland) Rakennustieto (programme operator), for Wienerberger Oy Ab, 2025
  6. EPD Hub declaration HUB-6891: Leiertherm fired clay bricks, plant Iasi C3 (Leier Rom) EPD Hub, 2026
  7. Decarbonisation options for the Dutch ceramic industry PBL Netherlands Environmental Assessment Agency and TNO EnergieTransitie (Besier, Marsidi), 2020
  8. IS 1077:1992 Common Burnt Clay Building Bricks: Specification (fifth revision, reaffirmed 2002) Bureau of Indian Standards (copy on law.resource.org), 1992
  9. Environment (Protection) Amendment Rules, 2022 (G.S.R. 143(E), 22 February 2022) Ministry of Environment, Forest and Climate Change; text reproduced as Annexure 1 to a reply affidavit before the National Green Tribunal (OA 86 of 2024), 2022
  10. Manufacturing of Brick (Technical Notes on Brick Construction 9) Brick Industry Association (US), 2006
  11. How are bricks made? Wienerberger UK, 2023