Concentrated solar power: Resources and labour
Steel, glass, salt, land and surprising amounts of water
CSP needs strong direct sunlight, about 2 hectares per MW, large amounts of steel, glass, concrete and nitrate salt, and, unless dry-cooled, as much water per MWh as a coal plant. It employs more people per MW than PV.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Land and direct sunlight | About 2 ha per MW for troughs, towers and Fresnel, 1-1.5 ha for dishes; best sites (over 2,800 kWh/m2 a year of direct sunlight) yield 100-130 GWh per km2 a year1 | Only direct-beam light can be focused, and mirrors are spaced to avoid shading. |
| Water | Wet-cooled troughs median 906 gallons per MWh (3.4 m3, calculated), towers 786; dry-cooled 26-78; coal about 68751 | The steam cycle must reject heat. Dry cooling uses about 10% of the water but costs about 10% more and loses about 7% of output. |
| Steel | About 340 t per MW net for a 110 MW tower with 17.5 hours of storage, about 100 t without storage (calculated)10 | Heliostat frames, tower, tanks, pipework and receiver tubes. |
| Concrete | About 1,100 m3 per MW for the same tower plant (calculated)10 | Foundations for thousands of heliostats, the tower, tanks and buildings. |
| Glass | About 100 t of coated mirror glass per MW (calculated)10 | Silvered glass mirrors reflect sunlight onto the receiver. |
| Nitrate salt | About 56,000 t for the same plant (about 510 t per MW, calculated)10 | Sodium and potassium nitrate stays liquid at receiver temperatures (up to about 565 C), storing heat cheaply for many hours. |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| All phases | About 8-10 jobs per MW; 126,000 CSP jobs worldwide in 2024, 107,000 in China111 | Mechanical, civil and electrical engineers, welders, plant operators | Each plant is a bespoke thermal power station with many moving mirrors. |
| Construction | About 500 workers for a 50 MW plant1 | Civil works, steel erection, mirror assembly, pipework | Thousands of mirrors and kilometres of pipe are assembled and aligned on site. |
| Operation and maintenance | About 30-40 staff for a 50 MW plant1 | Operators, maintenance technicians, mirror-cleaning crews | Turbine and salt systems need constant supervision; mirrors need cleaning. |
| Decommissioning | No figure; Ivanpah's planned 2026 closure will be one of the first large retirements4 | Demolition and recycling of steel, glass and salt | Few commercial plants have been retired. |
Sources
- Concentrating Solar Power: Technology Brief E10 IRENA and IEA-ETSAP, 2013
- Renewables 2025 Global Status Report: Concentrating solar thermal power REN21, 2025
- Operational water consumption and withdrawal factors for electricity generating technologies: a review of existing literature (Macknick et al., Environmental Research Letters 7, 045802), Tables 1 and 2 IOP Publishing (copy hosted by OpenEI), 2012
- Life Cycle Assessment (LCA) of a Concentrating Solar Power (CSP) Plant in Tower Configuration with and without Thermal Energy Storage (Gasa et al., Sustainability 13(7), 3672), Tables 1 and 2 MDPI, 2021
- Renewable Energy and Jobs: Annual Review 2025 (Table 1) IRENA and ILO, 2026