Nuclear fission reactors: Resources and labour
Lots of concrete, little fuel and decades of skilled labour
Nuclear power needs very little fuel and land per unit of energy, but a large concrete and steel structure, cooling water, enrichment services and a highly skilled workforce over a 60-plus-year life cycle.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Uranium | 68,920 tonnes U required in 2025 for 2,701.6 TWh, about 25 tonnes per TWh (calculated)4 | Only the small U-235 fraction is mainly used, so many tonnes of natural uranium are needed per tonne of fuel |
| Enrichment work | About 140,000 SWU per year for a 1,000 MWe reactor; at 50 kWh/SWU that is about 7 GWh, roughly 0.1% of output (calculated)7 | Natural uranium (0.7% U-235) must be enriched to 3-5% to sustain a chain reaction in light water |
| Concrete, steel and other infrastructure materials | 0.6-1.4 tonnes per GWh generated14 | Thick concrete containment and shielding and a steel pressure vessel contain pressure and radiation |
| Land | About 50 times less land per unit of electricity than coal15 | Fuel is extremely energy dense, so mining and plant areas are small |
| Cooling water | Median 672 US gallons per MWh consumed (cooling towers); once-through cooling withdraws 44,350 but consumes 26916 | Two-thirds of reactor heat must be rejected, usually by evaporating water |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| Construction | About 1,200 staff over a ten-year build; 12,000 labour-years per 1,000 MWe13 | Civil and nuclear engineers, welders, pipefitters, electricians, quality inspectors | Nuclear-grade construction requires certified work and extensive inspection |
| Operation | About 600 staff per year for 50 years; 30,000 labour-years per 1,000 MWe13 | Licensed reactor operators, radiation protection, maintenance | Safety rules require round-the-clock licensed crews |
| Decommissioning | About 500 staff per year for ten years; around 5,000 labour-years13 | Decontamination, remote cutting, waste packaging | Radioactive components must be dismantled safely |
| Waste management | About 80 staff over roughly 40 years; around 3,000 labour-years13 | Waste and storage specialists | Spent fuel must be cooled, monitored and eventually disposed of |
Direct jobs total about 50,000 labour-years per 1,000 MWe, rising to about 200,000 job-years including supply-chain and induced jobs.
Sources
- World Nuclear Power Reactors and Uranium Requirements (updated 16 October 2026) World Nuclear Association, 2026
- Uranium Enrichment World Nuclear Association, 2025
- Study quantifies job creation in the nuclear sector (reporting OECD NEA and IAEA, Measuring Employment Generated by the Nuclear Power Sector) World Nuclear News, 2018
- Updated Mining Footprints and Raw Material Needs for Clean Energy The Breakthrough Institute, 2024
- How does the land use of different electricity sources compare? Our World in Data, 2022
- Operational water consumption and withdrawal factors for electricity generating technologies (Macknick et al., Environmental Research Letters 7, 045802) IOP Publishing (via OpenEI), 2012