Gas pipelines and city gas: Levers

Held back most by

Economics

The network is mostly built: 27,905 km of 34,803 km authorised was operating on 31 March 2026, 80.17% [10]. Average gas supplied stayed broadly stable at 243.09 MMSCMD in 2025-26 [10], and natural gas is 6.2% of India's primary energy against a plan of 15% by 2030 [11]. PNGRB's booklet gives no utilisation percentage for the grid, so placing the limit in demand and price rather than steel is our judgement from these figures.

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the language of its physics

    What it gives. A sum for how much gas a length of pipe holds at a given pressure.

    The idea. A physical law makes pipelines work and mathematics writes it down, so the role is language. The amount of gas in a pipe is its pressure times its volume divided by R times the temperature [12].

    The limit. The sum is exact for an ideal gas; real methane at 70 bar departs from it, so it is a first estimate [12].

    What could unlock it. Nothing to unlock here; the lever is the pressure the steel can hold, which engineering sets.

    Show the maths V = nRT ÷ P
    V
    the volume of the gas, in litres
    n
    the amount of gas, in moles
    R
    the gas constant: 0.08206 litre atmospheres for each mole and kelvin
    T
    the temperature, in kelvin
    P
    the pressure, in atmospheres

    In plain words. Gas fills the space it is given. Push more into the same pipe and the pressure rises. This sum tells you how much space that gas would take if you let it out into the open air.

    Worked example. 1 km of 0.6 m pipe (assumed) has volume π × 0.3² × 1,000 = 283 m³ (calculated). At 70 bar = 69.1 atm and 288 K (both assumed) it holds n = 69.1 × 283,000 ÷ (0.08206 × 288) = 8.3 × 105 mol of ideal gas (calculated) [12].

  2. 2 Science Hard limit

    What it gives. The gas law: pressure packs more gas into the same pipe.

    The idea. At fixed temperature, the pressure times the volume is fixed for a given amount of gas [12]. The 283 m³ pipe above holds as much gas at 70 bar as about 19,500 m³ at 1 atm, about 69 times the pipe's volume (calculated, ideal gas).

    The limit. Gas density follows pressure and temperature as the gas law says, so throughput is capped by pressure and speed, not by wishing [12].

    What could unlock it. Higher pressure lines, and cooling the gas, raise the load a pipe carries.

    Show the maths PV = nRT
    P
    the pressure, in atmospheres
    V
    the volume, in litres
    n
    the amount of gas, in moles
    R
    the gas constant: 0.08206 litre atmospheres for each mole and kelvin
    T
    the temperature, in kelvin

    In plain words. Squeeze a gas to twice the pressure and it takes half the room. So a pipe at high pressure carries many times what it would carry at air pressure.

    Worked example. Using the 8.3 × 105 mol above, V at 1 atm and 288 K = 8.3 × 105 × 0.08206 × 288 ÷ 1 = 1.95 × 107 litres = 19,500 m³ (calculated) [12]. The ratio to the pipe is 19,500 ÷ 283 = 69 (calculated).

  3. 3 Engineering Soft limit

    What it gives. Steel pipe, compressors and valves that hold pressure for decades.

    The idea. The authorised national grid is 34,803 km, of which 27,905 km was operating on 31 March 2026 [10]. Average supply was 243.09 MMSCMD over 2025-26 [10].

    The limit. The pressure the steel wall holds and the work of compressors to push gas along.

    What could unlock it. Not sourced here: in our judgement, larger diameter and higher-grade steel raise capacity.

    OGw Conventional oil and gas production

  4. 4 Production Soft limit

    What it gives. Kilometres of pipe laid at a cost and a pace.

    The idea. The operating share of the authorised grid was 80.17% on 31 March 2026 [10]. City networks laid 3.29 lakh inch-km against a pro-rata target of 4.05 lakh [13], about 81% (calculated).

    The limit. Contractor capacity, pipe supply and right-of-way approvals.

    What could unlock it. No sourced unlock found.

  5. 5 Economics Soft limit Binds most today

    What it gives. A tariff and a gas price that users will pay.

    The idea. A pipeline is capital repaid by the gas it carries, and the recovery factor sets the yearly charge [14]. Average supply was broadly stable at 243.09 MMSCMD in 2025-26 [10]; PNGRB gives no utilisation figure, so how full the pipes are is not stated here.

    The limit. Demand at a price: cheaper fuels and electricity compete for the same users.

    What could unlock it. Cheaper finance, more city gas demand and wider use of gas in industry; no price figure is given here.

    LPG CNG, LPG and biogas distributionLNG LNG chain

    Show the maths CRF = i(1 + i)n ÷ [(1 + i)n - 1]
    CRF
    the capital recovery factor, a fraction of the price paid each year
    i
    the interest rate, as a fraction
    n
    the number of years

    In plain words. If you borrow to build something, you pay it back in equal yearly parts. This number says what share of the price you pay each year. A higher rate or a shorter life makes it larger.

    Worked example. At i = 0.10 and n = 20 (both assumed), (1.10)20 = 6.727, so CRF = 0.10 × 6.727 ÷ (6.727 - 1) = 0.117 (calculated) [14].

  6. 6 Resources and rules Soft limit

    What it gives. Gas to put in the pipe and permission to lay it.

    The idea. Natural gas is 6.2% of India's primary energy, with a plan for 15% by 2030 [11].

    The limit. Gas supply, land access and permits, set by governments, not by the technology.

    What could unlock it. Faster approvals and domestic supply; no figure is given.

as of 2026-11-23

Sources

  1. PNGRB Statistical Booklet, September 2026 Petroleum and Natural Gas Regulatory Board, 2026
  2. Demands for Grants 2026-27 Analysis: Petroleum and Natural Gas (4 February 2026) PRS Legislative Research, 2026
  3. Relating Pressure, Volume, Amount, and Temperature: The Ideal Gas Law (Chemistry 2e, section 9.2, undated) OpenStax, 2026
  4. City Gas Distribution MIS Report, month of June 2026 (data as on 30 June 2026) Petroleum and Natural Gas Regulatory Board (PNGRB), 2026
  5. Simple levelized cost of energy (LCOE) calculator documentation National Laboratory of the Rockies (formerly NREL), US Department of Energy, 2026