Used by- Utilities, transmission companies and renewables developers Own and run transmission grids Grid owners such as Hydro-Québec, which built the first 735 kV system [4], buy and operate the lines.
- Power and distribution transformer makers Step-up and step-down transformers Large power transformers can take up to four years to procure, and their price rose about 75% [6].
- Copper and aluminium rod, conductor and winding-wire makers Overhead line conductors Aluminium conductors are common on overhead lines; grids used about 9 Mt of aluminium in 2020 [7].
- Substation and transmission EPC contractors Build and maintain lines Around 8 million people work building, maintaining and operating grids, and the IEA says 1.5 million more are needed by 2030 [6].
as of 2026-11-12
Sources
- Homage to a pioneer (First 735 kV AC Transmission System, 1965) IEEE Canadian Review, Spring 2006, 2006
- Building the Future Transmission Grid: executive summary IEA, 2025
- The Role of Critical Minerals in Clean Energy Transitions: Mineral requirements for clean energy transitions International Energy Agency