Natural reservoirs: Evolution
Timeline
The milestones from first idea to today
| Year | Milestone |
|---|---|
| 1915 | The first successful gas storage project is completed in Welland County, Ontario [1] |
| 1916 | Storage begins in the Zoar field near Buffalo, New York [1] |
| 2000 | Cushion gas reaches 61% of total US storage operating capacity [2] |
| 2022 | The EU Gas Storage Regulation sets a binding target of 90% full by 1 November each year [3] |
| 2023 | The Netherlands has over 3,000 aquifer thermal energy storage systems after about 40 years of use [4] |
| 2024 | EU gas storage reaches 90%, or 1,025 TWh, ten weeks before the deadline [3] |
as of 2026-11-12
Lineage
The technologies it came from and the ones that came from it
Came before it- GP Gas pipelines and city gas Underground storage is almost as old as long-distance gas transmission lines, and fills from the pipeline network in summer [1].
- SPR Fuel stocks and strategic reserves EU law treats gas storage as a security reserve, with a binding 90% filling target by 1 November [3].
as of 2026-11-12
Sources
- Natural gas storage: background (the page shows no title) US Federal Energy Regulatory Commission (FERC)
- Current State of and Issues Concerning Underground Natural Gas Storage (Staff Report, Docket No. AD04-11-000) US Federal Energy Regulatory Commission (FERC), 2004
- EU reaches 90% gas storage target 10 weeks ahead of deadline European Commission, Directorate-General for Energy, 2024
- Drivers to allow widespread adoption of ATES systems: a reflection on 40 years experience in The Netherlands (Bloemendal, van der Schans, Beernink, Hartog and Vardon) Symposium on Energy Geotechnics 2023, TU Delft OPEN Publishing, 2023