| 1991 | Vindeby, the first offshore wind farm, with eleven 450 kW turbines, is fully operational off Lolland, Denmark, on 1 September [1] |
| 2017 | Vindeby's decommissioning is completed on 7 September [1] |
| 2017 | Hywind Scotland, the first floating offshore wind farm, starts producing in October with five turbines and 30 MW [5] |
| 2018 | Offshore wind still provides only a tiny fraction of world electricity [4] |
| 2025 | 9.3 GW is connected in the year, taking world offshore capacity to 92.3 GW [2] |
as of 2026-11-11
Lineage
The technologies it came from and the ones that came from it
Came before it- WOn Onshore wind Offshore wind began by putting land-sized turbines at sea: Vindeby used eleven 450 kW machines [1].
- Cab Underground, submarine and superconducting cables Submarine cables collect and export the power; offshore wind takes nearly 40% of the copper used by wind even though it is a small share of new capacity [6].
- Gen Generators and alternators Turbines at sea mostly use permanent-magnet synchronous generators [6].
as of 2026-11-11
Sources
- Vindeby Offshore Wind Farm Tethys, Pacific Northwest National Laboratory (US Department of Energy)
- Global wind installations rise record 40% as industry charts way out of energy crisis Global Wind Energy Council, 2026, news release dated 20 April 2026, launching the Global Wind Report 2026
- Offshore Wind Outlook 2019 International Energy Agency, 2019, part of World Energy Outlook 2019; the page shows no exact date
- Hywind Scotland Equinor
- The Role of Critical Minerals in Clean Energy Transitions: Mineral requirements for clean energy transitions International Energy Agency