Waste-to-energy: Evolution
Timeline
The milestones from first idea to today
| Year | Milestone |
|---|---|
| 1873 | Manchester corporation erects a refuse furnace of the destructor kind, about this year [3] |
| 1874 | The first purpose-built refuse destructor, to Fryer's design, is said to be built in Nottingham [1][2] |
| 1876 | Alfred Fryer erects his destructor at Manchester [3] |
| 1897 | Shoreditch Electricity Generating Station and Refuse Destructor opens in London, one of the first works to make electricity from steam raised by burning rubbish [4][5] |
| 1900 | Bradford's destructor (1900) and Fulham's (1901) use their surplus power to make electricity [3] |
| 2023 | Europe has 499 waste-to-energy plants treating 101 million tonnes of residual waste [6] |
as of 2026-11-12
Lineage
The technologies it came from and the ones that came from it
Came before it- Blr Boilers, furnaces and stoves The plant burns waste as fuel in a furnace, as in any combustion heat source [7].
- ST Steam turbines and thermal power plants The steam from burning waste is sent to a turbine generator [7].
as of 2026-11-12
Sources
- First Waste-to-Energy (WtE) plant Guinness World Records
- 1874 - Furnace incinerator for refuse at Nottingham, England Wiki Sanitarc (sanitation history wiki)
- Destructors, Encyclopaedia Britannica, 11th edition (1911), article signed W. H. Ma. Wikisource mirror (kiwix), 1911
- Shoreditch Electricity and Refuse Destructor Works Grace's Guide to British Industrial History
- Shoreditch Electricity Generating Station and Refuse Destructor London Remembers
- EU Map 2023: Waste-to-Energy plants in Europe CEWEP, 2026
- Basic Information about Energy Recovery from Waste US Environmental Protection Agency