Materials it needs

The commodities and chemicals it needs per unit, its share of each one's demand and how critical each is

Needs 4
  • Stn Crushed stone criticality low Layers of broken stone form the road bed; McAdam limited the lower layer to stones no larger than 3 inches (7.5 cm) [3].
  • Agg Sand & gravel criticality low Gravel and small rock fill the lower layers; the Via Appia's trench was filled with loose gravel and small rock [1].
  • Oil Crude oil criticality medium Bitumen, the binder in most modern road surfaces, is a heavy product of oil refining.
  • Cem Cement criticality low Concrete roads and cement-bound bases use cement as the binder.

as of 2026-11-10. No source gives material amounts per km of road. The criticality ratings are a judgement, not sourced figures: aggregates are local and plentiful; bitumen depends on oil refining.

Critical materials

The materials whose supply could hold it back

  • Bitumen: almost all of it comes from refining crude oil, so road surfacing costs follow oil prices.
  • Aggregates: stone and gravel are plentiful but heavy to haul, so supply depends on quarries near the work.

as of 2026-11-10

Sources

  1. Building of the Appian Way (Research Starters, Roger B. McShane and Jeffrey L. Buller) EBSCO, 2022
  2. Wikipedia: Macadam