Material Insights · Understanding the Material World

Mobile broadband (4G and 5G): Levers

Held back most by

Economics

Radio physics sits well above today's use, and spectrum is not scarce at today's prices: 29% of the spectrum offered in 2022 went unsold (calculated from [14]). The open question is paying for networks: revenue per GB of wireless data fell from Rs 7.51 in the quarter ending March 2026 to Rs 7.13 in the quarter ending June 2026, while monthly revenue per user rose 1.19% [16]. The limit is a soft one and not close to breaking anything (judgement).

The six layers

Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it

Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.

  1. 1 Mathematics Hard limit

    Mathematics is the technology

    What it gives. The mathematics of coding and capacity that tells engineers how close to the limit a design is.

    The idea. Role: foundation. The working part of 4G and 5G is mathematical: signal coding that squeezes many bits into each hertz of radio spectrum (judgement). Shannon and Hartley's result fixes the most any channel can carry [11].

    The limit. Capacity rises in proportion to bandwidth but only with the logarithm of signal to noise [11].

    What could unlock it. ITU's 5G requirement of 30 bit /s/Hz peak downlink [13] would need a signal 90 above noise on a single stream (calculated), so networks add antennas and send several streams in the same spectrum (judgement).

    Show the maths C = B log2(1 + S/N)
    C
    the most data the channel can carry, in bits a second
    B
    the width of the channel, in hertz
    S/N
    signal power divided by noise power, a plain ratio
    log2
    the base-2 logarithm: how many times you can halve a number

    In plain words. A radio channel is a pipe. A wider pipe carries more. A cleaner signal carries more too, but doubling the clean signal adds only one more bit for every hertz. That is why phone networks hunt for more spectrum and more antennas.

    Worked example. A 20 MHz channel (assumed) with signal 100 times the noise, 20 dB (assumed): 20,000,000 × log2(101) = 20,000,000 × 6.658 = 133.2 Mbit/s, or 6.66 bit/s/Hz (calculated) [11].

  2. 2 Science Hard limit

    What it gives. Radio waves carry data through walls and air, but they spread and fade, and higher frequencies fade faster.

    The idea. The signal weakens with distance and with frequency [12]. The wide, empty bands that give the most speed lie at higher frequencies, where the loss is larger.

    The limit. Free-space loss in dB is 92.44 + 20 log10(frequency in GHz) + 20 log10(distance in km) [12].

    What could unlock it. More masts closer together, and antennas that steer a beam, win back the loss at high frequency (judgement).

    Show the maths LFS = 92.44 + 20 log10(f) + 20 log10(d)
    LFS
    the loss in decibels, dB, from spreading out
    f
    the frequency in gigahertz, GHz
    d
    the distance in kilometres, km
    log10
    the base-10 logarithm

    In plain words. A radio signal spreads out like ripples in a pond. The further it goes, the weaker it gets. Higher-pitched radio fades faster than lower-pitched radio over the same distance.

    Worked example. At 1 km (assumed), 3.5 GHz loses 92.44 + 10.88 + 0 = 103.32 dB, and 0.7 GHz loses 92.44 + (-3.10) = 89.34 dB, a difference of 13.98 dB (calculated) [12].

  3. 3 Engineering Soft limit

    What it gives. Radios, antennas and chips that pack many bits into each hertz and hold the link as users move.

    The idea. ITU's minimum requirement for 5G is a peak spectral efficiency of 30 bit/s/Hz downlink and 15 bit/s/Hz uplink, measured under ideal conditions [13].

    The limit. The figure is a peak under ideal conditions, not what a crowded cell delivers, so real networks average far lower rates per hertz (judgement).

    What could unlock it. Several antennas at each end, several streams, and wider channels lift speed without new physics (judgement).

  4. 4 Production Soft limit

    What it gives. Base stations built in large numbers at a cost the operators can carry.

    The idea. India had 5.08 lakh 5G base transceiver stations installed as on 31 October 2025, and 5G was available in 99.9% of districts, according to the 2025 year-end review [15].

    The limit. Every site needs equipment, power, a mounting and a backhaul link, so rollout speed is set by crews, supply of radios and fibre (judgement).

    What could unlock it. Wider coverage still adds sites in lower-income areas where revenue per mast is small (judgement).

  5. 5 Economics Soft limit Binds most today

    What it gives. A price people pay for data that covers the cost of masts, spectrum and upkeep.

    The idea. Monthly revenue per wireless user rose 1.19%, from Rs 184.91 in the quarter ending March 2026 to Rs 187.12 in the quarter ending June 2026 [16]. Revenue per GB of wireless data fell from Rs 7.51 to Rs 7.13 over the same two quarters, a decline of 5.07% [16]. Ericsson, a vendor, puts India's 5G subscriptions at 430 million at the end of 2025, 35 percent of mobile subscriptions, with 37 GB used a month per smartphone [18].

    The limit. Operators have paid for spectrum and masts while the price of each gigabyte falls; so far rising use has kept revenue per user growing, but returns depend on that continuing (judgement).

    What could unlock it. More users on 5G, fixed wireless access and higher-value services can raise revenue per user; none is guaranteed (judgement).

  6. 6 Resources and rules Soft limit

    What it gives. Spectrum licensed to operators, and fibre and permissions for masts.

    The idea. India's 2022 auction drew bids of Rs 1,50,173 crore, and 51,236 MHz of the 72,098 MHz offered (71%) was sold, with no bids for the 600 MHz band [14]. TRAI counted 1,107.68 million broadband subscribers, wired and wireless, at the end of September 2026 [17].

    The limit. Spectrum is limited and sold by the state; backhaul needs fibre or licensed microwave, and 46.09% of base stations were fibre-connected as of March 2025 [19].

    What could unlock it. TRAI's December 2025 recommendations set out E-band and V-band assignment for backhaul, and E-band is already licensed for backhaul [19].

    Fib Optical fibre communication

as of 2026-11-24

Sources

  1. Shannon-Hartley Theorem Wolfram MathWorld, 2026
  2. Radio propagation and line-of-sight communications, lecture notes B1 (undated) McGill University (ECSE/INFO 413), 2026
  3. Requirements for IMT-2020, workshop slides (2016) ITU Radiocommunication Sector, 2016
  4. Press release: spectrum auction 2022 concluded (2 August 2022) Press Information Bureau, Ministry of Communications, 2022
  5. 2025 Year End Review for Department of Telecommunications (19 December 2025) Press Information Bureau, Government of India, 2025
  6. Press release No. 135/2026: Indian Telecom Services Performance Indicators, April to June 2026 Telecom Regulatory Authority of India, 2026
  7. Highlights of Telecom Subscription Data at the end of September 2026 (PR No. 140/2026) Telecom Regulatory Authority of India, 2026
  8. Ericsson Mobility Report: India's 5G subscriptions to reach 1.1 billion by 2031 (16 June 2026) Ericsson, 2026
  9. Recommendations on Assignment of the Microwave Spectrum in 6 GHz (lower), 7 GHz, 13 GHz, 15 GHz, 18 GHz, 21 GHz Bands, E-Band, and V-Band Telecom Regulatory Authority of India, 2025