Nuclear-powered submarine: Evolution
Timeline
The milestones from first idea to today
| Year | Milestone |
|---|---|
| 1947 | Argonne is assigned, on 31 December, to design a submarine power plant [4] |
| 1951 | Congress authorises the world's first nuclear-powered submarine in July [1] |
| 1953 | The land-based Nautilus prototype reactor reaches criticality on 30 March [3] |
| 1954 | Nautilus is launched on 21 January and commissioned on 30 September [1] |
| 1955 | Nautilus gets under way on nuclear power on 17 January [2] |
| 1958 | Nautilus becomes the first ship to reach the geographic North Pole, on 3 August [2] |
| 2023 | The AUKUS partners announce on 13 March how Australia will get nuclear-powered submarines [8] |
as of 2026-11-12
Lineage
The technologies it came from and the ones that came from it
Came before it- Sub Military submarine Nautilus kept the submarine's role but became the first nuclear-powered one, laid down on 14 June 1952 [2].
- NFR Nuclear fission reactors Argonne designed the submarine's reactor plant with Westinghouse, an early step in reactor engineering [4].
as of 2026-11-12
Sources
- History of USS NAUTILUS (SSN 571) Naval History and Heritage Command (Submarine Force Museum)
- Nautilus IV (SSN-571) Naval History and Heritage Command (Dictionary of American Naval Fighting Ships)
- S1W (Nautilus Prototype) | NR-HA.org Naval Reactors Historical Association
- Reactors Designed by Argonne National Laboratory Argonne National Laboratory, Nuclear Engineering Division
- AUKUS Plans Announced (Kelsey Davenport) Arms Control Association (Arms Control Today), 2023