Submarine communications cable: Levers
Held back most by
Resources and rules
Fibre physics and cable engineering are mature, and cables carry about 99% of the world's internet traffic [16]. What now limits new routes and fast repair is permission to land, as in India's licensing of cable landing stations [17][21], and a repair fleet of which about two thirds will reach the end of service life by 2040 [15].
The six layers
Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it
Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.
- 1 Mathematics Hard limit
Mathematics is the language of its physics
What it gives. A way to say how many bits each fibre can carry for a given bandwidth and signal quality.
The idea. Role: language. Light in glass obeys Maxwell's physics, and Shannon's mathematics gives the ceiling on information a noisy channel can carry [20]. A 50 GHz optical channel at a signal-to-noise ratio of 15 (both assumed) can carry at most 200 billion bits a second (calculated) [20].
The limit. No coding scheme beats the capacity C of the channel [20].
What could unlock it. More light colours in each fibre and more fibre pairs in each cable raise total capacity (judgement).
Show the maths
C = B log2(1 + S/N)- C
- the most information the channel can carry, in bits a second
- B
- the bandwidth of the channel, in hertz
- S/N
- signal power divided by noise power, with no unit
In plain words. A channel is like a pipe. A wider pipe, or a clearer signal, carries more. The formula says how much more, and says the pipe can never carry more than that.
Worked example. With B = 50 × 109 Hz and S/N = 15 (both assumed): C = 50 × 109 × log2(16) = 50 × 109 × 4 = 200 × 109 bits a second (calculated) [20].
- 2 Science Hard limit
What it gives. Light held inside glass by reflection, which loses very little over long distances.
The idea. Fibre loss is lowest at wavelengths of 1500 to 1600 nm, typically about 0.2 dB per km [18]; a common single-mode figure is 0.25 dB per km at 1550 nm [19]. An 80 km stretch (assumed) at 0.2 dB per km loses 16 dB, so the light left is about one fortieth (calculated) [18].
The limit. Glass always absorbs and scatters a little light, so the signal weakens with every kilometre and needs amplifiers along a long cable (judgement).
What could unlock it. Amplifiers placed along the cable renew the signal; the loss is overcome rather than removed (judgement).
Fib Optical fibre communication
Show the maths
dB = measured power (dB) - reference power (dB)- dB
- the loss or gain, in decibels; a negative number is a loss
- measured power
- the power at the far end, in decibels relative to a unit such as a milliwatt
- reference power
- the power put in, in the same decibel unit
In plain words. Decibels add and subtract, so a long cable's loss is each piece's loss added together. A loss of 10 dB leaves one tenth of the light. A loss of 20 dB leaves one hundredth [19].
Worked example. Page example: a measured -22.3 dBm against a reference of -20 dBm gives -2.3 dB [19]. For 80 km at 0.2 dB per km (assumed): 80 × 0.2 = 16 dB lost, and 10-1.6 = 0.025, so about one fortieth of the power remains (calculated) [18].
- 3 Engineering Soft limit
What it gives. A cable that survives years on the sea floor, with amplifiers that must not fail.
The idea. Faults still happen: TeleGeography cites the International Cable Protection Committee (ICPC) figure of about 200 cable faults reported worldwide each year [15], and the ITU reports over 170 repairs in 2025, also from the ICPC [16]. Fishing and anchoring are the main cause, followed by natural hazards such as earthquakes and underwater landslides [16].
The limit. A cable lies in the sea where ships and seabed movement can break it, and every repair needs a specialist ship [15][16].
What could unlock it. Burying cables near shore, using several routes and more repair capacity (judgement).
- 4 Production Soft limit
What it gives. Thousands of kilometres of cable made, loaded on ships and laid.
The idea. Nearly 200,000 km of new submarine cables were installed in 2024 [16], and a cable can take over two years from design to operation [16].
The limit. Cable ships and factories are few, so projects queue (judgement; no source on factory capacity was opened).
What could unlock it. More cable ships and factory capacity (judgement).
- 5 Economics Soft limit
What it gives. A very large market: submarine cables carry nearly all international internet traffic.
The idea. Submarine cables carry approximately 99% of the world's Internet traffic [16], so demand for capacity is strong. No cost per kilometre was sourced for this record.
The limit. Each system costs a great deal to build and funds are raised project by project (judgement).
What could unlock it. Consortium ownership and sharing of fibre pairs spread the cost (judgement).
- 6 Resources and rules Soft limit Binds most today
What it gives. Permission to land, ships to repair, and secure ground for the shore end.
The idea. TRAI's 2023 recommendations note that 17 submarine cables land at India's cable landing stations, most of them at Mumbai and Chennai [17]. They proposed that the licensee seeking to set up a main landing station give an undertaking that it owns and controls the asset in Indian territorial waters and at the station [17]. These were recommendations: a 2026 policy paper says the Department of Telecommunications accepted key parts of them, without listing which [21]. Globally, about two thirds of cable repair ships will reach the end of their service life by 2040, and roughly $3 billion is needed to sustain current service levels [15].
The limit. Landing permissions, the licence conditions that apply to the landing station, and a small repair fleet set the pace of new routes and the speed of repairs [15][16][17].
What could unlock it. Clearer, faster permission for landing stations and more repair ships (judgement).
as of 2026-11-24
Sources
- Submarine cable maintenance data, 30 June 2025 TeleGeography, 2025
- Submarine cable resilience backgrounder (last updated April 2026) International Telecommunication Union, 2026
- Recommendations on Licensing Framework and Regulatory Mechanism for Submarine Cable Landing in India, 19 June 2023 Telecom Regulatory Authority of India, 2023
- Digital communications, section 2.3 (undated) The Open University, OpenLearn, 2026
- Decibels and testing: dB (undated) The Fiber Optic Association, 2026
- Information Theory, lecture 5: channel capacity (EL334N, undated) University of Southampton, 2026
- Navigating India's Subsea Cable Governance, 20 July 2026 Takshashila Institution, 2026