Biogas and biomethane: Production route

Wet tanks, dry digesters and the upgrade to biomethane

What this tab covers How it is made: the main production routes or, for product families, the main product types and technologies, compared on share of supply, inputs per tonne, plant scale, yield, co-products and unit cost.

Almost all biogas comes from anaerobic digestion; landfill gas capture is the other large source. Wet digesters suit manure, sewage and food waste; India's newer CBG plants use dry or high-solids digestion of paddy straw, press mud and Napier grass, which needs pre-treatment. Upgrading turns biogas into biomethane. Thermal gasification of wood or straw followed by methanation (bio-SNG) is technically proven but small.

Routes compared

RouteShare of supplyInputs per tonneTypical scaleYieldCo-productsUnit cost
Wet anaerobic digestion (manure, sewage, food waste)majority of world biogas (indicative)about 60-70 t fresh cattle dung per t of CBG (indicative, basis: about 35-40 m3 biogas per t dung)Europe's average biomethane plant 483 m3 per hour; Indian dung plants 1-10 t CBG a day (indicative)about 20-25 m3 methane per t dung; 100-150 m3 per t food waste (indicative)digestate (liquid and solid fertiliser), CO2 from upgradingIEA average biomethane cost about $36-108/MWh (about $10.5-32/MMBtu)
Dry and high-solids digestion of residues (paddy straw, press mud, Napier grass)growing share of India's new plants (indicative)about 8-10 t paddy straw, 20-25 t press mud or 25-30 t Napier grass per t CBG (indicative)10-30 t CBG a day; Adani TotalEnergies' Uttar Pradesh plant takes about 600 t of feed a day (BioEnergy Times)about 100-150 kg CBG per t dry straw (indicative)fermented organic manure (FOM)capex about Rs 120-130 crore per plant (derived: Petronet-Gruner Rs 1,200 crore for 10 plants; Reliance Rs 65,000 crore for 500 plants)
Landfill gas capturelarge in the US (indicative)not applicable (waste already in place)1,000-10,000 m3 per hour (indicative)falls over decadesnonecheapest RNG source (indicative)
Upgrading technologiesabout 5.2 bcm upgraded in Europe (2024)about 0.25-0.4 MWh electricity per 1,000 m3 raw biogas (indicative)100-5,000 m3 per hour97-99% methane recovery (indicative)biogenic CO2 (food or e-fuel grade)a few $ per MWh (indicative)

How each route works

Wet anaerobic digestion (manure, sewage, food waste)

Slurry of 5-15% solids is stirred in heated tanks; biogas is collected and upgraded or burned. Manure digesters capture methane that would otherwise leak from lagoons.

proven and carbon-negative with manure; small, dispersed feedstock

IEA Outlook for Biogas and Biomethane (May 2025), via World Biogas Association and BioCycle; European Biogas Association Statistical Report 2025, via Renewable Energy Magazine, 10 Dec 2025; indicative Dry and high-solids digestion of residues (paddy straw, press mud, Napier grass)

Lignocellulosic feed is chopped and pre-treated, then digested with recirculated slurry. This is the main design for new Indian CBG plants by Reliance, Adani TotalEnergies and IOCL.

uses residues that are otherwise burned; seasonal supply and storage costs

BioEnergy Times, Aug 2026; BioEnergy Times Oct 2026 (Petronet); indicative Landfill gas capture

Wells and pipes in closed landfills collect gas, which is burned for power or upgraded to RNG. Large in the US.

low cost; captures only part of landfill methane

indicative Upgrading technologies

Membranes, water scrubbing, PSA and amine units separate CO2; cryogenic units make bio-LNG. Methane slip from upgrading ranges from 0.2% to 10% in Europe (IEA).

turns low-value gas into grid gas; slip must be controlled

IEA Outlook for Biogas and Biomethane (May 2025), via World Biogas Association and BioCycle; European Biogas Association Statistical Report 2025, via Renewable Energy Magazine, 10 Dec 2025 Unit economics are indicative ranges from the sources named; costs move with feedstock and energy prices, plant size and region.