What this tab covers The natural resources (land, water, materials, fuel or feedstock) and the labour needed to capture this energy, per unit, with the reason each is needed.

Thermochemical plants need dry (or, for HTL, wet) biomass, hydrogen for upgrading oils, and high-temperature, pressure-rated equipment.

Natural resources

ResourceHow muchWhy it is needed
Biomass feedstockAbout 5.6-7.1 t of residue per t of Fischer-Tropsch distillate (calculated from 14-18% yield); about 1.3-1.5 t of dry wood per t of bio-oil (calculated from 65-75% yield)512Every tonne of product needs several tonnes of feedstock because part of the carbon leaves as gas, char or CO2.
LandMedian 58,000 ha per TWh a year for biomass grown for energy; about 130 ha per TWh a year from residues10Using residues avoids dedicating land to fuel; purpose-grown biomass needs large areas because plants capture sunlight thinly.
HydrogenNot quantified in the sources reviewed98Pyrolysis oils and HTL biocrude contain much oxygen, which must be removed with hydrogen to make stable transport fuel.
Capital equipment (gasifiers, gas cleaning, reactors)USD 2,500-5,500/kW for IGCC; USD 4,560-5,560/kW for gasification-FT49Equipment must withstand high temperatures, pressures and corrosive tars and acids.

Labour

PhaseHow muchSkillsWhy it is needed
ConstructionNot quantified per MW in the sources reviewed; Fischer-Tropsch plants take about 5 years to build5Process plant construction, pressure vessels, gas cleaning systemsThese are chemical plants rather than simple boilers.
OperationNot quantified in the sources reviewed4Chemical engineers, process operators, catalyst and gas-safety specialistsSyngas contains toxic carbon monoxide and tars that must be controlled continuously.

Sources

  1. Torrefaction and pyrolysis (European Industrial Bioenergy Initiative factsheet EIBI-4) ETIP Bioenergy
  2. IEA Bioenergy Update 29: Task 34 technology report on fast pyrolysis IEA Bioenergy
  3. Energy Technology Essentials ETE03: Biomass for Power Generation and CHP (2007 cost estimates) International Energy Agency (copy hosted by nachhaltigwirtschaften.at), 2007
  4. Progress in commercialisation of biojet / SAF (van Dyk, IEA Bioenergy workshop presentation) IEA Bioenergy Task 39 (hosted by DBFZ), 2023
  5. Biojet fuels: technologies and status of commercialisation (van Dyk and Saddler) IEA Bioenergy Task 39, 2020
  6. Reaching Zero with Renewables: Biojet fuels IRENA, 2021
  7. Land-use intensity of electricity production and tomorrow's energy landscape (Lovering, Swain, Blomqvist and Hernandez) PLOS ONE, 2022