What this tab covers The attributes worth tracking regularly, with the latest value, the direction of travel and why each matters.For flexibility, track enrolment and delivered performance rather than state of health. In India, watch smart-meter rollout and how states set ToD tariffs; elsewhere, watch market access for aggregators and V2G standards.
| Category | Attribute | Latest | Trend | Why it matters |
|---|---|---|---|---|
| Techno-economic | Cost of capacity versus peakers and batteries (LCOS equivalent) | About 40% below utility battery and 60% below gas peaker (US, 2030 representative utility, DOE 2023); battery projects about USD 150/kWh (2024)14 | ↗ improving | The core investment case; falling battery costs narrow the advantage. |
| Techno-economic | Enrolment and delivered performance (state of health equivalent) | About 100 GW of demand response used globally (2024) vs 500 GW net zero need by 203034 | ↗ improving | Opt-outs and fatigue erode capacity the way fade erodes a battery; growth is far behind IEA's path. |
| Supply chain | Enabling hardware cost and rollout | India: about 28% of sanctioned consumer smart meters installed (5.53 of 19.79 crore, 30 June 2026, calculated); bidirectional AC chargers under USD 1,500814 | ↗ improving | Meters and chargers, not minerals, decide how fast flexibility scales. |
| Market | Market access and ancillary saturation | 2 of 6 FERC-jurisdictional US markets admitted VPPs that inject power (Aug 2023); ancillary services historically under 5% of US wholesale value1 | ↗ improving | Wholesale access widens revenue beyond utility programmes, but ancillary pools are shallow. |
| Regulatory | Tariff design and compliance | India ToD: solar hours at least 20% cheaper; C&I peak at least 20% dearer (Rules notified 14 June 2023)5 | ↗ improving | State regulators set the actual spreads; wider spreads raise the value of shifting. |
| Regulatory | Interoperability and cybersecurity | ISO 15118-20 (2022) implemented inconsistently; interoperability very low8 | → stable | Common standards decide whether aggregators can scale across vehicle and charger brands. |
| Environmental | Emissions effect of shifted load | India curtailed about 2.3 TWh of solar (late May to Dec 2025)7 | ↘ worsening | Stands in for carbon payback: shifting into curtailed solar hours gives the clearest emissions gain. |
| Technology | V2G battery wear evidence | 1.7 to 5.8 percentage points extra loss over 10 years (cell ageing models, aggregator co-authored, 2025); warranties 70% after 8 to 10 years810 | ↗ improving | Fleet data are needed before carmakers drop throughput limits and warranty caveats. |
| Market | VPP and V2G commercial scale | 37.5 GW VPP flexible capacity in North America (2025, up 13.7%); 22 V2G-capable models; China targets 5,000 V2G facilities by end-2027816 | ↗ improving | Shows whether flexibility is moving from pilots to mass market. |
Sources
- Pathways to Commercial Liftoff: Virtual Power Plants US Department of Energy, 2023
- Demand Response (tracking page; undated, latest data early 2023) International Energy Agency, 2023
- Electricity 2026: Flexibility International Energy Agency, 2026
- Lok Sabha Unstarred Question No. 41: Power Tariff System (answer by Ministry of Power, 20 July 2023) Parliament of India, Lok Sabha, 2023
- Beyond capacity: why India's power system must get flexible (chapter: 2025 saw significant solar curtailment to preserve system stability) Ember, 2026
- Global EV Outlook 2026: Vehicle-to-grid technology International Energy Agency, 2026
- German study shows V2G has minor impact on battery degradation (trade press on a study co-authored by RWTH Aachen and the aggregator The Mobility House; not peer reviewed as far as found) New Mobility News, 2025
- Rajya Sabha Unstarred Question No. 943: Delay in smart meter installation (answer by Ministry of Power, 27 July 2026) Ministry of Power, Government of India, 2026
- Virtual power plant capacity expands 13.7% year over year to reach 37.5 GW (press release on market research) Wood Mackenzie, 2025