Material Insights · Understanding the Material World

Nuclear fuel transport: Unit economics

Costly casks and ships, but distance hardly matters

What this tab covers What it costs to move a unit of energy this way: capital and operating costs, tariffs, utilisation and how it compares with the alternatives.

Transport is a small part of the cost of nuclear electricity; the main costs are the casks, ships and security rather than distance.

Key costs

MeasureValueNote
Large Type B caskAbout 1.6 million USD each1Over 150 certified designs
Dedicated spent-fuel ship (Rossita)70 million EUR1Built for Russia's Arctic clean-up
Atlas railcar programmeAbout 33 million USD3Ten years of development, 2024
Electricity from one fresh-fuel truckloadAbout 1.75 TWh1Calculated from 4 to 5 trucks per 1,000 MWe reactor-year at 90% load
US spent fuel to move eventuallyOver 140,000 tonnes3Projected inventory by 2060, from more than 70 sites

Where the money goes

ItemShare or amount
Casks and packages (capital)Largest item; share not published1
Radioactive share of US hazmat shipping costUnder 0.5%1

Shipping prices are commercial and rarely published, so a cost per MWh cannot be given with confidence. Even a high hypothetical USD 100,000 for a fresh-fuel truck trip would add only about USD 0.06 per MWh of electricity produced (calculated), far below grid or fuel costs.

Spent fuel is costlier because casks are heavy and few, and because each programme needs bespoke railcars, ships and escorts.