Capital-intensive
Describes a technology whose cost is mostly the money spent to build it, such as solar or wind, rather than fuel or running costs.
Capital recovery factor
The yearly payment, per rupee borrowed, that repays a loan over a stated number of years at a stated rate: the rate divided by one minus (1 + rate) to the power of minus the years.
Cost of capital
The return that lenders and owners require for money put into a project; often a blend of the interest on debt and the return expected on equity.
WACC
Weighted average cost of capital: the blend of the cost of debt and the cost of equity, weighted by how much of each a project uses.
Levelised cost of electricity
The price per unit of electricity that exactly repays all the costs of a plant, including finance, over its life.
Basis point
One hundredth of a percentage point; 320 basis points is 3.2 percentage points.
Counterparty risk
The risk that the buyer of the electricity does not pay on time or in full.
Payback with interest
The time for yearly savings to repay an extra purchase price plus the interest on it; longer than the simple payback.
Flip rate
The interest rate at which the yearly cost of an extra purchase price equals its yearly saving.
Weighted average lending rate
The average interest rate on bank loans, weighted by loan size; the RBI publishes it for fresh and for outstanding rupee loans.
Exchange-rate pass-through
How a change in the rupee per dollar rate carries into the rupee price of an imported fuel or part.
Import dependence
The share of supply of a good that comes from abroad, here measured on supply after exports.
Depreciation
The wear of machines and buildings, counted as a cost of production in the industry mix.
Pay along the whole supply chain
Pay to employees in the industry and in all the industries that supply it, per ₹100 of its output.
Applied technical roles
Hands-on jobs such as electricians, pipefitters, line workers and plant operators.
Just transition
Planning that moves workers and regions away from fossil fuel jobs while protecting their livelihoods.
District Mineral Foundation
A fund in mining districts, financed by mining firms, to benefit people affected by mining.
Money card
A panel on a technology page that gives the cost of capital in India as a range with its year, the capital share of lifetime cost, and the reasons it is high or low.

Try it in the table

  • Open the What if (Analyse) financing view for the Heat pump and for the Air conditioner. Note the interest rate each starts at and why that buyer pays it. Then raise the rate with the rate control until the yearly cost with interest passes the yearly saving. That rate is the flip point for that product.
  • Open Solar photovoltaics and Onshore wind and read the Money card on each Overview. Write down each rate, whether it is a weighted cost of capital or a cost of debt, and its year. Then open Large hydropower dams, whose card shows a regulator's allowed return on equity, and explain why that number is higher than the other two and why it cannot be compared with them directly.
  • In the What if view for the Electric bus, compare its payback with and without interest at the starting rate. Move the rate control down by 3 points and then up by 3 points. How much does the payback with interest change? Use the capital recovery factor to check one of the yearly costs on paper.
  • Open the Solar PV module, Solar PV cell, Polysilicon and Silicon tiles. List which steps of the chain India imports most, using the import dependence figures in this module. Then redo the ₹100 project estimate with an assumed dollar-priced share of your own choice.
  • Open the Construction and infrastructure and Electrical equipment industry pages. In Where ₹100 of output goes, read pay to employees, depreciation and the pay line for 2000, 2010 and 2022. Decide which of the two is more exposed to wage costs and which to commodity prices, and find the Machinery and equipment figures for comparison.

Final quiz

Why is clean power often described as a finance problem?

Wind and solar have no fuel. Their cost is mainly the equipment, financed over decades, so the cost of capital drives the price.

What does the capital recovery factor calculate?

It is the rate divided by one minus (1 + rate) to the power of minus the years.

The IEA says the cost of capital can account for what share of the levelised cost of utility-scale solar?

The IEA gives 20 to 50% for utility-scale solar.

On the What if starting rates, which buyer has the widest range of interest rates?

Households run from 8.85 to 14.6% (2026), businesses from 7.46 to 10% (2026) and projects from 8.5 to 9.75% (2025).

An extra purchase price of ₹65,000 over 15 years at an illustrative 9.5% has a yearly cost of about ₹8,303. What does this mean for a lever that saves ₹10,000 a year?

The factor 0.12774 times ₹65,000 is about ₹8,303. The saving of ₹10,000 beats it by about ₹1,697.

Which pair describes the exposure of a gas plant and a solar farm to the exchange rate?

Fuel is bought repeatedly in dollars, while a solar farm's imported components are bought once.

Which statement is supported by the IEA's 2024 data on energy jobs?

The IEA reports 76 million energy workers in 2024, with power the largest employer and applied technical roles over half the total.

On the site, which is true of pay per ₹100 of output in 2022 along the whole supply chain?

The site's figures for 2022 are ₹44.9 for Construction and infrastructure and ₹23.0 for Electrical equipment.