A solar farm needs money first and people second, but without electricians, line workers and installers the money builds nothing. This part counts the world's energy workforce, looks at the skills shortage the IEA reports, sets India's renewable workforce against what it needs by 2030, and turns to the coal regions where jobs and skills will change most.
4.1 76 million people work in energy, and employers cannot find enough skilled ones
The IEA counts 76 million people employed in the world's energy sector in 2024, more than 5 million above 2019. Employment grew 2.2% in 2024, nearly twice the rate of the wider economy, and the sector provided 2.4% of all net new jobs in the past five years. The IEA expects growth to slow to 1.3% in 2025.
The power sector accounts for three-quarters of the recent growth and is now the largest energy employer, ahead of fuel supply. Coal jobs are 8% above 2019 levels, driven by rebounds in India, China and Indonesia. Jobs in electric vehicle manufacturing and batteries rose by nearly 800,000 in 2024. A transition is therefore not a story of jobs leaving one sector for another. For now, more are added in several places at once.
The constraint is skills. More than half of the 700 companies, unions and training institutions the IEA surveyed reported "critical hiring bottlenecks", in the IEA's words. The jobs in short supply are applied technical roles such as electricians, pipefitters, line workers and plant operators. These roles added 2.5 million positions since 2019 and now make up over half of the energy workforce. They are not jobs for graduates in energy economics. They need hands-on training, certificates and years of practice.
In advanced economies, the workforce is also ageing: there are 2.4 energy workers nearing retirement for every new entrant under 25. For nuclear and grid jobs the IEA gives ratios of 1.7 and 1.4 to one. The IEA says that to keep the gap from widening by 2030, the number of new qualified entrants would need to rise by 40%, at an extra $2.6 billion a year, less than 0.1% of global education spending. The main barriers to training are cost, forgone wages and low awareness of programmes.
A caution about these numbers: the 2.4 to one figure describes advanced economies, and the IEA gives no India-specific totals in this release. For India the question is less about retirements and more about the supply of trained people, where they live and whether they are certified. For a founder, hiring and training cost belongs in the plan with the cost of equipment. For a policy maker, the IEA's costing suggests that the training budget is small beside the capital being invested.
4.2 India's renewable workforce must grow about tenfold by 2030
The CEEW study with NRDC and SCGJ, reported in January 2022, estimated India's renewable energy workforce at about 110,000 people. It found that about one million people could be employed by 2030, ten times the existing workforce. It also counted the people newly employed each year: 12,400 in FY19, 5,200 in FY20 and 6,400 in FY21.
A rough pace shows the gap. Going from 110,000 to 1,000,000 means adding about 890,000 people. Taking 2021, the last year the study counts, as the start and spreading the gap over the nine years to 2030, that is about 99,000 a year (calculated). The highest of the three yearly figures was 12,400, so the required pace is about eight times the best recent year. This is a simple calculation, not a forecast. It shows that the skills pipeline would have to grow far faster than its recent speed.
The study also found that most new jobs would come from small projects, such as rooftop solar and mini and micro-grids, not from large solar parks. That matters for training. Small systems are installed across thousands of towns and villages by local firms, so the skills have to be taught widely, not at a few sites. In FY21 most new workers were in rooftop solar, which added 1.4 GW of capacity, up 9% on FY20. The Suryamitra programme trained 78,000 people from 2015 to 2017, and the study recommends training rural youth, refreshing curricula regularly and adding batteries and green hydrogen.
PLFS 2025 (usual status, calendar year 2025) gives the labour market the programme draws on. Agriculture employs 43.0% of India's workers, manufacturing 12.1% and construction 12.0%. Of all workers, 56.2% are self-employed and 23.6% hold regular wage or salaried jobs. There is no shortage of people in the sense of numbers. The question is whether farm workers, construction workers and self-employed repairers can reach training and a certificate, and whether the pay and the contract on offer make the move worthwhile.
For a founder in rooftop solar or mini-grids, trained installers and maintenance staff are as much a constraint as panel supply. For an investor, a business that includes training, such as a company that certifies and employs its installers, carries a cost but also a barrier to copying. Note the age of the study: it is from 2022, and rooftop installations have grown since, so check newer data before relying on the 2030 figure.
| Item | Figure | Source or status |
|---|---|---|
| Renewable workforce, estimated | about 110,000 | CEEW, NRDC and SCGJ study, January 2022 |
| Workforce that could be employed by 2030 | about 1,000,000 | Same study; ten times the existing workforce |
| New workers entering in FY19, FY20, FY21 | 12,400; 5,200; 6,400 | Same study |
| Average yearly addition needed, 2021 to 2030 (9 years) | about 99,000 | Calculated: (1,000,000 minus 110,000) divided by 9 |
| Required pace against best recent year (12,400) | about 8 times | Calculated |
The 2030 figure is the study's estimate of jobs that could exist, not a forecast of what will happen.
Source: CEEW, India's renewable energy sector could employ one million people by 2030 (press release on the CEEW, NRDC and SCGJ study, January 2022), https://www.ceew.in/press-releases/indias-renewable-energy-sector-employ-one-million-people-2030; Worked estimate by the course authors from the CEEW figures (gap divided by years; ratio to the best recent year), Calculated; inputs as stated in the table4.3 The coal regions: where jobs and skills will change most
Most coal jobs and most coal workers sit in a few places. The TERI report of 2024 notes that Odisha, Chhattisgarh, Jharkhand and Madhya Pradesh produced about 79% of India's coal in 2022-23, and that coal provides about 70% of the country's electricity. Coal India Limited alone employs over 270,000 people. The report gives no count of contract and informal workers, though it says many informal workers are taken on by private contractors, and for that reason no total for coal employment should be read as precise.
TERI studied seven districts: Angul, Jharsuguda and Sundargarh in Odisha, Surguja, Surajpur and Manendragarh-Chirmiri-Bharatpur in Chhattisgarh, and Dhanbad in Jharkhand, using 996 household survey respondents and 50 focus group discussions. It also notes that the coal sector provided ₹33.46 billion to District Mineral Foundation funds in 52 districts. That figure counts where money flows, not how many districts depend on coal. These districts are not just mine locations. They depend on coal for local government funds, transport, shops and services, which is why jobs are not the only thing to replace.
Two mismatches make the transition hard. The first is place. New jobs in rooftop solar and mini-grids, as the CEEW study shows, are spread across the country, while coal jobs are concentrated in a few districts. A new job in another state does not replace a lost job in Dhanbad. The second is skill. A mine worker's skills, such as operating heavy equipment or maintaining machinery, may carry over in part to utility-scale solar construction and to power plant maintenance, but less so to roof installation or software for mini-grids. The IEA's note that coal jobs rose 8% above 2019 levels shows these jobs are not vanishing now. Planning for a slow change is more useful than planning for a sudden one.
Options in discussion include siting new solar and storage projects in coal districts, retraining programmes tied to real vacancies, using district funds for skills and local business, and phasing the change over decades. Each has costs and limits, and the evidence on what works is thin. A policy maker has to ask for each option which workers it reaches: those with formal jobs in a public company, or the contract and informal workers who are harder to count.
For investors and founders, a project in a coal district may find it easier to hire people with relevant skills, and may also meet higher expectations from local government and communities. Treat that as a factor to check, not an assumption.
- TERI, Understanding the Implication of Coal Transition: The Scenario in Chhattisgarh, Jharkhand, and Odisha (2024) · web
- IEA, Energy employment has surged but growing skills shortages threaten future momentum (2025, data for 2024) · web
- CEEW, India's renewable energy sector could employ one million people by 2030 (press release on the CEEW, NRDC and SCGJ study, January 2022) · web
4.4 Reading the site: how much of each ₹100 goes to pay
The site's industry pages show a bar called Where ₹100 of output goes. It splits ₹100 of an industry's output into commodities, chemicals, energy, the industry's own value added, and other industries, services and taxes. The own value added is itself split into pay to employees, depreciation (the wear of machines and buildings) and profit, self-employed income and taxes. Two tiles under the bar show pay to employees along the whole supply chain, and depreciation. A small line shows pay per ₹100 in 2000, 2010 and 2022. The source is the OECD input-output table for India.
The industries that build and equip energy projects show very different mixes. In Construction and infrastructure, ₹33.3 of each ₹100 goes to pay inside the industry, ₹3.7 to depreciation and ₹10.2 to profit, self-employed income and taxes. In Electrical equipment, pay is only ₹5.2, depreciation ₹3.5 and the remainder ₹11.7, while commodities take ₹16.9. In Machinery and equipment, pay is ₹7.1. So a rupee spent on site work, such as foundations, trenching and erecting structures, carries far more pay than a rupee spent on the equipment that goes into the plant.
The chain figure widens the view. For each ₹100 of output, pay along the whole supply chain was ₹44.9 for Construction and infrastructure in 2022, up from ₹35.3 in 2000 and ₹38.6 in 2010. For Electrical equipment it was ₹23.0 in 2022, against ₹22.2 in 2000 and ₹23.2 in 2010. Some of that pay is in the industries that supply the maker. Even for equipment, about a quarter of each rupee ends up as pay somewhere along the chain.
Be careful about what this shows. These are shares of output for a whole industry, not a solar farm or a wind project, and a share of ₹100 is not a count of jobs. A highly paid, skilled industry can have a high pay share and few workers. A pay share tells you how labour-intensive the production is, not how many people are needed. Use the tool to ask where labour is a large part of the cost and where it is not.
For a policy maker, it suggests that building and installation carry the local pay, so projects built on site create more pay at home than equipment imported ready-made. For a founder, it shows which part of a project is exposed to wages and skills, and which part is exposed to commodity prices and the exchange rate.
| Industry | Pay to employees in the industry | Depreciation | Profit, self-employed income and taxes | Pay along the whole chain, 2000 | 2010 | 2022 |
|---|---|---|---|---|---|---|
| Construction and infrastructure | ₹33.3 | ₹3.7 | ₹10.2 | ₹35.3 | ₹38.6 | ₹44.9 |
| Electrical equipment | ₹5.2 | ₹3.5 | ₹11.7 | ₹22.2 | ₹23.2 | ₹23.0 |
| Machinery and equipment | ₹7.1 | ₹4.6 | ₹17.5 | ₹22.8 | ₹23.5 | ₹22.5 |
| Building materials | ₹8.8 | ₹5.7 | ₹16.6 | ₹24.4 | ₹24.5 | ₹25.7 |
| Transport and logistics | ₹19.1 | ₹12.9 | ₹29.6 | ₹26.8 | ₹27.2 | ₹27.7 |
Own figures as shown on the site's industry pages. The chain columns are pay to employees along the whole supply chain per ₹100 of output.
Source: OECD, Input-Output Tables, India, as processed for the site (industry pages, 'Where ₹100 of output goes'), Site industry pages, Where ₹100 of output goes (OECD input-output table for India; 2000, 2010, 2022)- OECD, Input-Output Tables, India, as processed for the site (industry pages, 'Where ₹100 of output goes') · Site industry pages, Where ₹100 of output goes (OECD input-output table for India; 2000, 2010, 2022)
See it in the table
H2 HydrogenEl ElectricityCheck your understanding
Which of these did the IEA find among the roles in short supply in the energy workforce?
Applied technical roles added 2.5 million positions since 2019 and make up over half of the energy workforce, and more than half of surveyed organisations reported critical hiring bottlenecks.India's renewable workforce was about 110,000 and could reach about one million by 2030. What yearly addition does that need over nine years?
The addition is 890,000. Divided by nine years it is about 99,000 a year, around eight times the best of the three recent yearly figures.On the site, Construction and infrastructure shows ₹33.3 of pay per ₹100 inside the industry, while Electrical equipment shows ₹5.2. What does this suggest?
Pay is a much larger share of construction's output, while Electrical equipment's biggest items include commodities (₹16.9). A pay share is not a headcount.