Cost, trade-offs and resources: why the best design is rarely the strongest: review

Key terms

Life-cycle cost
The total cost of owning something from purchase to disposal: price, installation, energy, upkeep, replacement and scrap, less resale.
First cost
The price paid on the day of purchase, before any running costs.
Discount rate
The yearly percentage used to reduce future money to its worth today, reflecting what money can earn or what borrowing costs.
Present value
What a future payment is worth today after discounting.
Net present value (NPV)
The sum of all discounted cash flows of a project, costs counted negative; a positive value beats the discount rate.
Internal rate of return
The discount rate at which a project's net present value is exactly zero.
Annuity factor
The multiplier that converts equal yearly payments into one present value; the reciprocal gives the capital recovery factor.
Levelised cost of energy (LCOE)
The present value of all costs of a plant divided by the present value of all the energy it delivers, giving a flat price per kWh.
Capacity factor
The share of its full-power output that a plant actually delivers over a year.
Learning rate
The percentage by which price falls each time cumulative production doubles.
Economy of scale
The fall in cost per unit of output as a plant or process grows, because cost grows more slowly than capacity.
Six-tenths rule
An estimating rule that plant cost goes as capacity raised to about 0.6.
Standard
An agreed specification for sizes, grades, tests or interfaces so that parts from different makers fit and compete.
Embodied carbon
The greenhouse gas emitted in making a material or product, counted per kg as CO2 equivalent.
Stiffness index
A combination of density and modulus, such as density / E^(1/3) for a plate, that ranks materials by mass at equal stiffness.
Pareto front
The set of options that no other option beats on every count, so each is a different compromise.
Flat optimum
A best point where costs change little nearby, so rounded or standard values lose almost nothing.
Expected loss
The chance of a harm multiplied by its cost, used to price a safety margin.
Critical minerals
Materials such as lithium, cobalt, copper and rare earths whose supply is concentrated and vital to clean technologies.
Frugal design
Design that starts from the user's constraints and removes what they do not need, so cost falls by a large factor.

Try it in the table

  • Open 'Centrifugal water pump' and 'Solar PV module'. Redo the pump comparison of Part 1 with your own hours of use and today's diesel price, then find the discount rate at which the diesel set and the solar pump cost the same over ten years.
  • Open 'Solar PV module' and 'Solar PV cell'. Using a 26 per cent learning rate and today's price per watt, work out how many doublings of cumulative output would halve the price and how many years that is at the current annual installation rate.
  • Open 'Lithium-ion battery'. Compare the 2025 average pack price of US$108 per kWh with the US$81 for iron phosphate and US$128 for nickel-manganese-cobalt. Which materials in the bill of materials is each design avoiding, and what does it give up?
  • Open 'Shipping container' and 'Cargo ship'. List the standards that make a box interchangeable between ship, rail and road, and say what a non-standard box would cost in handling at each transfer.
  • Open 'Carbon fibre and composite parts' and 'Aeroplane'. Repeat the break-even sum of Part 3 for an aircraft part that saves 5 kg, taking a fuel burn of your own choosing per kg per hour, and explain why composites pay in aircraft more readily than in cars.
  • Open 'Aluminium can' and 'Steel reinforcing bar'. For each, estimate the carbon saved by using recycled instead of primary metal for a tonne of product, and say what limits how much recycled metal each industry can get.

Final quiz

A solar pump costs Rs 2.85 lakh more than a diesel set and saves Rs 98,000 a year in fuel and servicing. Ignoring discounting, about how long does the extra cost take to repay?

285,000 / 98,000 = 2.9 years (calculated). Discounting at 10 per cent stretches this to about 3.6 years, because later savings count for less.

At a 10 per cent discount rate, which is worth more today: Rs 1,000 received in 5 years or Rs 1,000 received in 10 years?

Dividing by 1.1^5 = 1.61 gives about Rs 621, and dividing by 1.1^10 = 2.59 gives about Rs 386. The nearer payment is worth more.

In the solar example about 91 per cent of the levelised cost is capital. Which change has the largest effect on the cost per kWh?

Lowering the rate cuts the cost from Rs 3.24 to Rs 2.83, about 13 per cent. Halving upkeep saves under 5 per cent, since upkeep is Rs 5 lakh of Rs 54.6 lakh. A one point rise in capacity factor gives about 4.5 per cent.

A product's price falls 20 per cent for each doubling of cumulative output. Starting from 100, what is the price after three doublings?

Multiply by 0.8 three times: 0.8 x 0.8 x 0.8 = 0.512, so 51. A common error is subtracting 20 three times, which gives 40.

Doubling the capacity of a plant whose cost follows the six-tenths rule raises its cost by about:

2^0.6 = 1.52, so cost rises 52 per cent while capacity rises 100 per cent, and unit cost falls to 76 per cent.

For a panel of fixed bending stiffness, steel needs 10 kg and aluminium 4.9 kg. What explains the lighter aluminium panel?

Aluminium has one third of steel's modulus and about one third of its density. Thickness scales with E^(-1/3), so the lower stiffness costs only about 42 per cent more thickness, much less than the density saving.

Why can a heavier but cheaper-to-make material be the right choice for a building frame but the wrong one for an aircraft?

Lightness pays back through energy used in motion. A stationary frame saves nothing from it, so cost and embodied carbon decide.

The Embrace infant warmer cost US$25 to US$100 against up to US$20,000 for an incubator. What most explains the difference?

The design started from where the babies were, without reliable power or trained staff. It gives up monitoring and fine control and so cannot replace intensive care.

Sources for this module

  • Kosky et al., Exploring Engineering (Academic Press, 2013) · ch. 5, 'Engineering Economics' (cost of money, compound interest, when an investment is worthwhile); ch. 11, 'Materials Engineering'
  • Hammack, The Things We Make (Sourcebooks, 2023) · ch. 2, 'Best: The Vitruvian Man, Kodachrome, and the Constant Search for Better'; ch. 4, 'Resources: From Mesopotamia to the Islamic Empire to Space'
  • IRENA, Renewable power generation costs in 2025 (July 2026), executive summary; figures as reported by PV Tech and Down To Earth, July 2026 · web
  • ITRPV, International Technology Roadmap for Photovoltaics, 17th edition (2026), as reported by PV Tech, 25 June 2026 · learning rate 26 per cent for 1976 to 2025; module price about US$0.09 per W at end 2025; 706 GW shipped, https://www.pv-tech.org/itrpv-2026-solar-industry-maintains-historic-learning-curve-despite-market-turbulence/
  • BloombergNEF, Lithium-ion battery price survey (9 December 2025) · pack prices by chemistry, segment and region, 2025, https://about.bnef.com/insights/clean-transport/lithium-ion-battery-pack-prices-fall-to-108-per-kilowatt-hour-despite-rising-metal-prices-bloombergnef/
  • Ritchie and Rosado, Battery costs have declined by 99% in the last three decades, Our World in Data (2024, updated March 2026) · about 19 per cent price fall per doubling of cumulative production since 1998, https://ourworldindata.org/battery-price-decline
  • IEA PVPS, Snapshot of Global PV Markets 2026 · nearly 3 TW cumulative at end 2025, about 698 GW installed in 2025, https://iea-pvps.org/snapshot-reports/snapshot-2026/
  • ifeu, Energy savings by light-weighting: 2016 update (Heidelberg, December 2016), for the International Aluminium Institute · petrol car, mixed driving: 0.24 litre per 100 km per 100 kg, 0.32 with powertrain resizing; 200,000 km family-car life, https://international-aluminium.org/wp-content/uploads/2024/04/Energy-savings-by-light-weighting.pdf
  • Explore Composites, Basic numbers and calculations for composites · quasi-isotropic carbon/epoxy laminate about 60 GPa; unidirectional lamina about 130 GPa at 1.6 g/cc, https://explorecomposites.com/articles/design-for-composites/basic-numbers-and-calculations-for-composites/
  • worldsteel, Sustainability Indicators 2025 (data year 2024) · CO2 intensity of crude steel by route
  • International Aluminium Institute, factsheet on recycling and greenhouse gas savings · primary aluminium 2022 and recycled aluminium emissions per tonne
  • Chen, Liddell, Ogale, Miao, Ijeoma and Carbajales-Dale, Resources, Conservation and Recycling vol. 219 (2025), article 108302 · critical review and meta-analysis of carbon fibre energy demand and carbon footprint
  • IEA, Global Critical Minerals Outlook 2026 · executive summary, https://www.iea.org/reports/global-critical-minerals-outlook-2026/executive-summary
  • Engineering For Change, Jaipur Foot solution page (updated December 2023) · cost, materials, fitting and numbers fitted, https://www.engineeringforchange.org/solutions/product/jaipur-foot/
  • Stanford Graduate School of Business, Embracing a Way to Change the World (2011) · cost and design constraints of the Embrace infant warmer, https://www.gsb.stanford.edu/insights/embracing-way-change-world
  • GMK Center, Nucor has raised the price of hot-rolled coils to $1,200 per short tonne (15 September 2026) · US average hot-rolled coil price of US$1,225 per short ton on 8 September 2026, https://gmk.center/en/news/nucor-has-raised-the-price-of-hot-rolled-coils-to-1-200-per-short-tonne/
  • IMARC Group, Carbon fibre price report (2026 edition) · quarterly price series by country, 2025 to 2026
  • pv magazine, India's solar-plus-storage tender sets record low INR 2.86 tariff (16 October 2025) · SECI auction of 2,000 MW solar with 1,000 MW / 4,000 MWh storage, https://www.pv-magazine.com/2025/10/16/indias-solar-plus-storage-tender-sets-record-low-inr-2-86-tariff/
  • HDFC Sky, Petrol and diesel prices today, 11 November 2026 (data from Goodreturns) · diesel Rs 95.20 per litre in Delhi, https://hdfcsky.com/news/petrol-diesel-prices-today-november-11-2026-check-latest-rates-in-delhi-mumbai-kolkata-chennai-bengaluru-hyderabad
  • SolarSquare, PM-KUSUM Yojana for solar pumps: subsidy guide (4 September 2026) · indicative pre-subsidy prices and subsidy shares, https://www.solarsquare.in/blog/pm-kusum-yojana-for-solar-pumps-subsidy/
  • alcircle, LME aluminium cash offer price falls 1.30% to $3,117/t on November 6 (2026) · cash bid US$3,115 per tonne, https://www.alcircle.com/news/lme-aluminium-cash-offer-price-falls-1-30-to-3-117-t-on-november-6-as-stocks-dip-to-228-475t-121887