Material Insights · Understanding the Material World

Data-centre server: Footprint

Raw materials in one unit

Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions

VariantMaterialAmount (kg)ThroughEmission factor (kg CO2e per kg)Emissions (kg CO2e)
GeneralSteel11.688– 1.9222.4
GeneralCopper3.573Memory chip, Printed circuit board3.96514.2
GeneralHydrochloric acid2.49Printed circuit board– –
GeneralHydrogen peroxide1.46Printed circuit board– –
GeneralAluminium1.327– 14.819.6
GeneralSulphuric acid0.99Printed circuit board– –
GeneralABS0.306– – –
GeneralRare earths0.015– – –
GeneralCobalt0.009– – –
GeneralEpoxy resins0.001Memory chip– –
GeneralSilicon0Memory chip– –
AICopper0.001Memory chip3.9650
AIEpoxy resins0.001Memory chip– –
AISilicon0Memory chip– –

Worked out from data

The site's estimate

Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors

VariantStagePlaceEmissions (kg CO2e)Mass covered by factors
GeneralMakingWorld24376%
GeneralUseWorld3615100%
GeneralMakingIndia31776%
GeneralUseIndia5288100%
AIMakingWorld1.4656%
AIUseWorld– –
AIMakingIndia2.0956%
AIUseIndia– –

Worked out from data

Energy in use

Energy one unit uses per year of use, by carrier

Energy in use
  • El Electricity 1973 kWh per year · lifetime 4 years General-purpose Calculated: 7,892.8 kWh over 4 years for a Dell R760 at a light-medium workload [1]. Dell's R740 gives 1,760.3 kWh a year [2] and the JRC example server 1,661 kWh a year [3].
  • El Electricity 69,204 kWh per year AI accelerator Calculated: 7.9 kW measured average of an 8-H100 node in training, run all 8,760 hours of a year [11]. The 10.2 kW maximum would give 89,352 kWh [8]. Lifetime not found for AI servers.

as of 2026-11-16

Emissions by stage

Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant

StageValueRangeUnitShareVariantPlaceYearSource
Making918.8– kg CO2e per server23General-purposeEU2015JRC example rack server of 27.8 kg, four-year life, end-of-life scenario 2; share calculated from the three stage values, with transport inside making [3]
Use3133.69– kg CO2e per server78.5General-purposeEU2015Same study; 1,661 kWh a year for four years; share calculated [3]
End of life-58.82– kg CO2e per server-1.5General-purposeEU2015Same study; a credit for recovered materials under manual plus automatic separation; share calculated [3]
Logistics– – kg CO2e per server– General-purposeEU2015JRC example server: transport is counted inside the manufacturing phase, not as a stage of its own [3]
Making– 290 to 627 kg CO2e per serverkg CO2e per server– General-purposeEU and United States of America2025Dell R760 states only that manufacturing is around 10 to 15% of total GWP. The range is calculated by this site, not stated by Dell: low is 10% of the EU total of 2,896.0 kg, high 15% of the US total of 4,177.4 kg [1]
Use– 2520 to 3801 kg CO2e per serverkg CO2e per server– General-purposeEU and United States of America2025Dell R760 states only that use is approximately 87 to 91% of total GWP, four years and 7,892.8 kWh. The range is calculated by this site, not stated by Dell: low is 87% of 2,896.0 kg (EU), high 91% of 4,177.4 kg (US) [1]
Logistics– – kg CO2e per server– General-purposeEU and United States of America2025Dell R760: distribution and transport are under 0.2% of total GWP; no value given [1]
End of life-62.2– kg CO2e per server– General-purposeEU and United States of America2025Dell R760: a credit of 62.2 kg CO2e, 52% of it from electronics [1]
Making1312– kg CO2e per GPU baseboard– AI acceleratorWorld2025NVIDIA HGX H100 GPU baseboard only, cradle to gate (raw material extraction to final assembly of the baseboard); the rest of the server is not included, so it is below a whole server [9]

Indicative · as of 2026-11-16. JRC shares (23.0, 78.5 and -1.5%) add to 100. Dell gives R760 stage shares only as ranges (10 to 15%, 87 to 91%, under 0.2%) and totals of 2,896.0 kg CO2e (EU) and 4,177.4 kg (US) over four years; its stage values here are the site's calculated envelopes [1][3]. Embodied emissions of six public LCAs of general-purpose servers range 40 times, from 423 to 15,593 kg CO2e, in a review cited by Schneider et al. [36]. Memory ICs are 42% and other ICs including GPUs 25% of the HGX baseboard's emissions [9].

End of life

What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place

RouteSharePlaceYearSource
Recyclability rate of the JRC example server with manual plus automatic separation (scenario 2)61.7EU2015[3]
Recyclability rate of the JRC example server with unsorted shredding (scenario 3)59.6EU2015[3]
Worst-case recyclability rate of a Lenovo ThinkSystem SR65093.75World2019[4]
All electronic waste documented as properly collected and recycled (no server-specific figure)22.3World2022[27]

as of 2026-11-16

Recovered as

The commodities and chemicals recovered at end of life, with recovery rates

Recovered as
  • Au Gold 95% recovered · Recycling Calculated from the JRC's Table 33: 0.91 g of the 0.962 g of gold in the example server's boards is recovered under manual plus automatic separation, 0.250 g when shredded unsorted (26%). The report's text gives 98-99% falling to 26-11% for these metals, which its own table does not bear out [3].
  • Ag Silver 83% recovered · Recycling Calculated from the JRC's Table 33: 0.40 g of 0.483 g recovered under careful separation, 0.053 g (11%) unsorted [3].
  • Pd Palladium 80% recovered · Recycling The JRC gives palladium recyclability rates of 80% and 25% for its end-of-life scenarios 2 and 3 [3].

as of 2026-11-16

End of life in India

Collection and recycling in India, including the informal sector

Less than a quarter (22.3%) of the world's 62 million tonnes of e-waste in 2022 was documented as properly collected and recycled [27]. Servers are a high-value stream: in the JRC's example, careful sorting recovers about 80 to 95% of the gold, palladium and silver in the boards against 11 to 26% when shredded unsorted (calculated) [3]. ITRenew's model assumes three years in a hyperscale site and six more with a downstream user [28]. India's E-Waste Rules 2022 apply extended producer responsibility from 1 April 2023 [25]. No server-specific informal-sector share was found.

as of 2026-11-16

Sources

  1. Life Cycle Assessment of Dell Server PowerEdge R760 (report produced September 2025) Dell Technologies, 2025
  2. PowerEdge R740 product carbon footprint (report produced January 2019) Dell Technologies, 2019
  3. Analysis of material efficiency requirements of enterprise servers (EUR 27467 EN), Talens Peiró and Ardente, September 2015 European Commission Joint Research Centre, 2015
  4. Lenovo Server Product Recyclability Assessment (file dated December 2019; the document shows no date) Lenovo
  5. Introduction to NVIDIA DGX H100/H200 Systems (last updated 17 October 2026) NVIDIA, 2026
  6. Product Carbon Footprint (PCF) Summary for NVIDIA HGX H100 (July 2025) NVIDIA, 2025
  7. 2024 United States Data Center Energy Usage Report (LBNL-2001637) Lawrence Berkeley National Laboratory, 2024
  8. E-Waste Management Rules, 2022 International Energy Agency policies database, 2022
  9. Global e-Waste Monitor 2024: Electronic Waste Rising Five Times Faster than Documented E-waste Recycling UNITAR, 2024
  10. Data Center Impact Report: The Financial & Sustainability Case for Circularity (Fenn and Fesch; the document shows no date) ITRenew, hosted by the Open Compute Project