Electric bus: Footprint
Raw materials in one unit
Every commodity and chemical inside one unit, traced through its components by the site, with its emission factor and emissions
| Variant | Material | Amount (kg) | Through | Emission factor (kg CO2e per kg) | Emissions (kg CO2e) |
|---|---|---|---|---|---|
| 12 m city bus | Steel | 5478.5 | Electric motor | 1.92 | 10,518.7 |
| 12 m city bus | Aluminium | 941.9 | Lithium-ion battery, Electric motor | 14.8 | 13,940.1 |
| 12 m city bus | Battery cathode materials | 560.9 | Lithium-ion battery | 26.9 | 15,088.2 |
| 12 m city bus | Graphite | 351.55 | Lithium-ion battery | 25.1 | 8823.9 |
| 12 m city bus | Copper | 224.4 | Lithium-ion battery, Electric motor | 3.965 | 889.7 |
| 12 m city bus | Battery electrolytes | 154.05 | Lithium-ion battery | – | – |
| 12 m city bus | Lead | 10.5 | Lead-acid battery | – | – |
| 12 m city bus | Silica sand | 6.69 | Flat glass sheet | – | – |
| 12 m city bus | Sulphuric acid | 4.35 | Lead-acid battery | – | – |
| 12 m city bus | Soda ash | 1.38 | Flat glass sheet | – | – |
| 12 m city bus | Crushed stone | 1.38 | Flat glass sheet | – | – |
| 12 m city bus | Polypropylene | 0.76 | Lead-acid battery | 1.548 | 1.2 |
| 12 m city bus | Polyethylene (LDPE, LLDPE) | 0.38 | Lead-acid battery | – | – |
Worked out from data
The site's estimate
Emissions of one unit worked out by the site from its materials and energy, for the world and India, with the share of mass covered by emission factors
| Variant | Stage | Place | Emissions (kg CO2e) | Mass covered by factors |
|---|---|---|---|---|
| 12 m city bus | Making | World | 54,667 | 98% |
| 12 m city bus | Use | World | 514,426 | 100% |
| 12 m city bus | Making | India | 55,369 | 98% |
| 12 m city bus | Use | India | 752,544 | 100% |
Worked out from data
Energy in use
Energy one unit uses per year of use, by carrier
Energy in use- El Electricity 93,600 kWh per year (calculated) · lifetime 12 years 12 m city bus 1.3 kWh/km tender upper limit times 72,000 assured km a year [6]; the Italian study used 1.25 kWh/km [8].
- El Electricity 64,800 kWh per year (calculated) · lifetime 12 years 9 m midi bus 1.0 kWh/km tender upper limit times 64,800 assured km a year [6].
as of 2026-11-16
Emissions by stage
Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant
| Stage | Value | Range | Unit | Share | Variant | Place | Year | Source |
|---|---|---|---|---|---|---|---|---|
| Making | 59,364 | 55,815 to 59,364 kg CO2e per bus (materials and manufacturing), iron phosphate bus; low is the nickel-based pack of bus C, Zhan et al. 2025, 200,000 km life | kg CO2e per bus (materials and manufacturing), iron phosphate bus; low is the nickel-based pack of bus C, Zhan et al. 2025, 200,000 km life | 31.9 | 12 m city bus | China | 2025 | [4] |
| Use | 133,425 | – | kg CO2e per bus over 200,000 km at the 2022 Chinese grid mix (coal 55%); average of the five buses, while making is bus A | 71.6 | 12 m city bus | China | 2025 | [4] |
| End of life | -6558 | -14,944 to -4078 kg CO2e per bus, a recycling credit (iron phosphate bus; low is bus C); shares calculated against the sum of the three stages | kg CO2e per bus, a recycling credit (iron phosphate bus; low is bus C); shares calculated against the sum of the three stages | -3.5 | 12 m city bus | China | 2025 | [4] |
| Making | 105,400 | – | kg CO2e per bus, calculated: upstream plus core of the Ebusco 3.0 EPD (1.198 g per passenger-km times 88 million passenger-km), 800,000 km life | 26 | 12 m city bus | EU | 2024 | [7] |
| Logistics | – | – | kg CO2e per bus: raw material transport and transport to client, 0% of the EPD's total | 0 | 12 m city bus | EU | 2024 | [7] |
| Use | 287,900 | – | kg CO2e per bus, calculated: use 68% plus maintenance 4% of the EPD's 399,916 kg total | 72 | 12 m city bus | EU | 2024 | [7] |
| End of life | 12,000 | – | kg CO2e per bus, calculated: 3% of the EPD's 399,916 kg total | 3 | 12 m city bus | EU | 2024 | [7] |
as of 2026-11-16. The Chinese study gives no logistics stage; its shares are calculated against the sum of making, use and end of life. The EU shares are the EPD's own rounded shares and add to 101.
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| Vehicle recycling rate in the Italian study (manual dismantling, shredding, treatment) | 80 | Italy | 2025 | [8] |
| Share of vehicle mass assumed recycled in the Chinese study (an assumption, not a measured rate) | 98 | China | 2025 | [4] |
as of 2026-11-16
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as- St Steel Dismantling and shredding of the vehicle The Italian study assumes about 80% of the vehicle is recycled overall [8]; no steel-only rate found.
- Al Aluminium Dismantling and shredding of the vehicle No aluminium-only rate found [8].
- Cu Copper Dismantling and shredding of the vehicle No copper-only rate found [8]. Metals recovered from the battery are counted at the battery node.
as of 2026-11-16
End of life in India
Collection and recycling in India, including the informal sector
No opened source gives a bus collection or recycling rate for India. Under the Battery Waste Management Rules 2022 the producer or importer must collect and recycle or refurbish batteries and can buy EPR certificates from a CPCB portal [20]. Operators replace the battery around year 7 of service [22]. The informal sector's role for buses was not found.
as of 2026-11-16
Sources
- Life cycle carbon footprint of battery electric bus: coupling effects of mileage, energy mix and recycling processes (Zhan et al., Carbon Footprints 2025, 4, 19) OAE Publishing, 2025
- Emissions reduction and benefits of the first 3,825 electric buses under PM-eBus Sewa International Council on Clean Transportation
- Environmental Product Declaration: Ebusco 3.0 12m bus (EPD-IES-0012607) Ebusco B.V., International EPD System, 2024
- Life Cycle Assessment of Urban Electric Bus: An Application in Italy (Brambilla and Girardi), version 1 Preprints.org, 2025
- New Battery Waste Management Rules make producers accountable for recycling Down To Earth, 2022
- E-Bus Basics Institute for Transportation and Development Policy India