Processor chip: Footprint
Emissions by stage
Published life-cycle emissions of one unit in four stages (making, logistics, use, end of life), with their split, place and variant
| Stage | Value | Unit | Place | Year | Source |
|---|---|---|---|---|---|
| Making | 1.3 | kg CO2e per processor chip | World (one phone only: the Fairphone 5, a 2023 phone assessed in 2024) | 2024 | Calculated, one phone only: 16.2 kg CO2e of ICs on the Fairphone 5 primary board x roughly 8% for the processor chip = about 1.3 kg [7] |
Indicative · as of 2026-11-13. The 8% is the LCA's share for the processor chip within the impacts of the ICs on the primary board, 'roughly 8% for most impact categories' [7]. The result is a rough calculated value for one chip in one phone, not a class average. No source opened gives logistics, use or end-of-life emissions of a processor chip.
End of life
What happens to a unit when it is thrown away: collection, reuse, recycling and disposal shares, by place
| Route | Share | Place | Year | Source |
|---|---|---|---|---|
| All e-waste documented as formally collected and recycled (not chip specific) | 22.3 | World | 2022 | [29] |
as of 2026-11-13. No source opened gives a recycling rate for processor chips or any India figure.
Recovered as
The commodities and chemicals recovered at end of life, with recovery rates
Recovered as- Cu Copper Recycling Copper is worth USD 19 billion of the secondary raw materials in e-waste [29]; no source gives a rate for processors.
- Au Gold Recycling Gold is worth USD 15 billion of the secondary raw materials in e-waste [29]; no source gives a rate for processors.
as of 2026-11-13
End of life in India
Collection and recycling in India, including the informal sector
Processor chips are recovered only as part of whole products. The world generated 62 billion kg of e-waste in 2022 and 22.3% was documented as formally recycled [29]. In India, the E-Waste (Management) Rules, 2022 set producer targets met with certificates bought from registered recyclers, in force from 1 April 2023 [30]. No source opened covers recovery of processor chips themselves, or the informal sector.
as of 2026-11-13
Water and waste
Water use and waste per unit where a source gives them
| Measure | Value | Unit | Stage | Year | Source |
|---|---|---|---|---|---|
| TSMC unit water consumption per 12-inch-equivalent wafer mask layer | 153.3 | litres | Manufacturing | 2025 | [15] |
| Emissions of one leading-edge (N2) logic wafer, industry-average grid mix and 100% abatement (per wafer, not per chip) | 1600 | kg CO2e per wafer | Manufacturing | 2025 | [16] |
as of 2026-11-13. No source opened gives water or waste per processor chip.
Sources
- Life Cycle Assessment of the Fairphone 5 Fairphone, 2024, Table 1-1 (p. 8), Table 5-3 (p. 34), Figure 6-5 and p. 45
- TSMC 2025 Sustainability Report Taiwan Semiconductor Manufacturing Company (TSMC), 2026, pp. 6, 110
- How can we reduce environmental impact in chip manufacturing? imec (first published in Semiconductor Digest, July/August 2025 issue), 2025
- The Global E-waste Monitor 2024 (executive summary) UNITAR and ITU, 2024
- The Gazette of India: Extraordinary, G.S.R. 801(E), 2 November 2022: E-Waste (Management) Rules, 2022 (copy on the Andaman and Nicobar Administration site) Ministry of Environment, Forest and Climate Change, Government of India, 2022, rules 1(2), 2 and 13(3); Schedule I