Material Insights · Understanding the Material World

Activated sludge sewage treatment: Evolution

Timeline

The milestones from first idea to today

YearMilestone
1912Clark and Gage begin laboratory aeration studies at the Lawrence Experiment Station, Massachusetts [1]
1913Ardern and Lockett aerate raw sewage in bottles at Davyhulme, Manchester [2]
1914Their result is presented to the Society of Chemical Industry on 3 April; Salford runs a fill-and-draw plant [1, 2]
1916Worcester, England, opens a continuous-flow plant of 2 million gallons a day [1, 2]
1920Sheffield becomes the first British city to apply the process [2]
1925Milwaukee, Wisconsin, opens a 45 million gallons a day plant [1]
202242% of the world's household wastewater is still not safely treated [3]

as of 2026-11-11

Lineage

The technologies it came from and the ones that came from it

Came before it
  • Sew Sewerage Sewers gathered a town's waste in one place; activated sludge plants treat that flow before it reaches the river.
Works with

as of 2026-11-11

Sources

  1. Reflections on Seven Decades of AS History James E. Alleman and T. B. S. Prakasam, Water Pollution Control Federation; hosted by Iowa State University
  2. Activated Sludge: 100 [years] not out WaterWorld, 2014
  3. Progress on Wastewater Treatment - 2024 Update UN-Water, 2024