Dynamic random-access memory: Levers
Held back most by
Production
DRAM needs more silicon for each bit as high-bandwidth memory (HBM) grows: Micron says HBM needs more wafers and cleanroom space for the same number of bits as conventional DRAM [15]. India's approved memory plant at Sanand finishes wafers made in Micron's global network [17], so wafer capacity is the lever (judgement). It is close: economics, the boom and bust price cycle [15], runs a near second.
The six layers
Mathematics, science, engineering, production, economics, and resources and rules: what each gives, the idea in plain words, the limit (hard or soft) and how close today is, what could unlock it, and the maths behind it
Six layers make a technology possible, from the mathematics underneath to the resources and rules it needs at world scale. A hard limit comes from mathematics or nature and can only be sidestepped; a soft limit moves with effort, scale, money or policy.
- 1 Mathematics Hard limit
Mathematics is the language of its physics
What it gives. The language for the cost of storing and forgetting a bit.
The idea. Role: language. A physical law (charge on a capacitor) makes DRAM work; mathematics describes it. Erasing one bit must cost at least kB T ln 2 of energy [11], which is about 2.87 × 10-21 joules at 300 K (calculated).
The limit. Erasing one bit costs at least kB T ln 2 of energy [11].
What could unlock it. Real chips sit far above this floor, so it does not bind today (judgement). Only a design that avoids erasing bits could go below it.
Show the maths
Emin = kB T ln 2- Emin
- the least energy that must be given off as heat to erase one bit, in joules
- kB
- Boltzmann's constant, 1.380649 × 10-23 joules for each kelvin
- T
- the temperature, in kelvin
- ln 2
- the natural logarithm of 2, about 0.693
In plain words. Wiping a bit so it can be used again throws away information, and nature charges a small heat fee for that. The fee is tiny: about three billionths of a billionth of a joule at room temperature. Real chips pay far more than this, so it is a floor, not today's problem.
Worked example. At 300 K (assumed), Emin = 1.380649 × 10-23 × 300 × 0.693 = 2.87 × 10-21 joules (calculated) [11].
- 2 Science Hard limit
What it gives. A bit held as electric charge on a tiny capacitor, switched by one transistor.
The idea. Each bit is charge on a capacitor, and the charge stored is the capacitance times the voltage [12]. The charge leaks, so each cell is read and re-written, a refresh, about every 10 ms in the lecture's simple model [13].
The limit. Leakage forces constant refresh: a cell that is not rewritten forgets [13].
What could unlock it. Using a different store, not a leaking capacitor, removes refresh, but then it is no longer DRAM (judgement).
Show the maths
C = Q / V- C
- the capacitance of the cell, in farads
- Q
- the charge stored, in coulombs
- V
- the voltage across the capacitor, in volts
In plain words. A capacitor is a bucket for charge. For each volt you put across it, it holds a fixed amount of charge. A DRAM cell is a very small bucket, so it holds very few electrons, and they slowly seep out. That is why the chip keeps topping the buckets up.
Worked example. Take C = 10 fF (assumed, a typical size for a modern cell) and V = 1 V (assumed). Then Q = C × V = 10-14 coulombs, about 62,000 electrons at 1.602 × 10-19 coulombs each (calculated) [12].
- 3 Engineering Soft limit
What it gives. A cell small enough, and a refresh quick enough, for billions of bits on one chip.
The idea. The roadmap aims to shrink the one-transistor, one-capacitor cell to a practical limit of 4F², where F is the smallest feature size, and to use insulators with a higher dielectric constant so the shrinking capacitor still holds enough charge [14].
The limit. The IEEE roadmap sees no clear path for further scaling beyond 2D DRAM; 3D cell stacking is under discussion [14].
What could unlock it. Stacking cells in three dimensions is the route the roadmap names [14].
- 4 Production Soft limit Binds most today
What it gives. Wafers of memory, made in very large volume at a falling cost per bit.
The idea. HBM needs more wafers and cleanroom space for the same number of bits as conventional DRAM in the same technology node [15]. Cost per unit tends to fall by a fixed share each time total output doubles, a pattern first put forward by Theodore Wright in 1936 [16][20].
The limit. Wafer capacity and cleanroom space: HBM takes more of both for each bit [15].
What could unlock it. More fabs and advanced packaging capacity; India has so far approved assembly and test capacity for memory [17].
Show the maths
K(n) = K(m) × (n/m)b- K(n)
- the cost of making unit number n, in money or hours
- K(m)
- the cost of making an earlier unit, number m, in the same unit
- n
- a larger total number of units made so far
- m
- a smaller total number of units made so far
- b
- log R ÷ log 2, a negative number that sets how fast cost falls
- R
- the learning rate: the fraction of the old cost left after total output doubles
In plain words. The more of something the world has made, the cheaper each new one gets, by about the same share each time the total doubles. This is a pattern seen in many technologies, not a law of nature, and it can stall.
Worked example. Take R = 0.8 (assumed). Then b = log 0.8 ÷ log 2 = -0.322 (calculated). After three doublings n/m = 8, and 8-0.322 = 0.512, so a unit costs about half the earlier cost (calculated) [20].
- 5 Economics Soft limit
What it gives. A price per bit that buyers pay, set by a boom and bust market.
The idea. Micron's filing states the industry cycles, with demand not fully aligned to supply [15].
The limit. Cycles of supply and demand: prices and returns swing for makers [15].
What could unlock it. Long-term supply agreements and capacity discipline are possible levers, but no cited source measures them (judgement).
- 6 Resources and rules Soft limit
What it gives. Fabs, packaging plants and permission to build them, at world scale.
The idea. India's Cabinet has approved 12 projects under the India Semiconductor Mission, with about Rs 1.64 lakh crore of investment [18]. Micron's Sanand plant converts DRAM and NAND wafers from its global manufacturing network into finished products [17]. Micron also warns that new and proposed export controls could restrict sales or its ability to obtain equipment [15].
The limit. Permission and place: the wafers come from outside India [17], and export controls can restrict where memory is sold and where tools come from [15].
What could unlock it. Approved fabs could widen capacity, but the Tata Electronics fab at Dholera, at Rs 91,000 crore, is for compute and power chips, not memory [19].
as of 2026-11-24
Sources
- The physics of forgetting: Landauer's erasure principle and information theory (Plenio and Vitelli) arXiv (Contemporary Physics paper), 2001
- 8.1 Capacitors and Capacitance (University Physics Volume 2) OpenStax, 2016
- 6.004 Computation Structures, Spring 2017, lecture notes on memory MIT OpenCourseWare, 2017
- International Roadmap for Devices and Systems 2022, More Moore chapter IEEE IRDS, 2022
- Micron Technology Form 10-Q for the third quarter of fiscal 2026, risk factors Micron Technology (SEC filing), 2026
- Statistical basis for predicting technological progress (Nagy, Farmer, Bui, Trancik), abstract arXiv; published in PLoS ONE 2013, 2012
- PM to visit Gujarat on 28th February (Micron Sanand ATMP facility) Press Information Bureau, Government of India, 2026
- Cabinet approves two more semiconductor manufacturing units with cumulative investment of more than Rs. 3,900 crore Press Information Bureau, Government of India, 2026
- Giant leap for India Semiconductor Mission: Cabinet approves three more semiconductor units Press Information Bureau, Government of India, 2024
- Learning Curves: theory (Stephen R. Lawrence, undated) Leeds School of Business, University of Colorado Boulder, 2026