Advanced geothermal: Resources and labour
Oilfield rigs, very deep wells and water for fracturing
The dominant resource is drilling: more and deeper wells, steel casing and cement, plus large volumes of water to fracture enhanced systems. Skills transfer directly from oil and gas.
Natural resources
| Resource | How much | Why it is needed |
|---|---|---|
| Wells | About 10 wells (6 production, 3 injection) for a 20 MW EGS plant9 | Fractured rock yields a limited flow per well, and water must be circulated. |
| Water for stimulation | About 71,000 m3 for a 20 MW EGS plant; about 22,400 m3 per average stimulation9 | Pressurised water opens fractures in the rock. |
| Steel and cement | 332 t steel and 335 t cement in surface pipelines for 20 MW EGS (about 17 t per MW each, calculated), plus well casing9 | Pipelines and well linings withstand heat and pressure. |
| Wellbore length (closed loop) | About 16 km of continuous wellbore per well pair at Geretsried3 | Conduction is slow, so very long contact with hot rock is needed. |
| Land | Cape Station development covers about 631 acres (about 255 ha, calculated)7 | Well pads, plant and pipelines. |
Labour
| Phase | How much | Skills | Why it is needed |
|---|---|---|---|
| Construction and drilling | Up to 80% of geothermal investment uses capacity and skills that transfer from oil and gas814 | Directional drillers, completion and fracturing engineers, reservoir engineers | Horizontal drilling and multi-stage stimulation come from shale oil and gas. |
| Manufacturing | 3.3-3.9 person-years per MW (geothermal generally)10 | Turbine, heat-exchanger and pipe manufacture | Same surface plants as conventional geothermal. |
| Operation | 0.36-0.7 jobs per MW (geothermal generally)10 | Plant operators, reservoir monitoring | Fracture networks and pressures must be watched continuously. |
| All phases | Could rise sixfold to about 1 million geothermal jobs by 2030814 | Oil and gas workforce | IEA projection with strong growth of next-generation geothermal. |
Sources
- Innovative geothermal project powers up in Bavaria Energy Institute, New Energy World, 2025
- Fervo Energy achieves first power at flagship Utah geothermal project Power Engineering, 2026
- Technology breakthroughs are unlocking geothermal energy's vast potential in countries across the globe (launch of The Future of Geothermal Energy) IEA, 2024
- Life-Cycle Analysis of Geothermal Technologies (Wang, Clark and Sullivan, Argonne National Laboratory) US DOE, 2010
- GEOELEC Employment study, Deliverable 5.1 (Schütz et al.) GFZ Potsdam / APPA, 2013
- The Future of Geothermal Energy IEA, 2024