Advanced geothermal: Overview
What it does
The job the technology does for people, in a short paragraph
Advanced geothermal aims to make steady, low-carbon power from hot rock almost anywhere, not only where nature left hot water underground. Enhanced systems crack hot rock open with water pressure; closed loops circulate fluid through sealed wells. Los Alamos drilled the first test wells in 1974 [1], and Fervo's Project Red in Nevada has sent power to the grid since 2023 [2][3]. Utah's Cape Station reached first power in September 2026 [3].
as of 2026-11-11
How it works
The working principle in plain words, step by step
Rock gets hotter with depth everywhere, but most hot rock is too tight for water to flow through. In an enhanced system, wells are drilled into it, often turning sideways with oil-industry methods, and water is pumped down at high pressure to open a network of small cracks. Cold water then goes down an injection well, picks up heat as it seeps through the cracks, and comes up a production well hot. At the surface a power plant uses that heat, often by boiling a second fluid in a binary plant, before the water is pumped back down. A closed-loop system skips the cracking: fluid runs through a sealed loop of deep wells and branches, and heat reaches it only by conduction through the rock.
as of 2026-11-11
Key figures
The handful of numbers that size it up, each with its unit, year and source
| Figure | Value | Unit | Year | Source |
|---|---|---|---|---|
| Power Project Red sends to the grid | 3.5 | MW | 2023 | [2] |
| Planned size of Cape Station Phase I (three 33 MW units) | 100 | MW | 2026 | [3] |
| Power sales contracted from Cape Station | 900 | MW | 2026 | [3] |
| Target electrical output of Eavor's closed loop at Geretsried (in partial commercial operation) | 8.2 | MW | 2025 | [4] |
| Possible fall in next-generation geothermal costs by 2035 with the right support (IEA projection) | 80 | % | 2035 | [5] |
as of 2026-11-11. The 2023, 2025 and 2026 years of the Project Red, Geretsried and Cape Station rows are the dates of the articles reporting them (28 November 2023, 4 December 2025, 24 September 2026); the figures describe the plants at those dates [2][3][4]. The 2035 row is a projection year, not a measurement [5].
Where it is used
The main places and products the technology is found in
- Fervo's Project Red in Nevada and Cape Station in Utah, United States
- Eavor's closed-loop plant at Geretsried, Bavaria, which also supplies heat
- Power for data centres under direct supply deals
- Research sites testing hot dry rock since the Fenton Hill experiment
as of 2026-11-11
Scale today
How much of it there is now: units in use, made each year and who uses it
- Installed
- Tens of megawatts: Project Red's 3.5 MW [2], Geretsried's 8.2 MW target [4] and the first 33 MW unit of Cape Station's planned 100 MW Phase I [3]
- Users
- a few utilities and data centre owners; geothermal as a whole meets less than 1% of world energy demand [5]
- Unit
- MW of generating capacity
- Year
- 2026
- Note
- Status as reported in September 2026 (an article date) [3]. A further 400 MW at Cape Station is under construction, expected in 2028 [3]. The IEA puts the technical potential of next-generation geothermal at 140 times world electricity demand [5].
as of 2026-11-11
Sources
- Preliminary Assessment of a Hot Dry Rock Geothermal Energy Reservoir Formed by Hydraulic Fracturing Los Alamos Scientific Laboratory, via OSTI (US Department of Energy), Stanford Geothermal Program report SGP-TR-20-26; OSTI ID 887394; the record shows no date
- New Google geothermal electricity project could be a milestone for clean energy The Associated Press (Bangor Daily News), 2023
- Fervo Energy achieves first power at flagship Utah geothermal project Power Engineering, 2026
- Eavor reports first electricity generation at pioneering geothermal project in Geretsried, Germany ThinkGeoEnergy, 2025
- The Future of Geothermal Energy: Executive summary International Energy Agency