Distribution grids, mini-grids and interconnectors: Technology advances
Prepaid meters, cheaper mini-grids and switchgear without SF6
Distribution is being digitised (smart and prepaid meters, automated switching), mini-grids are getting cheaper, SF6 is being removed from switchgear, and Europe is adding interconnectors.
Latest advances
Third-generation solar-hybrid mini-grids being deployed · 2022Solar, batteries and diesel backup with prepaid smart meters and remote monitoring, built in portfolios67
Improves: Best-in-class cost fell from USD 0.55 per kWh in 2018 to USD 0.38 in 2021; USD 0.20 possible by 2030
SF6-free medium-voltage switchgear in service · 2026Switchgear insulated with dry air and vacuum interrupters1516
Improves: Avoids a gas 24,300 times as warming as CO2; EU bans new SF6 units up to 24 kV from 1 January 2026
Batteries on distribution networks being deployed · 2023Utility-owned storage at substations and feeders2
Improves: Can defer network upgrades and cover peaks; US utility spending rose more than sevenfold in one year
New subsea interconnector, Spain to France being deployed · 2028Two 1,000 MW DC links of about 400 km across the Bay of Biscay1213
Improves: Raises exchange capacity from 2,800 to 5,000 MW
Comparing the options
| Option | Efficiency | Cost | Capacity or distance | Maturity |
|---|---|---|---|---|
| Main-grid distribution (advanced economy)12 | About 5% losses (with transmission) | US utilities invested USD 50.9 billion in distribution in 2023 | Whole cities and regions | mature |
| Third-generation solar-hybrid mini-grid7 | About 99% uptime for leading developers | About USD 3,700 per kW (2021); USD 0.38 per kWh | Typically 200 to 800 customers | being deployed |
| Cross-border interconnector (Europe)1011 | Each euro invested saves over two in system costs | At least EUR 150 billion for 151 GW in the 2030s (about EUR 1 million per MW, calculated) | 116 GW in 2024; 318 GW optimal by 2040 | mature |
Extending the main grid is cheapest in dense areas; mini-grids are often the least-cost route for remote communities and can be more reliable than weak utility grids. Interconnectors are among the highest-return grid investments in Europe but take more than ten years on average to deliver.
Sources
- How much electricity is lost in electricity transmission and distribution in the United States? (FAQ) US EIA, 2023
- Grid infrastructure investments drive increase in utility spending over last two decades (Today in Energy) US EIA, 2024
- Solar mini grids could power half a billion people by 2030, if action is taken now World Bank, 2022
- Mini Grids for Half a Billion People: Market Outlook and Handbook for Decision Makers (2022 edition) World Bank ESMAP, 2022
- Money on the line: scaling electricity interconnection for Europe's energy future Ember, 2025
- New Ten-Year Network Development Plan highlights power transmission and storage needs to meet the energy transition targets ENTSO-E, 2025
- Spain-France submarine interconnection Red Eléctrica, 2025
- EIB supports with EUR 1.6 bn the strategic Bay of Biscay electricity interconnection between Spain and France European Investment Bank, 2025
- Enedis and ABB partner on SF6-free switchgear Enlit World, 2025
- Transition to SF6-free electrical switchgear will begin in 2026 Finnish Environment Institute (Syke), 2025