Distribution grids, mini-grids and interconnectors: Efficiency and losses
Theft, unpaid bills and why Togo lost 71% of its power
In well-run systems total network losses are around 5%; where theft, unmetered supply and unpaid bills are common the shortfall can be three times higher, and in some African countries much more. Mini-grids add some battery and conversion losses but can be more reliable than weak utility grids.
Chart: Efficiency ranges
Whole chainLosses by measure
| Measure | Range | Type | What is measured |
|---|---|---|---|
| Transmission and distribution losses, United States | 5%1 | Whole chain | Share of electricity transmitted and distributed that is lost, average 2018 to 2022 |
| Transmission and distribution losses, African countries | 6.2 to 71% of output21 | Whole chain | 2014, from Mauritius (lowest) to Togo (highest); South Africa 8.4%, Nigeria 16.1%, Kenya 17.6% (World Bank indicator based on IEA data) |
| Aggregate technical and commercial (AT&C) losses, India | 15.04 to 16.3%45 | Whole chain | Share of energy input not paid for (technical loss, theft, billing and collection shortfalls): 16.3% in FY2023-24, 15.04% in FY2024-25 |
| AT&C losses, India, FY2013-14 | 22.62%4 | Whole chain | Same measure, a decade earlier |
| Uptime, leading African mini-grid developers | 99% of time7 | Theoretical limit | Share of time supply was available in 2021 for Africa Minigrid Developers Association members, up from 90 to 97% in 2018 |
Holding periods and inventory
| Measure | Value |
|---|---|
| Inventory in the wires | None: distribution networks hold no stock, so supply must match demand instantly |
| Mini-grid battery storage | Typically 200 to 500 kWh per site, to carry evening and night demand7 |
| Battery storage on US distribution networks | Utility capital spending rose from USD 97 million in 2022 to USD 723 million in 20232 |
Technical losses are heat in conductors and transformers, highest on long rural feeders and overloaded low-voltage circuits. Commercial (non-technical) losses are power delivered but never paid for: illegal connections, faulty or bypassed meters and uncollected bills. India's AT&C measure combines both, which is why it is much higher than the US technical figure; the very high African figures also include theft and unbilled supply.
In a solar mini-grid, energy cycled through batteries loses a share in charging and discharging, and inverters lose a little more. Load factor matters as much: ESMAP's projected 2030 cost falls from USD 0.29 to USD 0.20 per kWh if average use rises from 22% to 40% of capacity, because fixed costs are spread further and less solar is wasted.
Sources
- How much electricity is lost in electricity transmission and distribution in the United States? (FAQ) US EIA, 2023
- Grid infrastructure investments drive increase in utility spending over last two decades (Today in Energy) US EIA, 2024
- Discoms post INR 2,701 crore profit in FY25 after years of losses (PTI, reporting Ministry of Power statement) Outlook Business, 2026
- Adani Electricity Mumbai, Noida Power and Gujarat discoms top govt ratings Business Standard, 2025
- Mini Grids for Half a Billion People: Market Outlook and Handbook for Decision Makers (2022 edition) World Bank ESMAP, 2022
- Electric power transmission and distribution losses (% of output), country ranking, Africa (World Bank WDI data from IEA) IndexMundi, reproducing World Bank, 2014